View allAll Photos Tagged Line3

路过三号线一号线的转乘通道,发现过道中灯箱都是美术作品,行人在匆匆途中可以欣赏到这些作品,真是不错

 

Raw File: image_3 (Picmarkr).IMAG9031 (edited).20012015

Feb. 2, 2022. Danvers, MA.

Climate activists from 350 Mass and other local climate change groups held a protest at the Danversport Yacht Club where the North Shore Chamber of Commerce was holding its “Business Insight Breakfast: Energy Forum.” The breakfast focused on renewable energy and featured speaker from Enbridge and National Grid. According to protesters both Enbridge and National grid have failed to transition to clean energy and are greenwashing the public by refusing to make hard commitments to immediately transition off fossil fuels. Enbridge and National Grid continue to fund fossil fuel projects. Enbridge built a gas compressor in Weymouth, MA despite local concerns about safety of the surrounding community and constructed Line 3 in Minnesota through untouched wetlands and the treaty territories of Anishinaabe peoples and is currently under investigation for aquifer breaches while National Grid is constructing pipelines and replacing liquified natural gas vaporizers as well as investing billions in gas pipelines.

  

Metro rail construction, Stage-III, Line 3 in progress at Secunderabad for metro bridge at Oliphant bridge/railway underpass near Rathifile bus terminal towards and Secunderabad metro station {East} near Uppal bus stand.

 

Raw File: .

Date: 05-DEC-2016.

Upload Date: 21-DEC-2016.

Habsiguda station of Hyderabad Metro Rail (HMR) by L&T Metro Rail (Hyderabad). This pic is towards Habsiguda-Nacharam junction from bus stop and is part of Stage-I (Nagole-Mettuguda) of Line 3 (Nagole-Shilparamam). Lighting works (including station underbelly) are completed.

 

Check the old pics of this station by me to compare the progress

 

(Latest first)

www.flickr.com/photos/world8115/14569881710/

www.flickr.com/photos/world8115/14569910169/

www.flickr.com/photos/world8115/14569876290/

www.flickr.com/photos/world8115/14756250752/

www.flickr.com/photos/world8115/14756560425/

www.flickr.com/photos/world8115/14478053851

www.flickr.com/photos/world8115/14125296167

 

Raw File: image_2 (Watermark Factory).IMAG9764.19042015

1号线 【延长路站】

Line 1 -- Yanchang Road Station

Feb. 2, 2022. Danvers, MA.

Climate activists from 350 Mass and other local climate change groups held a protest at the Danversport Yacht Club where the North Shore Chamber of Commerce was holding its “Business Insight Breakfast: Energy Forum.” The breakfast focused on renewable energy and featured speaker from Enbridge and National Grid. According to protesters both Enbridge and National grid have failed to transition to clean energy and are greenwashing the public by refusing to make hard commitments to immediately transition off fossil fuels. Enbridge and National Grid continue to fund fossil fuel projects. Enbridge built a gas compressor in Weymouth, MA despite local concerns about safety of the surrounding community and constructed Line 3 in Minnesota through untouched wetlands and the treaty territories of Anishinaabe peoples and is currently under investigation for aquifer breaches while National Grid is constructing pipelines and replacing liquified natural gas vaporizers as well as investing billions in gas pipelines.

  

Girder to place metro viaducts near Madhapur. Part of Avasa hotel and My home hub can be seen on the left side.

 

The Phase-I of the project Hyderabad Metro Rail under-construction near Hitec City in Hyderabad. The concessionaire for the project is L&T Metro Rail (Hyderabad) Ltd. This stretch is part of Stage-IV (Begumpet-Shilparamam/Raidurg) part of Line 3 from Nagole to Shilparamam,

 

Raw File: image_55 (Picmarkr).IMAG8853.20122014

 

Nagole Metro Station of Hyderabad Metro Rail (HMR) Phase-I under-construction. Freshly coated pillars of the station can be seen in the pic. The concessionaire for the project is L&T Metro Rail (Hyderabad) Ltd. This stretch is part of Stage-I (Nagole-Mettuguda) part of Line 3 from Nagole to Shilparamam.

 

Test run on this line started on 07-AUG-2014. Trial runs are expected to launch soon and expected completion of this stage is Mar/Apr 2015 on schedule.

 

Raw File: image_09 (Picmarkr).IMAG7731.13082014

Nambu Bus Terminal

line 3

1 2 ••• 23 24 26 28 29 ••• 79 80