View allAll Photos Tagged Line3

Metro rail construction, Stage-III, Line 3 in progress at Secunderabad for metro bridge at Oliphant bridge/railway underpass near Rathifile bus terminal towards and Secunderabad metro station {East} near Uppal bus stand.

 

Raw File: .

Date: 05-DEC-2016.

Upload Date: 21-DEC-2016.

2号线 【浦东国际机场站】

Line 2 -- Pudong International Airport Station

1号线 【汉中路】

Line 1 -- Hanzhong Road

Photo prise à l'arrêt Esplanade, Bruxelles (ligne 3)

 

Picture taken in Brussels, Esplanade (line 3)

Hyderabad Metro Rail Project Phase-I under construction in Begumpet near Taj Vivanta part of Stage III of Line-3 part of Phase-I (71+ km) of the project.

Raw File: image_17 (Picmarkr).IMAG6724.12042014

Metro rail construction, Stage-III, Line 3 in progress at Secunderabad for metro bridge at Oliphant bridge/railway underpass near Rathifile bus terminal towards and Secunderabad metro station {East} near Uppal bus stand.

 

Raw File: .

Date: 05-DEC-2016.

Upload Date: 21-DEC-2016.

U-bahn, line 3, Volkstheater Station, Vienna, Austria

Company: Kolumbus

Operator: Norgesbuss

Line: 6 Sandnes via UiS

Bus number: 2208

Registration plates: RL 10559

Bus: Mercedes-Benz O530G Citaro C2

 

-----------------------------------------------------------------------------------------

 

Company: Kolumbus

Operator: Norgesbuss

Line: 3 Viste Hageby

Bus number: 2349

Registration plates: RL 10379

Bus: Volvo 8900 Euro 6 (12m)

 

Contact me if you want to use the photo

Water protector protesters camp on the banks of the Mississippi River near the headwaters at the site where the Enbridge Line 3 oil pipeline is set to cross the river.

Metro Rail construction near Rasoolpura at NTR statue (Minister Road) Junction on Sardar Patel Road part of IRR.

 

Raw File: image_6 (Picmarkr).IMAG9035.20012015

Company: Kolumbus

Operator: Norgesbuss

Line: 3 Forus via Stavanger

Bus number: 2259

Registration plates: RL 11234

Bus: Mercedes-Benz O530G Citaro C2

 

Contact me if you want to use the photo the photo

Metro rail construction, Stage-III, Line 3 in progress at Secunderabad for metro bridge at Oliphant bridge/railway underpass near Rathifile bus terminal towards and Secunderabad metro station {East} near Uppal bus stand.

 

Raw File: .

Date: 05-DEC-2016.

Upload Date: 21-DEC-2016.

Hyderabad Metro Rail project under-construction at Uppal Ring Road Junction approaching the metro station. This is part of the Stage-I (Nagole to Mettuguda) of Line-3 (Nagole-Shilparamam) of 71+km Phase-I being built in entirety by the concessionaire L&T Metro Rail (Hyderabad) (www.ltmetro.in/). This stage is entirely on Inner Ring Road (IRR).

Raw File: image_21 (Picmarkr).DSC08692.02052014

Split viaducts of metro line at Nagole. The viaduct on the right side of the pic splits from the main viaduct at Nagole and lands into the Uppal depot. The portals support this viaduct and provide support to negotiate the bend.

 

The concessionaire for the project is L&T Metro Rail (Hyderabad) Ltd. This stretch is part of Stage-I (Nagole-Mettuguda) part of Line 3 from Nagole to Shilparamam.

 

Test run on this line started on 07-AUG-2014. Trial runs are expected to launch soon and expected completion of this stage is Mar/Apr 2015 on schedule.

 

Raw File: image_12 (Picmarkr).IMAG7734.13082014

Hyderabad Metro Rail project under-construction in Uppal. This is part of the Stage-I (Nagole to Mettuguda) of Line-3 (Nagole-Shilparamam) of 71+km Phase-I being built in entirety by the concessionaire L&T Metro Rail (Hyderabad) (www.ltmetro.in/). This stage is entirely on Inner Ring Road (IRR).

Raw File: image_22 (Picmarkr).DSC08693.02052014

Metro Rail portals at Maitrivanam

 

Raw File: image_8 (Picmarkr).IMAG9041.20012015

Hyderabad Metro Rail project under-construction near Hanuman temple. This is part of the Stage-I (Nagole to Mettuguda) of Line-3 (Nagole-Shilparamam) of 71+km Phase-I being built in entirety by the concessionaire L&T Metro Rail (Hyderabad) (www.ltmetro.in/). This stage is entirely on Inner Ring Road (IRR).

Raw File: image_14 (Picmarkr).DSC08685.02052014

Company: Kolumbus

Operator: Norgesbuss

Line: 3 Sundelia

Bus number: 2106

Registration plates: RL 10326

Bus: Volvo 8900 Euro 6 (15m)

 

Contact me if you want to use the photo

Feb. 2, 2022. Danvers, MA.

Climate activists from 350 Mass and other local climate change groups held a protest at the Danversport Yacht Club where the North Shore Chamber of Commerce was holding its “Business Insight Breakfast: Energy Forum.” The breakfast focused on renewable energy and featured speaker from Enbridge and National Grid. According to protesters both Enbridge and National grid have failed to transition to clean energy and are greenwashing the public by refusing to make hard commitments to immediately transition off fossil fuels. Enbridge and National Grid continue to fund fossil fuel projects. Enbridge built a gas compressor in Weymouth, MA despite local concerns about safety of the surrounding community and constructed Line 3 in Minnesota through untouched wetlands and the treaty territories of Anishinaabe peoples and is currently under investigation for aquifer breaches while National Grid is constructing pipelines and replacing liquified natural gas vaporizers as well as investing billions in gas pipelines.

  

Company: Kolumbus

Operator: Norgesbuss

Line: 3 Viste Hageby

Bus number: 2260

Registration plates: RL 11235

Bus: Mercedes-Benz O530G Citaro C2

 

Contact me if you want to use the photo the photo

Divest from Wells Fargo!

 

November 6, 2017 - San Francisco

Guerrilla street painting outside Wells Fargo World Headquarters in San Francisco. No funding for fossil fuel pipelines and projects! Action organized by Idle No More SF Bay and allies.

No DAPL - KXL - Trans Mountain Pipeline - Line 3.

 

The image is Thunderbird Woman Rising.

Hyderabad Metro Rail project under-construction near Survey of India. This is part of the Stage-I (Nagole to Mettuguda) of Line-3 (Nagole-Shilparamam) of 71+km Phase-I being built in entirety by the concessionaire L&T Metro Rail (Hyderabad) (www.ltmetro.in/). This stage is entirely on Inner Ring Road (IRR).

Raw File: image_16 (Picmarkr).DSC08687.02052014

09/07/11. Croydon, London. A Bombardier Flexity Swift CR4000.

 

[Line 3]

Metro rail construction, Stage-III, Line 3 in progress at Secunderabad for metro bridge at Oliphant bridge/railway underpass near Rathifile bus terminal towards and Secunderabad metro station {East} near Uppal bus stand.

 

Raw File: .

Date: 05-DEC-2016.

Upload Date: 21-DEC-2016.

Metro rail construction, Stage-III, Line 3 in progress at Secunderabad for metro bridge at Oliphant bridge/railway underpass near Rathifile bus terminal towards and Secunderabad metro station {East} near Uppal bus stand.

 

Raw File: .

Date: 05-DEC-2016.

Upload Date: 21-DEC-2016.

August 27, 2021. Peabody, MA.

Activists gathered at a Chase Bank branch to protest Chase facilitating $1.5 billion in so-called sustainability loans to Enbridge along with other major banks including JPMorgan, Citibank, Bank of America, Wells Fargo and TD Bank. Enbridge is building Line 3, a pipeline that would result in a 10% expansion of the tar sands that activists assert would have the same climate impact as fifty new coal-fired power plants. Enbridge’s “sustainability” loans reward the company for reducing emissions from its buildings and vehicles, but do nothing to address the oil that flows through its pipelines and is responsible for 99% of its climate pollution.

© 2021 Marilyn Humphries

 

Feb. 2, 2022. Danvers, MA.

Climate activists from 350 Mass and other local climate change groups held a protest at the Danversport Yacht Club where the North Shore Chamber of Commerce was holding its “Business Insight Breakfast: Energy Forum.” The breakfast focused on renewable energy and featured speaker from Enbridge and National Grid. According to protesters both Enbridge and National grid have failed to transition to clean energy and are greenwashing the public by refusing to make hard commitments to immediately transition off fossil fuels. Enbridge and National Grid continue to fund fossil fuel projects. Enbridge built a gas compressor in Weymouth, MA despite local concerns about safety of the surrounding community and constructed Line 3 in Minnesota through untouched wetlands and the treaty territories of Anishinaabe peoples and is currently under investigation for aquifer breaches while National Grid is constructing pipelines and replacing liquified natural gas vaporizers as well as investing billions in gas pipelines.

  

04/06/11. Aeschenplatz, Basel. A Schindler Be4/4 "Cornichons".

 

[Line 3]

2472 backing off from the 'tram cemetery'

3098 is seen negotiating Piccadilly Gardens Delta Junction, whilst working a Line 3 Eccles to Ashton under Lyne service, on 22nd February 2018.

1 2 ••• 19 20 22 24 25 ••• 79 80