View allAll Photos Tagged Completion

Roof restoration is nearing completion as roofing installation on the front of African House is completed.

 

Credit: NPS/NCPTT|Sarah Marie Jackson

Certificates like this were given out to aerial gunners after they completed their training at Kingman Army Air Field.

Officially done with elementary school.

Construction of the new indoor sports facility at Drill Hall Common nears completion. The Marie Bashir Mosman Sports Centre will be opened by Her Excellency the the Governor, Professor Marie Bashir AC, CVO on Friday 3 December.

All 60 GLHS students received Certificates of Completion for the "Careers in Medicine" course through the Summit Medical Group Foundation

 

Lt. Governor Karyn Polito joins state and local officials to celebrate the completion of a solar carport at Worcester Business Center on Nov. 2, 2022. [Joshua Qualls/Governor's Press Office]

UTHealth Houston publicly announced the successful completion of the Many Faces. One Mission. campaign, the university’s most ambitious philanthropic effort yet. Thanks to the generosity of 11,315 donors, UTHealth Houston raised $534.4 million to support education, research, and community initiatives across our six schools. University students, faculty, and staff attended celebration stations across the campus, which included cookies, giveaways, and details on the campaign’s impact on each school. (Photos by UTHealth Houston)

With the completion of the inpatient wing, Wake Forest Baptist Health - Davie Medical Center today kept a promise it made to the residents of Davie County a long time ago.

 

“When we first proposed this new hospital, it was always our intent to have an inpatient wing so that people in Davie County could receive care and treatment close to home,” said John D. McConnell, M.D., CEO, Wake Forest Baptist Medical Center. “Today marks the fulfillment of that commitment we made to the citizens of Davie County nine years ago.”

Children who complete the stations which demonstrate pioneer life, can string their own leather & bead necklace.

There are 3 major bridge routes between Honshu and Shikoku, and on our previous trips we had covered the other two (Great Seto Bridge by train and Shimanami Kaido by bike), so cross this bridge over the Naruto Straits into Shikoku marked for us the completion of all possible non-ferry routes between Honshu and Shikoku

More than 14,000 roof slates have been replaced on Saint Patrick’s Cathedral and essential fire protection systems completely upgraded as part of a major renovation project, which, according to the Dean of Saint Patrick’s Cathedral, the Very Revd Dr William Morton, has been the Cathedral’s most significant renovation in 160 years and will secure the 800–year–old medieval building for generations to come.

 

The completion of the building works, announced by Saint Patrick’s Cathedral today (9th September 2021), marks the end of a two–year conservation project, which cost €9.4m and included the replacement of roof slates, gutters and walkways, as well as the repair of masonry, glazing and carpentry.“

 

This is a wonderful moment for Saint Patrick’s Cathedral,” said Dr Morton. “The conservation project has been extremely wide–ranging, and there are many different factors which had to be considered for a heritage restoration project of such a scale.

 

“All slates, for instance, were hand cut individually, and come from the same quarry in Wales as those used for the last major roofing project, undertaken under the stewardship of Sir Benjamin Guinness in the 1860s. The Oak beams in the roof of the Cathedral date from 1320 and are the oldest in–situ roof timbers in Ireland. The custom–made scaffolding and specially designed temporary roof took eight months to erect, and the temporary roof structure was the biggest of its kind ever built in Ireland.

 

“We have been lucky to work with a highly–skilled and dedicated team of architects, engineers and craftspeople. The whole team has been extremely responsive to the challenges of the restoration of this unique heritage building, and the high level of knowledge, skill and craft has been critical in securing its future.”

 

Saint Patrick’s Cathedral has so far raised €6m out of the €9.4m total building cost. This includes a grant of €1.25m from the Department of Housing, Local Government and Heritage, as well as €1.25m raised through a public appeal for sponsorship. However, to make up the balance and meet the total building cost, the Cathedral also had to borrow €3.4m to ensure the completion of the project. The shortfall was caused by the impact of the Covid–19 pandemic, which has seen visitor figures plummet.

 

“The works on the Cathedral started in early 2020, just a few weeks before the Covid–19 pandemic brought many sectors in Ireland – and across the world – to a complete standstill,” said Dr Morton. “As one of Ireland’s major tourist attractions, we would usually welcome around 600,000 visitors per year, however, due to Covid–19, our number of visitors in 2020 dropped by almost 90% and we’re expecting similar figures for 2021. This means that, unfortunately, the tourist income which we had intended to use to fund a portion of the building cost did not materialise and the unforeseen borrowings will place a financial strain on our operations for many years to come.

 

“We have therefore decided to continue our ‘Sponsor a Slate’ fundraising campaign and invite anyone with an interest in Saint Patrick’s Cathedral to become a part of its living history. We are so grateful to all of those who have already become sponsors. Their generous financial support of nearly €40,000 to date, as well as the significant grant we received from the Department of Heritage, have been crucial in bringing the project to fruition.”

 

Saint Patrick’s Cathedral has opened a pop–up exhibition in its south transept, which can be seen as part of a visit to the Cathedral.

 

The exhibition includes large–scale photographs and video footage captured during the building works, as well as samples of roof tiles and interpretive panels, which provide information about the conservation process.

 

Dr Morton said: “The idea behind the exhibition is to offer visitors a ‘behind the scenes’ glimpse of the conservation works. While the works have been very visible to the local community and visitors to the area through the cranes, scaffolding and temporary roof, we hope the photos, video footage and panels will provide a different insight into the project.

 

“The Cathedral re–opened to visitors several weeks ago and we invite anyone, be they locals, staycationers or international tourists, to visit us, see our exhibition and experience a fascinating microcosm of 800 years of history.”

Seventy-one Freestate ChalleNGe cadets from Maryland graduated from a 22-week quasi-military residential program for qualified at-risk youth June 23, 2018. While enrolled in the ChalleNGe program, participants prepare to take the GED test and were introduced to many programs and concepts that are necessary for a successful and healthy lifestyle. Administered by the Maryland National Guard, the program helps young adults acquire and refine the skills and strengths necessary to take more productive roles in our communities. The residential portion of the program is followed up with a 12-month mentoring phase designed to help graduates adjust to the world of work and follow-on education. The Freestate ChalleNGe Academy was established in 1993 and has graduated more than 4,000 cadets.

Completion 2020 by Peter Knight

Finally the last mile has been completed. And now the bike trail is done from Pittsburgh to Washington DC. The GAP runs from Pittsburgh to Cumberland, MD and is 150 miles. At Cumberland, the trail becomes the C&O Towpath to DC and runs 184 miles.

 

I participated in the GAP Completion ceremonies and parties on Saturday, June 15. Parked 20 miles from downtown Pittsburgh in 'Little Boston', and then rode north to join in the fun. This 20 mile section was the only portion of the 330 route from DC I hadn't ridden yet. I purposely waited for the last 1 mile to be completed at Sandcastle Water Park. What a great day I had. Excellent urban biking over there.....simply excellent!

On Feb. 28, a ribbon-cutting ceremony marked the completion of critical, time-sensitive repairs to Schlatterweiher Dam at U.S. Army Garrison Bavaria. Located within the Grafenwoehr Training Area and impacting several ranges, construction teams raced against the clock to successfully complete the work on-time as to not disrupt the 7th Army Training Command’s training schedule and overall mission readiness.

Colonel Frank Tate, 25th Combat Aviation Brigade’s commander (Left) and Command Sergeant Major Jesus Ruiz, Brigade Command Sergeant Major (R) pose with Defense Language Institute instructors, during Certification of Completion of the Pashto General Purpose Forces Course, at the MROE Building on Wheeler Army Airfield, HI, Nov. 30.

Diplomas awarded for completion of UDG Agora 2016 cohort udg.theagoraonline.net

The UCD Intern Career Advice Day was held on Saturday 9th November 2019 in the Catherine McAuley Education & Research Centre, Nelson Street, Dublin 7. Over 95 UCD interns attended keynote talks and practice interviews to better prepare for their upcoming BST applications in 2020 and benefitted from career advice and mentoring from our dedicated team of UCD Academics and associated colleagues. UCD interns upon successful completion of their CPD Intern Training Programme can progress onto a Basic Specialist Training Scheme.

Nearing completion, and replacing the former Southwark Towers, The Shard (or Shard London Bridge).

 

Architect: Renzo Piano

Developer: Sellar Property Group

Structural engineers: Turner & Townsend; WSP Cantor Seinuk; Robert Bird Group; Ischebeck Titan.

 

Construction began March 2009, with a planned completion date of May 2012 (now extended to July 2012).

 

The Shard is 304,1m tall (309.6m including the antenna) with 72 habitable floors and a further 23 floors holding plant etc.

 

Taken travelling down the Thames

Tile floor job almost finished. Here the grout is still wet. It dried a bit lighter.

Opening Performance by Nee Soon Zone '10' RC Taekwondo Group.

1 2 ••• 26 27 29 31 32 ••• 79 80