Poids en ordre de marche : 109 400 - 131 600 kg
Hauteur de travail : 41 m
Déconstruction de la Tour de la cité administrative à Colmar.
Pays : France 🇫🇷
Région : Grand Est (Alsace)
Département : Haut-Rhin (68)
Ville : Colmar (68000)
Quartier : Saint-Léon
Adresse : rue Fleischhauer
Fonction : Administration
Construction : ≈1970
Déconstruction : 2024
Niveaux : R+13
Hauteur : 45,00 m
The City of Hoover has seen enormous growth in its sports programs over the past 10 years and needed a new complex that would fulfill their existing needs, allow for growth and give the City the ability to create new revenue streams and take advantage of sports tourism by hosting large tournament events. Hoover had not built any new athletic facilities in 15 years. At the same time the City’s sports participation had increased by multiples of 200% - 500% depending on the sport. The growth was caused by increases in both youth and adult sports leagues, as well as the relatively recent popularity of additional sports.
The multi-purpose Finley Center, which connects to the existing Hoover Met baseball stadium with a covered walkway, is able to accommodate a full-size football or soccer field, nine regulation-size basketball courts, 12 regulation-size volleyball courts or six indoor tennis courts. It can also seat 2,400 for banquets and 5,000 for events with general seating, such as a graduation ceremony or concert. Additional features of the indoor facility include a recreational walking track suspended 14 feet in the air, an athletic training and rehab center, and a food court.
The Finley Center sits on a 120 acre site that GMC master planned and includes fields for soccer, lacrosse, football, baseball and softball, tennis courts, a play ground walking track and splash pad.
Goodwyn, Mills and Cawood (GMC) provided master planning, architecture, interior design, civil engineering, construction materials testing, and environmental engineering services for this project.
The City of Hoover has seen enormous growth in its sports programs over the past 10 years and needed a new complex that would fulfill their existing needs, allow for growth and give the City the ability to create new revenue streams and take advantage of sports tourism by hosting large tournament events. Hoover had not built any new athletic facilities in 15 years. At the same time the City’s sports participation had increased by multiples of 200% - 500% depending on the sport. The growth was caused by increases in both youth and adult sports leagues, as well as the relatively recent popularity of additional sports.
The multi-purpose Finley Center, which connects to the existing Hoover Met baseball stadium with a covered walkway, is able to accommodate a full-size football or soccer field, nine regulation-size basketball courts, 12 regulation-size volleyball courts or six indoor tennis courts. It can also seat 2,400 for banquets and 5,000 for events with general seating, such as a graduation ceremony or concert. Additional features of the indoor facility include a recreational walking track suspended 14 feet in the air, an athletic training and rehab center, and a food court.
The Finley Center sits on a 120 acre site that GMC master planned and includes fields for soccer, lacrosse, football, baseball and softball, tennis courts, a play ground walking track and splash pad.
Goodwyn, Mills and Cawood (GMC) provided master planning, architecture, interior design, civil engineering, construction materials testing, and environmental engineering services for this project.
13th MIDAS International Conference took place at Cracow University of Technology in Poland on 7th of May, 2014. About 200 professional engineers, researchers and PhD students joined the conference.
Travaux sur le réseau électrique.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Centre
Adresses : rue Gambetta / rue Saint-Dizier
CSU's ASCE Concrete Canoe Team hosts the Rocky Mountain Regional competition at Horsetooth Reservoir. April 5, 2014
These are large polystyrene blocks used as lightweight fill in the construction/civil engineering industry
eEngineers provide innovative outsourcing solutions & design for architectural services, civil engineering, structural engineering, MEP, architects & engineers.
The City of Hoover has seen enormous growth in its sports programs over the past 10 years and needed a new complex that would fulfill their existing needs, allow for growth and give the City the ability to create new revenue streams and take advantage of sports tourism by hosting large tournament events. Hoover had not built any new athletic facilities in 15 years. At the same time the City’s sports participation had increased by multiples of 200% - 500% depending on the sport. The growth was caused by increases in both youth and adult sports leagues, as well as the relatively recent popularity of additional sports.
The multi-purpose Finley Center, which connects to the existing Hoover Met baseball stadium with a covered walkway, is able to accommodate a full-size football or soccer field, nine regulation-size basketball courts, 12 regulation-size volleyball courts or six indoor tennis courts. It can also seat 2,400 for banquets and 5,000 for events with general seating, such as a graduation ceremony or concert. Additional features of the indoor facility include a recreational walking track suspended 14 feet in the air, an athletic training and rehab center, and a food court.
The Finley Center sits on a 120 acre site that GMC master planned and includes fields for soccer, lacrosse, football, baseball and softball, tennis courts, a play ground walking track and splash pad.
Goodwyn, Mills and Cawood (GMC) provided master planning, architecture, interior design, civil engineering, construction materials testing, and environmental engineering services for this project.
There's clearly something missing in this shot, and no, they're not setting up for an Eddie Kidd style bike jump (do people still do those?).
This is a bloody tricky civil engineering project. The Churchill Way flyovers in the City Centre are sick and crumbling and they need to come down. They're not going to be replaced, and that's a whole other story, but that can wait.
The tricky thing is that they span some major roads and junctions which just can't be closed for months.
Instead, the engineers are working nights and weekends to cut the flyover into sections which are lowered on jacks to the ground and then relocated to a very close site to be chipped. It's quite a clever solution, and whilst I shudder to think what it's costing we don't have a choice. Let's hope it's all over soon.
The City of Hoover has seen enormous growth in its sports programs over the past 10 years and needed a new complex that would fulfill their existing needs, allow for growth and give the City the ability to create new revenue streams and take advantage of sports tourism by hosting large tournament events. Hoover had not built any new athletic facilities in 15 years. At the same time the City’s sports participation had increased by multiples of 200% - 500% depending on the sport. The growth was caused by increases in both youth and adult sports leagues, as well as the relatively recent popularity of additional sports.
The multi-purpose Finley Center, which connects to the existing Hoover Met baseball stadium with a covered walkway, is able to accommodate a full-size football or soccer field, nine regulation-size basketball courts, 12 regulation-size volleyball courts or six indoor tennis courts. It can also seat 2,400 for banquets and 5,000 for events with general seating, such as a graduation ceremony or concert. Additional features of the indoor facility include a recreational walking track suspended 14 feet in the air, an athletic training and rehab center, and a food court.
The Finley Center sits on a 120 acre site that GMC master planned and includes fields for soccer, lacrosse, football, baseball and softball, tennis courts, a play ground walking track and splash pad.
Goodwyn, Mills and Cawood (GMC) provided master planning, architecture, interior design, civil engineering, construction materials testing, and environmental engineering services for this project.
Rockville, Pennsylvania
Completed 1902
The greatest forward movement in the building of stone railroad bridges in America began in 1888, when the Pennsylvania Railroad company, under the direction of chief engineer William Brown, commenced replacing its wood and iron bridges with permanent ones of stone and concrete...
- Henry G. Tyrrell, History of Bridge Engineering, 1911
The third bridge built on the same site to carry railroad tracks across the Susquehanna River just north of Harrisburg, Pennsylvania, the Rockville Stone Arch Bridge, at 3,820 feet long and 52 feet wide, is believed to be the longest and widest stone-arch railroad bridge in the world. A central link in rail travel between New York City and Pittsburgh, the Rockville Stone Arch Bridge accommodates four lines of railroad tracks, today serving both the Norfolk Southern and Amtrak lines.
At the time of its construction, the Rockville Stone Arch Bridge represented the high point of the Pennsylvania Railroad's program in the late 19th century to replace all wooden and iron bridges with stone and concrete structures. It also demonstrated the successful evolution of stone-arch bridge-building in America, placing 48 spans of 70 feet each across the flood-prone Susquehanna and eliminating a significant bottleneck on the main Pennsylvania Railroad line.
Facts
With a concrete core encased in stone facing and stone arches, the Rockville Stone Arch Bridge was built in manner resembling the acqueducts of the Roman Empire. Serving its purpose for a century, the Rockville Stone Arch Bridge has survived not only record-setting floods but also substantial increases in load weights.
The Rockville Stone Arch Bridge replaced an iron, two-track bridge built in 1877, and an earlier, wooden bridge carrying a single track, completed in 1850. The wooden structure, based on the Howe-truss design with added Burr arches, comprised 23 spans for a total of 3670 feet.
For more information on civil engineering history, go to www.asce.org/history.
Comments always appreciated, as long as you keep it clean - I love to hear your feedback! xx
I went for a visit to Derby for their comedy festival and to spend the weekend with Gemma.
Saturday morning we went to Belper to the river gardens and the horseshoe weir, which is an incredible piece of civil engineering!
The gardens are lovely and tranquil. It was a great little alternative to our usual trip to Dovedale - which we called off because the weather wasn't great.
Had a lovely morning though!
The City of Hoover has seen enormous growth in its sports programs over the past 10 years and needed a new complex that would fulfill their existing needs, allow for growth and give the City the ability to create new revenue streams and take advantage of sports tourism by hosting large tournament events. Hoover had not built any new athletic facilities in 15 years. At the same time the City’s sports participation had increased by multiples of 200% - 500% depending on the sport. The growth was caused by increases in both youth and adult sports leagues, as well as the relatively recent popularity of additional sports.
The multi-purpose Finley Center, which connects to the existing Hoover Met baseball stadium with a covered walkway, is able to accommodate a full-size football or soccer field, nine regulation-size basketball courts, 12 regulation-size volleyball courts or six indoor tennis courts. It can also seat 2,400 for banquets and 5,000 for events with general seating, such as a graduation ceremony or concert. Additional features of the indoor facility include a recreational walking track suspended 14 feet in the air, an athletic training and rehab center, and a food court.
The Finley Center sits on a 120 acre site that GMC master planned and includes fields for soccer, lacrosse, football, baseball and softball, tennis courts, a play ground walking track and splash pad.
Goodwyn, Mills and Cawood (GMC) provided master planning, architecture, interior design, civil engineering, construction materials testing, and environmental engineering services for this project.
This is where platforms 11-15 will be. 11 goes on the back of the existing 10 (left). The others will run towards the camera.
The City of Hoover has seen enormous growth in its sports programs over the past 10 years and needed a new complex that would fulfill their existing needs, allow for growth and give the City the ability to create new revenue streams and take advantage of sports tourism by hosting large tournament events. Hoover had not built any new athletic facilities in 15 years. At the same time the City’s sports participation had increased by multiples of 200% - 500% depending on the sport. The growth was caused by increases in both youth and adult sports leagues, as well as the relatively recent popularity of additional sports.
The multi-purpose Finley Center, which connects to the existing Hoover Met baseball stadium with a covered walkway, is able to accommodate a full-size football or soccer field, nine regulation-size basketball courts, 12 regulation-size volleyball courts or six indoor tennis courts. It can also seat 2,400 for banquets and 5,000 for events with general seating, such as a graduation ceremony or concert. Additional features of the indoor facility include a recreational walking track suspended 14 feet in the air, an athletic training and rehab center, and a food court.
The Finley Center sits on a 120 acre site that GMC master planned and includes fields for soccer, lacrosse, football, baseball and softball, tennis courts, a play ground walking track and splash pad.
Goodwyn, Mills and Cawood (GMC) provided master planning, architecture, interior design, civil engineering, construction materials testing, and environmental engineering services for this project.
Travaux d'aménagement d'une plateforme logistique dans la ZAC Bouxières-Lesménils.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Lesménils (54700)
Adresse : rue de Lesménils-Bouxières
Construction : 2025 → 2026
Permis de construire n° PC 54 091 22 N00002
Hauteur : 16,00 m
Surface de plancher : 6 145 m²
Superficie du terrain : 55 879 m²