Crews continue to do ground improvement work to reinforce the soil under future utility, sidewalk and other hardscape areas at the Integrated Sciences Complex. Concrete pile caps are being installed in the service and supply tunnel construction area and other reinforcing steel and concrete work continues on the ISC foundation.

Crews continue to do ground improvement work to reinforce the soil under future utility, sidewalk and other hardscape areas at the Integrated Sciences Complex. Concrete pile caps are being installed in the service and supply tunnel construction area and other reinforcing steel and concrete work continues on the ISC foundation.

The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.

Nieuwbouw JuBi (Ministeries van Justitie en Binnenlandse Zaken) in Den Haag. Mijn werkgever Brink Groep verricht de directievoering en toezicht bij dit project. De 2 torens zullen een hoogte bereiken van 143 m!

 

Building project of the ministries of Justice and Interior in The Hague. My employer Brink Groep is doing the building management of this project. This 2 towers will reach a height of 143 m!

 

15 images shot with a 5D2+14/2.8 stitched with Hugin

The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.

This is a 3' x 5' banner I made as an "advertisement" for the Building Project--it was going to be posted at our construction site for the next few years. It got rejected because of the overly heroic house and because it's supposed to be PR for Common Ground, not the BP.

 

This is the original vector version I made with a combination of Rhino and Illustrator.

Crews continue to do ground improvement work to reinforce the soil under future utility, sidewalk and other hardscape areas at the Integrated Sciences Complex. Concrete pile caps are being installed in the service and supply tunnel construction area and other reinforcing steel and concrete work continues on the ISC foundation.

Image of the Margarido House, "the first new home in the country to be both LEED-H certified and greenpoint rated." MTI's moisture control products are included in this building. Visit our website to learn more about us: www.mtidry.com/

The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.

Crews continue to do ground improvement work to reinforce the soil under future utility, sidewalk and other hardscape areas at the Integrated Sciences Complex. Concrete pile caps are being installed in the service and supply tunnel construction area and other reinforcing steel and concrete work continues on the ISC foundation.

Crews continue to do ground improvement work to reinforce the soil under future utility, sidewalk and other hardscape areas at the Integrated Sciences Complex. Concrete pile caps are being installed in the service and supply tunnel construction area and other reinforcing steel and concrete work continues on the ISC foundation.

The former laboratory will be transformed into housing.

Akron Children’s Hospital launched its Graffiti Project to honor current and former patients on the new medical building currently under construction on the Akron campus.

👉 Check out all our links here: linktr.ee/darling110pin

 

🌵☀️ Rising from the rugged desert landscape, this wooden frame marks the beginning of a new dream cabin! Surrounded by towering saguaros, rocky hills, and endless blue skies, the structure stands as a testament to creativity and self-reliance.

 

🔨 With its sturdy foundation and simple lines, this build captures the spirit of adventure and the beauty of off-grid living. A perfect blend of rustic charm and modern possibilities — your own desert oasis in the making!

The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.

Crews continue to do ground improvement work to reinforce the soil under future utility, sidewalk and other hardscape areas at the Integrated Sciences Complex. Concrete pile caps are being installed in the service and supply tunnel construction area and other reinforcing steel and concrete work continues on the ISC foundation.

The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.

The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.

Groundbreaking Ceremony for the New Silver Spring Library Building, August 30, 2010, corner of Wayne Avenue and Fenton Street.

Crews continue to do ground improvement work to reinforce the soil under future utility, sidewalk and other hardscape areas at the Integrated Sciences Complex. Concrete pile caps are being installed in the service and supply tunnel construction area and other reinforcing steel and concrete work continues on the ISC foundation.

The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.

Groundbreaking Ceremony for the New Silver Spring Library Building, August 30, 2010, corner of Wayne Avenue and Fenton Street.

Crews continue to do ground improvement work to reinforce the soil under future utility, sidewalk and other hardscape areas at the Integrated Sciences Complex. Concrete pile caps are being installed in the service and supply tunnel construction area and other reinforcing steel and concrete work continues on the ISC foundation.

Structural steel for the Integrated Sciences Complex arrived on Wednesday, December 21, and the steelworkers have been busy erecting two stories of columns and beams on the north wing. The university community will see the ISC take shape as steel continues to go up and metal decks, concrete slabs and fireproofing are installed through the spring.

 

Photos by Harry Brett

The large crane will leave the Integrated Sciences Complex site as ironworkers near the end of installing structural steel. Crews are pouring concrete for the floors in the new building.

 

Photos by: Harry Brett

normally, the division of labor at our house is:

 

~ heavy lifting/building stuff: husband

 

~ cooking/sewing: me

 

yesterday, i helped husband load a big pile of wood neatly into this container. and being part of what's normally "his job" was surprisingly satisfying. it gave me a strong sense of exactly how in-this-project-together we really are.

 

77:365

Structural steel for the Integrated Sciences Complex arrived on Wednesday, December 21, and the steelworkers have been busy erecting two stories of columns and beams on the north wing. The university community will see the ISC take shape as steel continues to go up and metal decks, concrete slabs and fireproofing are installed through the spring.

 

Photos by Harry Brett

Structural steel for the Integrated Sciences Complex arrived on Wednesday, December 21, and the steelworkers have been busy erecting two stories of columns and beams on the north wing. The university community will see the ISC take shape as steel continues to go up and metal decks, concrete slabs and fireproofing are installed through the spring.

 

Photos by Harry Brett

The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.

Structural steel for the Integrated Sciences Complex arrived on Wednesday, December 21, and the steelworkers have been busy erecting two stories of columns and beams on the north wing. The university community will see the ISC take shape as steel continues to go up and metal decks, concrete slabs and fireproofing are installed through the spring.

 

Photos by Harry Brett