View allAll Photos Tagged BuildingProject

Image of the Margarido House, "the first new home in the country to be both LEED-H certified and greenpoint rated." MTI's moisture control products are included in this building. Visit our website to learn more about us: www.mtidry.com/

Crews continue to do ground improvement work to reinforce the soil under future utility, sidewalk and other hardscape areas at the Integrated Sciences Complex. Concrete pile caps are being installed in the service and supply tunnel construction area and other reinforcing steel and concrete work continues on the ISC foundation.

The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.

Construction crews ease the equipment above a plywood covered area in the new electrical switchgear building at the University of Massachusetts Boston.

The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.

An HDR of our new office. Almost ready for us to move in.

The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.

A forklift maneuvers the electrical equipment into the new building at the University of Massachusetts Boston.

Akron Children’s Hospital launched its Graffiti Project to honor current and former patients on the new medical building currently under construction on the Akron campus.

The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.

The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.

The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.

The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.

This is a 3' x 5' banner I made as an "advertisement" for the Building Project--it was going to be posted at our construction site for the next few years. It got rejected because of the overly heroic house and because it's supposed to be PR for Common Ground, not the BP.

 

This is a sexed up version I made in Photoshop based on the original vector version, partially inspired by ISO50/Scott Hansen's awesome work. I have a hard time getting the same visceral texture he does, not to mention the simultaneously saturated and faded color palette.

 

The kerning needs some work.

The large crane will leave the Integrated Sciences Complex site as ironworkers near the end of installing structural steel. Crews are pouring concrete for the floors in the new building.

 

Photos by: Harry Brett

Crews continue to do ground improvement work to reinforce the soil under future utility, sidewalk and other hardscape areas at the Integrated Sciences Complex. Concrete pile caps are being installed in the service and supply tunnel construction area and other reinforcing steel and concrete work continues on the ISC foundation.

The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.

A green tarp covers the new electrical switchgear building at the University of Massachusetts Boston.

The first section of switchgear equipment is moved into place at UMass Boston.

The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.

The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.

Crews continue to do ground improvement work to reinforce the soil under future utility, sidewalk and other hardscape areas at the Integrated Sciences Complex. Concrete pile caps are being installed in the service and supply tunnel construction area and other reinforcing steel and concrete work continues on the ISC foundation.

👉 Check out all our links here: linktr.ee/darling110pin

 

🌵☀️ Rising from the rugged desert landscape, this wooden frame marks the beginning of a new dream cabin! Surrounded by towering saguaros, rocky hills, and endless blue skies, the structure stands as a testament to creativity and self-reliance.

 

🔨 With its sturdy foundation and simple lines, this build captures the spirit of adventure and the beauty of off-grid living. A perfect blend of rustic charm and modern possibilities — your own desert oasis in the making!

Crews continue to do ground improvement work to reinforce the soil under future utility, sidewalk and other hardscape areas at the Integrated Sciences Complex. Concrete pile caps are being installed in the service and supply tunnel construction area and other reinforcing steel and concrete work continues on the ISC foundation.

The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.

More than 2,000 yards of concrete has been place for the Integrated Sciences Complex 16-inch base slab. Utility excavation and work continue on both the east and south sides of the ISC construction site. Work continues in the service and supply tunnel.

With five floors of steel columns and beams and metal decking in place on the north wing of the Integrated Sciences Complex, structural steel and decking continues to be erected on the east wing. More steel continues to be fabricated in New Hampshire for the ISC sixth floor mechanical penthouse.

Crews continue to do ground improvement work to reinforce the soil under future utility, sidewalk and other hardscape areas at the Integrated Sciences Complex. Concrete pile caps are being installed in the service and supply tunnel construction area and other reinforcing steel and concrete work continues on the ISC foundation.

Groundbreaking Ceremony for the New Silver Spring Library Building, August 30, 2010, corner of Wayne Avenue and Fenton Street.

Crews continue to do ground improvement work to reinforce the soil under future utility, sidewalk and other hardscape areas at the Integrated Sciences Complex. Concrete pile caps are being installed in the service and supply tunnel construction area and other reinforcing steel and concrete work continues on the ISC foundation.

Now the stupid and bad English language has got us speaking of two unrelated concepts as "piles": I-beams driven vertically into the earth are "H-piles" and mounds of earth are "dirtpiles." Pah!

 

-----------------------

 

In St. Paul, Minnesota, on November 8th, 2016, on the north side of University Avenue, east of Victoria Street.

 

-----------------------

 

Library of Congress classification ideas:

TA145 Construction projects—United States—Pictorial works.

TH23 Building—United States—Pictorial works.

TA786 Steel piling—Pictorial works.

NA7205 Architecture, Domestic—United States—Pictorial works.

NA9053.S7 Streetscapes (Urban design)—United States—Pictorial works.

F614.S4 Frogtown (Saint Paul, Minn.)—Pictorial works.

F614.S4 Thomas-Dale Neighborhood (Saint Paul, Minn.)—Pictorial works.

F614.S4 Saint Paul (Minn.)—Pictorial works.

The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.

Crews continue to do ground improvement work to reinforce the soil under future utility, sidewalk and other hardscape areas at the Integrated Sciences Complex. Concrete pile caps are being installed in the service and supply tunnel construction area and other reinforcing steel and concrete work continues on the ISC foundation.

All the new electrical switchgear is placed at the University of Massachusetts Boston.

The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.

The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.

Crews continue to do ground improvement work to reinforce the soil under future utility, sidewalk and other hardscape areas at the Integrated Sciences Complex. Concrete pile caps are being installed in the service and supply tunnel construction area and other reinforcing steel and concrete work continues on the ISC foundation.

1 2 3 5 7 ••• 79 80