Photos from the yearly Illuminating York festival, in York city centre.
This year there were 2 main centre-pieces, a stunning 15 minute 3D-projection mapping display onto Castle Museum entitled "Envisions" by United VJs & GaiaNova and "Contours" by Karen Monid (pictured), a sound and light installation in Dean's park next to the Minster utilising lights, projectors and booming voices of 7 languages including old Norse, Icelandic and Swedish.
The 3d Projection mapping was particularly impressive, with explosions, crumbling buildings, skeletons, trains and a riot of colours all swirling around to a banging Adam Freeland soundtrack.
The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.
Akron Children’s Hospital launched its Graffiti Project to honor current and former patients on the new medical building currently under construction on the Akron campus.
The construction fence wrap which will encompass the Integrated Sciences Complex (ISC) during construction on the University of Massachusetts Boston campus, was installed on May 31, 2011.
Garbage shed, stairs and fence designed and built by me this summer for my daughters family the summer of 2016.
The sandpit with bench was built for my grandson in 2015.
The garbage shed was designed in Google SketchUp Make (free) and the complete model can be downloaded from the SketchUp 3D Warehouse. If you want it, search there for "Garbage shed for 2 x 140 liter + 1 x 240 liter bins"
Photos from the yearly Illuminating York festival, in York city centre.
This year there were 2 main centre-pieces, a stunning 15 minute 3D-projection mapping display onto Castle Museum entitled "Envisions" by United VJs & GaiaNova (pictured) and "Contours" by Karen Monid, a sound and light installation in Dean's park next to the Minster utilising lights, projectors and booming voices of 7 languages including old Norse, Icelandic and Swedish.
The 3d Projection mapping was particularly impressive, with explosions, crumbling buildings, skeletons, trains and a riot of colours all swirling around to a banging Adam Freeland soundtrack.
Utility and tunnel work are underway at the Integrated Sciences Complex. Storm, sewer and drainage piping as well as electrical and IT conduit are being installed. Concrete continues to be poured for the elevator shafts and tunnel leading to the Service and Supply Building. A total of 8,500 cy of concrete will be placed during the construction of the Integrated Sciences Complex.
DOEL, BELGIUM - 16/01/2006 - POLITICS / SOCIAL,
Due to the buildingproject of the new deurganckdok, the villagers of Doel are forced to leave their homes.
©Christophe Vander Eecken
The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.
The construction fence wrap which will encompass the Integrated Sciences Complex (ISC) during construction on the UMass Boston campus, was installed on May 31, 2011.
The construction fence wrap which will encompass the Integrated Sciences Complex (ISC) during construction on the University of Massachusetts Boston campus, was installed on May 31, 2011.
As the invasion of people from the east continues, fences are erected all over Europe and now there are fences in Leiden too.
Groundbreaking Ceremony for the New Silver Spring Library Building, August 30, 2010, corner of Wayne Avenue and Fenton Street.
The construction fence wrap which will encompass the Integrated Sciences Complex (ISC) during construction on the University of Massachusetts Boston campus, was installed on May 31, 2011.
The large crane will leave the Integrated Sciences Complex site as ironworkers near the end of installing structural steel. Crews are pouring concrete for the floors in the new building.
Photos by: Harry Brett
This is the official project sign for the Integrated Sciences (ISC) complex on the UMass Boston campus.
This photo displays the new electrical switchgear control panels inside the recently constructted building at the UMass Boston.
The steel for the pedestrian bridge at the Integrated Sciences Complex was installed on Friday, April 20. Crews carefully set the bridge into place. The bridge will lead to the public areas of the future ISC.
Garbage shed, stairs and fence designed and built by me this summer for my daughters family the summer of 2016.
The sandpit with bench was built for my grandson in 2015.
The garbage shed was designed in Google SketchUp Make (free) and the complete model can be downloaded from the SketchUp 3D Warehouse. If you want it, search there for "Garbage shed for 2 x 140 liter + 1 x 240 liter bins"
The new electrical switchgear equipment
moves through the doorway into the new building on the UMass Boston campus.
sabin's treehouse is actually a treeshouse - since it involves five trees.
great progress was made on the deck this weekend. next up, walls and a roof. we may all have to move into it when it's finished.
The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.
The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.
The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.
Groundbreaking Ceremony for the New Silver Spring Library Building, August 30, 2010, corner of Wayne Avenue and Fenton Street.