View allAll Photos Tagged BuildingConstruction

The MIAMI REALTORS® celebrated the topping out of its new global headquarters with more than 100 Link Construction group employees on June 13, 2023.

The MIAMI REALTORS® celebrated the topping out of its new global headquarters with more than 100 Link Construction group employees on June 13, 2023.

The steel for the pedestrian bridge at the Integrated Sciences Complex was installed on Friday, April 20. Crews carefully set the bridge into place. The bridge will lead to the public areas of the future ISC.

With five floors of steel columns and beams and metal decking in place on the north wing of the Integrated Sciences Complex, structural steel and decking continues to be erected on the east wing. More steel continues to be fabricated in New Hampshire for the ISC sixth floor mechanical penthouse.

More than 2,000 yards of concrete has been place for the Integrated Sciences Complex 16-inch base slab. Utility excavation and work continue on both the east and south sides of the ISC construction site. Work continues in the service and supply tunnel.

The large crane will leave the Integrated Sciences Complex site as ironworkers near the end of installing structural steel. Crews are pouring concrete for the floors in the new building.

 

Photos by: Harry Brett

Construction marches on at UMass Boston campus – February 2013

Construction marches on at UMass Boston campus – February 2013

#69578, Checking a photovoltaic panel on the roof at the Able Skills Training Centre, Dartford, Kent.

Workers on a road construction, industry and teamwork

February 14, 2021 - "The Peninsula in Downtown Columbus. Something that started as a dream. Grew into an idea. And is soon to become Columbus, Ohio’s next great neighborhood.

 

Already on its way to becoming a lush, urban oasis, The Peninsula will have something for everyone: miles of waterfront views and pathways, acres and acres of parks and community greenspaces, conveniently connected bike trails, easy access to Scioto River canoeing and kayaking, and close proximity to Downtown’s most popular places, happenings, and events. Phase One is also bringing thoroughly modern office spaces, a premier hotel, resort-style residential living, and exceptional shopping and dining experiences.

 

The Peninsula is more than a place. It’s a walkable, bikeable community. It’s a unique live-work-play lifestyle centered around culture, rooted in common interests, and infused with creativity. It’s a neighborhood that brings together the best of all worlds – just around the bend of the Scioto River. "

 

Previous text from the following website:

www.columbusddc.com/scioto-peninsula/

The old building seems to have disappeared, and is probably being replaced by the new construction to the right. I used to love the street art sculpture located here. I hope they reinstall it after the work is done. But for now, in the "before and after", and "documenting changes" set and group.

The MIAMI REALTORS® celebrated the topping out of its new global headquarters with more than 100 Link Construction group employees on June 13, 2023.

After saying for a year that all options need to be “on the table,” House Transportation Committee Chairman Bill Shuster (R-Pa.) took higher taxes off the menu of ways to pay for transportation at an infrastructure event on Feb. 4. (David Banks/Bloomberg News)

The steel for the pedestrian bridge at the Integrated Sciences Complex was installed on Friday, April 20. Crews carefully set the bridge into place. The bridge will lead to the public areas of the future ISC.

With five floors of steel columns and beams and metal decking in place on the north wing of the Integrated Sciences Complex, structural steel and decking continues to be erected on the east wing. More steel continues to be fabricated in New Hampshire for the ISC sixth floor mechanical penthouse.

The steel for the pedestrian bridge at the Integrated Sciences Complex was installed on Friday, April 20. Crews carefully set the bridge into place. The bridge will lead to the public areas of the future ISC.

The steel for the pedestrian bridge at the Integrated Sciences Complex was installed on Friday, April 20. Crews carefully set the bridge into place. The bridge will lead to the public areas of the future ISC.

More than 2,000 yards of concrete has been place for the Integrated Sciences Complex 16-inch base slab. Utility excavation and work continue on both the east and south sides of the ISC construction site. Work continues in the service and supply tunnel.

Structural steel for the Integrated Sciences Complex arrived on Wednesday, December 21, and the steelworkers have been busy erecting two stories of columns and beams on the north wing. The university community will see the ISC take shape as steel continues to go up and metal decks, concrete slabs and fireproofing are installed through the spring.

 

Photos by Harry Brett

The MIAMI REALTORS® celebrated the topping out of its new global headquarters with more than 100 Link Construction group employees on June 13, 2023.

This bridge is actually made of by jutes ropes.

The MIAMI REALTORS® celebrated the topping out of its new global headquarters with more than 100 Link Construction group employees on June 13, 2023.

Pakenham South business estate, National Avenue, looking east near Mega Rise corner.

Pakenham South, Victoria, Australia.

With five floors of steel columns and beams and metal decking in place on the north wing of the Integrated Sciences Complex, structural steel and decking continues to be erected on the east wing. More steel continues to be fabricated in New Hampshire for the ISC sixth floor mechanical penthouse.

April 29, 2022 - Oosterdokseiland in Amsterdam. The unique and sustainable building, designed by UNStudio/Ben van Berkel, comprises a total of 72,500m2, with public facilities, 41 apartments and office space. oosterdokseiland.nl

#77284 Demonstration by Dr Kit Pedlar (medical scientist and science fiction author), Architectural Association School of Architecture, London 1975.

The MIAMI REALTORS® celebrated the topping out of its new global headquarters with more than 100 Link Construction group employees on June 13, 2023.

The steel for the pedestrian bridge at the Integrated Sciences Complex was installed on Friday, April 20. Crews carefully set the bridge into place. The bridge will lead to the public areas of the future ISC.

The steel for the pedestrian bridge at the Integrated Sciences Complex was installed on Friday, April 20. Crews carefully set the bridge into place. The bridge will lead to the public areas of the future ISC.

The MIAMI REALTORS® celebrated the topping out of its new global headquarters with more than 100 Link Construction group employees on June 13, 2023.

Construction marches on at UMass Boston campus – February 2013

More than 2,000 yards of concrete has been place for the Integrated Sciences Complex 16-inch base slab. Utility excavation and work continue on both the east and south sides of the ISC construction site. Work continues in the service and supply tunnel.

1 2 ••• 39 40 42 44 45 ••• 79 80