View allAll Photos Tagged BuildingConstruction

The MIAMI REALTORS® celebrated the topping out of its new global headquarters with more than 100 Link Construction group employees on June 13, 2023.

464-466 Collins Street, Melbourne CBD, site of the Collins House project.

Soon to be a 195-metre high tower, 12 metres wide, of more than 260 apartments over 57 (60) floors.

 

Completion date given is 2018.

 

Fun for the engineers.

 

They did well with the construction by Equiset in 2012 of the ultra-thin Phoenix building - the Blue Squiggle building (my term) - at 82 Flinders Street, just 6.7 metres wide, about 24 metres deep and 130 metres high, regarded at the time as being "on the edge of structural stability", to quote Walking Melbourne.

 

The view here is from St James Lane to the original Collins Street façade, which is to be retained, and enhanced.

 

www.hickory.com.au/projects/collins-house/

Park at Twilight, and Night in the Middle of Business Area Landscape for Business Backgrounds at Night, Cityscape at Night with Lake and Water Reflection.

The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.

The MIAMI REALTORS® celebrated the topping out of its new global headquarters with more than 100 Link Construction group employees on June 13, 2023.

Utility and tunnel work are underway at the Integrated Sciences Complex. Storm, sewer and drainage piping as well as electrical and IT conduit are being installed. Concrete continues to be poured for the elevator shafts and tunnel leading to the Service and Supply Building. A total of 8,500 cy of concrete will be placed during the construction of the Integrated Sciences Complex.

#69248, Female Plumbing student taking a break, Able Skills, Dartford, Kent.

#69340, Plastering student working on a plasterboard wall, Able Skills, Dartford, Kent.

June 20, 2021 - The construction cranes are for The Peninsula which is being developed by the Columbus Downtown Development Corporation. For more information on the project: ttps://www.columbusddc.com/scioto-peninsula/

The MIAMI REALTORS® celebrated the topping out of its new global headquarters with more than 100 Link Construction group employees on June 13, 2023.

The MIAMI REALTORS® celebrated the topping out of its new global headquarters with more than 100 Link Construction group employees on June 13, 2023.

The steel for the pedestrian bridge at the Integrated Sciences Complex was installed on Friday, April 20. Crews carefully set the bridge into place. The bridge will lead to the public areas of the future ISC.

More than 2,000 yards of concrete has been place for the Integrated Sciences Complex 16-inch base slab. Utility excavation and work continue on both the east and south sides of the ISC construction site. Work continues in the service and supply tunnel.

The MIAMI REALTORS® celebrated the topping out of its new global headquarters with more than 100 Link Construction group employees on June 13, 2023.

This is the street art I found in Downtown Toronto. During my last trip in Sept 2005.

  

All images are available for prints and stock licensing. To learn more, visit my web site jamescolecreative.com

#69348, Plastering student mixes some plaster, Able Skills, Dartford, Kent.

Construction marches on at UMass Boston campus – February 2013

The steel for the pedestrian bridge at the Integrated Sciences Complex was installed on Friday, April 20. Crews carefully set the bridge into place. The bridge will lead to the public areas of the future ISC.

More than 2,000 yards of concrete has been place for the Integrated Sciences Complex 16-inch base slab. Utility excavation and work continue on both the east and south sides of the ISC construction site. Work continues in the service and supply tunnel.

#69466, Electricians updating their skills in modern renewable technologies at the Able Skills Training Centre, Dartford, Kent.

#69454, Plumbing students in the workshop, Able Skills, Dartford, Kent.

Construction on the new BSS Building on the east side of campus is just about finished and the building is expected to open later this semester as students return in person to campus for the first day of the fall semester on Monday, August 26, 2024 in Chico, Calif.

(Jason Halley/University Photographer/Chico State)

Model By: Late Loomis - Giulietti Schouten AIA - gsarchitects.net/

1 2 ••• 42 43 45 47 48 ••• 79 80