View allAll Photos Tagged BuildingConstruction

The MIAMI REALTORS® celebrated the topping out of its new global headquarters with more than 100 Link Construction group employees on June 13, 2023.

Still life of carpentry tools --- Image by © Tetra Images/Corbis

The MIAMI REALTORS® celebrated the topping out of its new global headquarters with more than 100 Link Construction group employees on June 13, 2023.

Virginia Tech, Blacksburg, Virginia

More than 2,000 yards of concrete has been place for the Integrated Sciences Complex 16-inch base slab. Utility excavation and work continue on both the east and south sides of the ISC construction site. Work continues in the service and supply tunnel.

More than 2,000 yards of concrete has been place for the Integrated Sciences Complex 16-inch base slab. Utility excavation and work continue on both the east and south sides of the ISC construction site. Work continues in the service and supply tunnel.

The MIAMI REALTORS® celebrated the topping out of its new global headquarters with more than 100 Link Construction group employees on June 13, 2023.

This is trying out the new Tamron Tele-Wide Angle.

 

There is a problem on flickr uploading system. I am un able to upload. Uploading this took me over an hour.

The MIAMI REALTORS® celebrated the topping out of its new global headquarters with more than 100 Link Construction group employees on June 13, 2023.

More than 2,000 yards of concrete has been place for the Integrated Sciences Complex 16-inch base slab. Utility excavation and work continue on both the east and south sides of the ISC construction site. Work continues in the service and supply tunnel.

Construction marches on at UMass Boston campus – February 2013

The MIAMI REALTORS® celebrated the topping out of its new global headquarters with more than 100 Link Construction group employees on June 13, 2023.

The construction process of the new BSS building continues on Wednesday, May 3, 2023 in Chico, Calif.

(Jason Halley/University Photographer/Chico State)

More than 2,000 yards of concrete has been place for the Integrated Sciences Complex 16-inch base slab. Utility excavation and work continue on both the east and south sides of the ISC construction site. Work continues in the service and supply tunnel.

I can only see images scrolling and scrolling and scrolling in New Flickr, so am comparing images with two different sizes, if the smaller one's visiblity is better than the large image. This is the small image, if I recollect correctly. In old Flickr I can see this image without scrolling on the comments page. Somebody suggested zooming the page, then I do not need to scroll, but the text is barely legible. / and I am sure we TAG LINE fans will find a work around with symbols. The line is possible with dots, you have to know the number of spaces per line. The solution is still not ideal. But must I change all my tags for thousands of images like this! Oh, no... It would be better if Flickr kept Old flickr Tag lines, don't you agree. / To get to Edit tags, I have to click Actions, go to the scroll bar (the arrow does confusing things), and then click Edit tags, then I have to change the tag, save, look at the results, which are possibly not ideal and repeat actions, scroll bar, edit tags, over and over again. But it was worth getting the Tags List again. I guess it would be better to just count the number of symbols per tag line, that would do the trick and store the tag format somewhere to just change and paste. Probably better....

The steel for the pedestrian bridge at the Integrated Sciences Complex was installed on Friday, April 20. Crews carefully set the bridge into place. The bridge will lead to the public areas of the future ISC.

Construction marches on at UMass Boston campus – February 2013

ca. 2001 --- Workers Placing Shingles on Conveyor Belt --- Image by © Royalty-Free/Corbis

With five floors of steel columns and beams and metal decking in place on the north wing of the Integrated Sciences Complex, structural steel and decking continues to be erected on the east wing. More steel continues to be fabricated in New Hampshire for the ISC sixth floor mechanical penthouse.

The campus community write their name/signature or inspirational quote/doodle that will be forever memorialized into the new construction of the BSS Building on Friday, May 19, 2023 in Chico, Calif. The signing is done in preparation for a Topping Out Ceremony, which is a traditional event put on by construction crews to place the last beam on top of our new structure.It signifies all the hours and work construction and metal workers put into the framework of the building.

(Jason Halley/University Photographer/Chico State)

With five floors of steel columns and beams and metal decking in place on the north wing of the Integrated Sciences Complex, structural steel and decking continues to be erected on the east wing. More steel continues to be fabricated in New Hampshire for the ISC sixth floor mechanical penthouse.

I am experimenting the perspective corrections on these building.

 

The picture quality is enhanced.

More than 2,000 yards of concrete has been place for the Integrated Sciences Complex 16-inch base slab. Utility excavation and work continue on both the east and south sides of the ISC construction site. Work continues in the service and supply tunnel.

Latest image of the Children's Hospital of Philadelphia building construction

The steel for the pedestrian bridge at the Integrated Sciences Complex was installed on Friday, April 20. Crews carefully set the bridge into place. The bridge will lead to the public areas of the future ISC.

The steel for the pedestrian bridge at the Integrated Sciences Complex was installed on Friday, April 20. Crews carefully set the bridge into place. The bridge will lead to the public areas of the future ISC.

With five floors of steel columns and beams and metal decking in place on the north wing of the Integrated Sciences Complex, structural steel and decking continues to be erected on the east wing. More steel continues to be fabricated in New Hampshire for the ISC sixth floor mechanical penthouse.

Construction marches on at UMass Boston campus – February 2013

The MIAMI REALTORS® celebrated the topping out of its new global headquarters with more than 100 Link Construction group employees on June 13, 2023.

The steel for the pedestrian bridge at the Integrated Sciences Complex was installed on Friday, April 20. Crews carefully set the bridge into place. The bridge will lead to the public areas of the future ISC.

1 2 ••• 36 37 39 41 42 ••• 79 80