View allAll Photos Tagged Bridges_and_Tunnel

The Layton Bridge spans the Youghiogheny between Perryopolis and Layton. The bridge and tunnel to the west were initially built for the Washington Run Railroad and remain in use as a road crossing.

An old bridge and tunnel on Ruta 7 alongside the new highway. Watch carefully for the opportunity to turn off the highway onto this little segment of the old road -- it's a lovely place to take a roadside breather and check out this lovely little waterfall in a tiny side canyon.

 

Interactive panorama at:

fieldofview.com/flickr/?page=photos/mantisofdestiny/33632...

 

See on black:

B l a c k M a g i c

 

New York Army National Guard Soldiers assigned to Task Force Wingfoot, a team built around the 1st Battalion, 101st Cavalry, screen vehicles at points leading to New York City's bridges and tunnels as part of a security augmentation mission which lasted from November 2001 to January 2002 after the initial response to the 9/11 attacks wrapped up.

On 14th Oct 2018, 10000 Hong Kong protesters hold a rally from Causeway Bay to the Central Office, to protest the government 's plan to spend probably 1 trillion Hong Kong dollars to build artificial islands and accompanying bridges and tunnels in the East of Lantau Island.

The former "East Lantau Metropolis project" proposed to reclaim 1000 hectares , has been replaced this week by an even more ambitious project of "Lantau Tomorrow Vision " of reclaiming 1700 hectares to house 1.1million people by the Chief Executive Carrie Lam, preempting the awaited public consultation report by the Task Force on Land Supply.

The protestors worried the project has not considered the risks under extreme weather, will irreversibly damage the environment, burn up the whole fiscal reserve, and deprive the public of the funding for other more important fields like medical , education, and retirement scheme.

Moreover the project , requiring 2 to 3 decades to complete , cannot cater for the immediate housing needs of the general public, as compared to other source of land supply such as the Fanling Golf Course , brownfield sites and buy back farmland from private estate developers for public housing.

  

大约一萬名市民於十月十四日參與由銅鑼灣至政總的遊行 ,抗議政府計劃用一萬億元填海及興建東大嶼人工島方案。

示威者認為政府的明日大嶼計劃填海1700公頃及其他的橋樑或隧道, 將會對環境造成不可挽回的影響, 亦未有考慮到人工島能否應付極端的天氣, 財政上會用盡香港的儲備, 亦令到沒有足夠財政資源用於醫療、教育及全民退休保障等。

示威者亦不滿政府亦未有等待土地供應小組的咨詢結果便公佈填海作為主要選項。但填海需時20至30年才提供到1.1百萬人的住宅, 相反其他土地供應選項如收回粉嶺哥爾夫球場、粽地、及用官地收回條例收回地產發展商的農地作公營房屋卻能夠比較快提供到房屋。

Recent progress has seen the addition of moulded rock faces and boulders along the river along with a layer of coloured plaster over much of the scenery.. Also the track has been ballasted, now awaiting weathering. Scratchbuilding of the bridges and tunnel portals is also ongoing. Next job is painting the rocks, installing the retaining walls.

On 14th Oct 2018, 10000 Hong Kong protesters hold a rally from Causeway Bay to the Central Office, to protest the government 's plan to spend probably 1 trillion Hong Kong dollars to build artificial islands and accompanying bridges and tunnels in the East of Lantau Island.

The former "East Lantau Metropolis project" proposed to reclaim 1000 hectares , has been replaced this week by an even more ambitious project of "Lantau Tomorrow Vision " of reclaiming 1700 hectares to house 1.1million people by the Chief Executive Carrie Lam, preempting the awaited public consultation report by the Task Force on Land Supply.

The protestors worried the project has not considered the risks under extreme weather, will irreversibly damage the environment, burn up the whole fiscal reserve, and deprive the public of the funding for other more important fields like medical , education, and retirement scheme.

Moreover the project , requiring 2 to 3 decades to complete , cannot cater for the immediate housing needs of the general public, as compared to other source of land supply such as the Fanling Golf Course , brownfield sites and buy back farmland from private estate developers for public housing.

  

大约一萬名市民於十月十四日參與由銅鑼灣至政總的遊行 ,抗議政府計劃用一萬億元填海及興建東大嶼人工島方案。

示威者認為政府的明日大嶼計劃填海1700公頃及其他的橋樑或隧道, 將會對環境造成不可挽回的影響, 亦未有考慮到人工島能否應付極端的天氣, 財政上會用盡香港的儲備, 亦令到沒有足夠財政資源用於醫療、教育及全民退休保障等。

示威者亦不滿政府亦未有等待土地供應小組的咨詢結果便公佈填海作為主要選項。但填海需時20至30年才提供到1.1百萬人的住宅, 相反其他土地供應選項如收回粉嶺哥爾夫球場、粽地、及用官地收回條例收回地產發展商的農地作公營房屋卻能夠比較快提供到房屋。

On 14th Oct 2018, 10000 Hong Kong protesters hold a rally from Causeway Bay to the Central Office, to protest the government 's plan to spend probably 1 trillion Hong Kong dollars to build artificial islands and accompanying bridges and tunnels in the East of Lantau Island.

The former "East Lantau Metropolis project" proposed to reclaim 1000 hectares , has been replaced this week by an even more ambitious project of "Lantau Tomorrow Vision " of reclaiming 1700 hectares to house 1.1million people by the Chief Executive Carrie Lam, preempting the awaited public consultation report by the Task Force on Land Supply.

The protestors worried the project has not considered the risks under extreme weather, will irreversibly damage the environment, burn up the whole fiscal reserve, and deprive the public of the funding for other more important fields like medical , education, and retirement scheme.

Moreover the project , requiring 2 to 3 decades to complete , cannot cater for the immediate housing needs of the general public, as compared to other source of land supply such as the Fanling Golf Course , brownfield sites and buy back farmland from private estate developers for public housing.

  

大约一萬名市民於十月十四日參與由銅鑼灣至政總的遊行 ,抗議政府計劃用一萬億元填海及興建東大嶼人工島方案。

示威者認為政府的明日大嶼計劃填海1700公頃及其他的橋樑或隧道, 將會對環境造成不可挽回的影響, 亦未有考慮到人工島能否應付極端的天氣, 財政上會用盡香港的儲備, 亦令到沒有足夠財政資源用於醫療、教育及全民退休保障等。

示威者亦不滿政府亦未有等待土地供應小組的咨詢結果便公佈填海作為主要選項。但填海需時20至30年才提供到1.1百萬人的住宅, 相反其他土地供應選項如收回粉嶺哥爾夫球場、粽地、及用官地收回條例收回地產發展商的農地作公營房屋卻能夠比較快提供到房屋。

On 14th Oct 2018, 10000 Hong Kong protesters hold a rally from Causeway Bay to the Central Office, to protest the government 's plan to spend probably 1 trillion Hong Kong dollars to build artificial islands and accompanying bridges and tunnels in the East of Lantau Island.

The former "East Lantau Metropolis project" proposed to reclaim 1000 hectares , has been replaced this week by an even more ambitious project of "Lantau Tomorrow Vision " of reclaiming 1700 hectares to house 1.1million people by the Chief Executive Carrie Lam, preempting the awaited public consultation report by the Task Force on Land Supply.

The protestors worried the project has not considered the risks under extreme weather, will irreversibly damage the environment, burn up the whole fiscal reserve, and deprive the public of the funding for other more important fields like medical , education, and retirement scheme.

Moreover the project , requiring 2 to 3 decades to complete , cannot cater for the immediate housing needs of the general public, as compared to other source of land supply such as the Fanling Golf Course , brownfield sites and buy back farmland from private estate developers for public housing.

  

大约一萬名市民於十月十四日參與由銅鑼灣至政總的遊行 ,抗議政府計劃用一萬億元填海及興建東大嶼人工島方案。

示威者認為政府的明日大嶼計劃填海1700公頃及其他的橋樑或隧道, 將會對環境造成不可挽回的影響, 亦未有考慮到人工島能否應付極端的天氣, 財政上會用盡香港的儲備, 亦令到沒有足夠財政資源用於醫療、教育及全民退休保障等。

示威者亦不滿政府亦未有等待土地供應小組的咨詢結果便公佈填海作為主要選項。但填海需時20至30年才提供到1.1百萬人的住宅, 相反其他土地供應選項如收回粉嶺哥爾夫球場、粽地、及用官地收回條例收回地產發展商的農地作公營房屋卻能夠比較快提供到房屋。

The Fort Duquesne (Du-Kane) approach to the outbound Fort Pitt Bridge and tunnel.

Horton-in-Ribblesdale station on the Leeds to Settle to Carlisle railway line. I'm a huge fan of this railway line as most of the stations drop you in the heart of remote and beautiful countryside of the Yorkshire Dales, with Horton-in-Ribblesdale in particular being the normal start and end of the Yorkshire Three Peaks Walk linking the three mountains of Whernside, Ingleborough and Pen Y Ghent.

 

This line makes it easily possible to visit the Yorkshire Dales in a weekend from "down south" (a journey I'd not consider doing for a weekend by car due to the distance) and it can be very good value too (I paid less than £32 return from London with tickets booked in advance).

 

This railway line was built by the Midland Railway, a company which did not do things by half (as you'll know if you've ever seen St Pancras station). Built to mainline standards to provide a route for the company to Scotland the line was pushed right through the Yorkshire Dales, with numerous bridges and tunnels to ensure high speeds could be achieved. The building of the line claimed many lives.

 

The line is also a great survivor. The Beeching report recommened the withdrawl of all passenger services from the line and to that end all but two of the stations (Settle and Appleby) were closed with the service reduced to just two passenger trains a day. The line struggled on until 1984 when British Rail posted closure notices on the remaining stations citing the small amount of traffic on the line and the high cost of maintenance. A huge campaign by locals convinced the Government to save the line. Horton in Ribblesdale station re-opened to the public in 1986 and has been beautifully restored.

 

Increasing demand and congestion on the West Coast mainline means the route is now well used by Freight trains whilst passenger services now run once every two hours in each direction.

Norway is currently working on a mega project to replace all ferries along the E39 with bridges and tunnels. This also includes the Halhjem to Sandvikvåg ferry south of Bergen.

New York Army National Guard Soldiers assigned to Task Force Wingfoot, a team built around the 1st Battalion, 101st Cavalry, screen vehicles at points leading to New York City's bridges and tunnels as part of a security augmentation mission which lasted from November 2001 to January 2002 after the initial response to the 9/11 attacks wrapped up.

On 14th Oct 2018, 10000 Hong Kong protesters hold a rally from Causeway Bay to the Central Office, to protest the government 's plan to spend probably 1 trillion Hong Kong dollars to build artificial islands and accompanying bridges and tunnels in the East of Lantau Island.

The former "East Lantau Metropolis project" proposed to reclaim 1000 hectares , has been replaced this week by an even more ambitious project of "Lantau Tomorrow Vision " of reclaiming 1700 hectares to house 1.1million people by the Chief Executive Carrie Lam, preempting the awaited public consultation report by the Task Force on Land Supply.

The protestors worried the project has not considered the risks under extreme weather, will irreversibly damage the environment, burn up the whole fiscal reserve, and deprive the public of the funding for other more important fields like medical , education, and retirement scheme.

Moreover the project , requiring 2 to 3 decades to complete , cannot cater for the immediate housing needs of the general public, as compared to other source of land supply such as the Fanling Golf Course , brownfield sites and buy back farmland from private estate developers for public housing.

  

大约一萬名市民於十月十四日參與由銅鑼灣至政總的遊行 ,抗議政府計劃用一萬億元填海及興建東大嶼人工島方案。

示威者認為政府的明日大嶼計劃填海1700公頃及其他的橋樑或隧道, 將會對環境造成不可挽回的影響, 亦未有考慮到人工島能否應付極端的天氣, 財政上會用盡香港的儲備, 亦令到沒有足夠財政資源用於醫療、教育及全民退休保障等。

示威者亦不滿政府亦未有等待土地供應小組的咨詢結果便公佈填海作為主要選項。但填海需時20至30年才提供到1.1百萬人的住宅, 相反其他土地供應選項如收回粉嶺哥爾夫球場、粽地、及用官地收回條例收回地產發展商的農地作公營房屋卻能夠比較快提供到房屋。

On 14th Oct 2018, 10000 Hong Kong protesters hold a rally from Causeway Bay to the Central Office, to protest the government 's plan to spend probably 1 trillion Hong Kong dollars to build artificial islands and accompanying bridges and tunnels in the East of Lantau Island.

The former "East Lantau Metropolis project" proposed to reclaim 1000 hectares , has been replaced this week by an even more ambitious project of "Lantau Tomorrow Vision " of reclaiming 1700 hectares to house 1.1million people by the Chief Executive Carrie Lam, preempting the awaited public consultation report by the Task Force on Land Supply.

The protestors worried the project has not considered the risks under extreme weather, will irreversibly damage the environment, burn up the whole fiscal reserve, and deprive the public of the funding for other more important fields like medical , education, and retirement scheme.

Moreover the project , requiring 2 to 3 decades to complete , cannot cater for the immediate housing needs of the general public, as compared to other source of land supply such as the Fanling Golf Course , brownfield sites and buy back farmland from private estate developers for public housing.

  

大约一萬名市民於十月十四日參與由銅鑼灣至政總的遊行 ,抗議政府計劃用一萬億元填海及興建東大嶼人工島方案。

示威者認為政府的明日大嶼計劃填海1700公頃及其他的橋樑或隧道, 將會對環境造成不可挽回的影響, 亦未有考慮到人工島能否應付極端的天氣, 財政上會用盡香港的儲備, 亦令到沒有足夠財政資源用於醫療、教育及全民退休保障等。

示威者亦不滿政府亦未有等待土地供應小組的咨詢結果便公佈填海作為主要選項。但填海需時20至30年才提供到1.1百萬人的住宅, 相反其他土地供應選項如收回粉嶺哥爾夫球場、粽地、及用官地收回條例收回地產發展商的農地作公營房屋卻能夠比較快提供到房屋。

Wrinkley kindly sent this photograph for publication.

 

Contact and catenary wires have been installed through the bridges and tunnel west of Bolton station and out into the countryside beyond.

 

Copyright Wrinkley 2018.

Date: 22.03.2011

Location: Amsterdam Noord, Mosveld

Wall: 650 m2 of the complete bridge and tunnel walls

 

All artists of the Urban Art Exchange SH(OUT)!!! painted together the complete bridge and tunnel walls at the Mosplein in Amsterdam Noord. A common color scheme for the styels and the background was chosen by the organisation crew. During a preparation meeting the wall space was divided amon the artists in order to get a good composition of stylewriters and characters.

 

URBAN ART MURALISM - ARTIST EXCHANGE in AMSTERDAM

 

A group of 36 Urban Artists coming from six European countries – Netherlands, Denmark, Germany, Italy, France and Austria – took part in the European Art Exchange Project “SH(OUT)!!!” from 18.03.11 to 27.03.11 in Amsterdam.

 

The main activities included several mural paintings in the city of Amsterdam, an exhibition in the Dokhuis Gallery as well as a common art workshop with local young people.

 

Nowadays Urban Art has worldwide acceptance as a young art form. Urban Artists form and transform public spaces and present their work, free of charge, throughout the cities. The event gives respect and pays tribute to art from the streets and makes this art form more accessible to a broader audience through various live painting activities in the city, two innovative group exhibitions and workshops.

 

Visit our website: www.urban-art-muralism.com/

Check our Facebook Page: www.facebook.com/urbanartattack

The line was built in 1867 by local mill owners[citation needed], but operated by the Midland Railway, which owned most of the rail network in the area, and was eventually bought by the Midland in part due to interest from the rival railway company at Keighley, the Great Northern. The Mill owners made a profit, which was abnormal for most lines of that type, as (for strategic reasons) the Midland wanted to prevent the GN from taking over its territory. After falling to the London, Midland and Scottish Railway in 1923 during the Grouping Act, ownership passed to British Railways following nationalisation in 1948. As a part of the rail cutbacks in the 1960s, British Railways closed the line at the end of 1962.

 

However a preservation society was formed which bought the line from BR and reopened it in 1968 as a heritage railway. The line is now a major tourist attraction operated entirely by volunteers and carries more than 110,000 passengers every year[citation needed]. The KWVR is currently the only preserved railway that operates a complete branch line in its original form. It is celebrated among beer lovers for operating the only buffet car serving real ale.

 

The line and its bridges and tunnels including a deviation were built as single track but with provision for duplication, should the need arise. The deviation was built as a condition of the buy out of the Keighley and Worth Valley Railway by the Midland Railway. The need for the deviation was to avoid a large wooden trestle viaduct that crossed a mill pond, as the locals believed the viaduct was unsafe, and supposedly many alighted at Oakworth and continued on foot to Haworth to avoid crossing the viaduct. The original design for the deviation was to skirt the mill pond then through a cutting to rejoin the original formation. However during construction the material in the cutting proved to be unstable, resulting in the construction of the short Mytholmes Tunnel. The original trestle viaduct can be seen in a picture hanging above the fire in the booking hall of Oakworth station.

 

On 10 July 2008, the Duke of Kent visited the railway following the 40th anniversary of its reopening.[3][4][5] While at the railway, the Duke travelled on a specially prepared "Royal Train", consisting of tank locomotive 41241, an LMS Class 2MT, pulling a single carriage, The Old Gentleman's Saloon, as featured in The Railway Children, which is a former North Eastern Railway directors Saloon. While visiting, the Duke travelled in the carriage and on the locomotive footplate.

On 14th Oct 2018, 10000 Hong Kong protesters hold a rally from Causeway Bay to the Central Office, to protest the government 's plan to spend probably 1 trillion Hong Kong dollars to build artificial islands and accompanying bridges and tunnels in the East of Lantau Island.

The former "East Lantau Metropolis project" proposed to reclaim 1000 hectares , has been replaced this week by an even more ambitious project of "Lantau Tomorrow Vision " of reclaiming 1700 hectares to house 1.1million people by the Chief Executive Carrie Lam, preempting the awaited public consultation report by the Task Force on Land Supply.

The protestors worried the project has not considered the risks under extreme weather, will irreversibly damage the environment, burn up the whole fiscal reserve, and deprive the public of the funding for other more important fields like medical , education, and retirement scheme.

Moreover the project , requiring 2 to 3 decades to complete , cannot cater for the immediate housing needs of the general public, as compared to other source of land supply such as the Fanling Golf Course , brownfield sites and buy back farmland from private estate developers for public housing.

  

大约一萬名市民於十月十四日參與由銅鑼灣至政總的遊行 ,抗議政府計劃用一萬億元填海及興建東大嶼人工島方案。

示威者認為政府的明日大嶼計劃填海1700公頃及其他的橋樑或隧道, 將會對環境造成不可挽回的影響, 亦未有考慮到人工島能否應付極端的天氣, 財政上會用盡香港的儲備, 亦令到沒有足夠財政資源用於醫療、教育及全民退休保障等。

示威者亦不滿政府亦未有等待土地供應小組的咨詢結果便公佈填海作為主要選項。但填海需時20至30年才提供到1.1百萬人的住宅, 相反其他土地供應選項如收回粉嶺哥爾夫球場、粽地、及用官地收回條例收回地產發展商的農地作公營房屋卻能夠比較快提供到房屋。

"Great white elephant rushes to the Treasury, "patriotic" thief moves the money hard"

 

"大白象 闖庫房 愛國賊 努力搬"

 

On 14th Oct 2018, 10000 Hong Kong protesters hold a rally from Causeway Bay to the Central Office, to protest the government 's plan to spend probably 1 trillion Hong Kong dollars to build artificial islands and accompanying bridges and tunnels in the East of Lantau Island.

The former "East Lantau Metropolis project" proposed to reclaim 1000 hectares , has been replaced this week by an even more ambitious project of "Lantau Tomorrow Vision " of reclaiming 1700 hectares to house 1.1million people by the Chief Executive Carrie Lam, preempting the awaited public consultation report by the Task Force on Land Supply.

The protestors worried the project has not considered the risks under extreme weather, will irreversibly damage the environment, burn up the whole fiscal reserve, and deprive the public of the funding for other more important fields like medical , education, and retirement scheme.

Moreover the project , requiring 2 to 3 decades to complete , cannot cater for the immediate housing needs of the general public, as compared to other source of land supply such as the Fanling Golf Course , brownfield sites and buy back farmland from private estate developers for public housing.

  

大约一萬名市民於十月十四日參與由銅鑼灣至政總的遊行 ,抗議政府計劃用一萬億元填海及興建東大嶼人工島方案。

示威者認為政府的明日大嶼計劃填海1700公頃及其他的橋樑或隧道, 將會對環境造成不可挽回的影響, 亦未有考慮到人工島能否應付極端的天氣, 財政上會用盡香港的儲備, 亦令到沒有足夠財政資源用於醫療、教育及全民退休保障等。

示威者亦不滿政府亦未有等待土地供應小組的咨詢結果便公佈填海作為主要選項。但填海需時20至30年才提供到1.1百萬人的住宅, 相反其他土地供應選項如收回粉嶺哥爾夫球場、粽地、及用官地收回條例收回地產發展商的農地作公營房屋卻能夠比較快提供到房屋。

The line was built in 1867 by local mill owners[citation needed], but operated by the Midland Railway, which owned most of the rail network in the area, and was eventually bought by the Midland in part due to interest from the rival railway company at Keighley, the Great Northern. The Mill owners made a profit, which was abnormal for most lines of that type, as (for strategic reasons) the Midland wanted to prevent the GN from taking over its territory. After falling to the London, Midland and Scottish Railway in 1923 during the Grouping Act, ownership passed to British Railways following nationalisation in 1948. As a part of the rail cutbacks in the 1960s, British Railways closed the line at the end of 1962.

 

However a preservation society was formed which bought the line from BR and reopened it in 1968 as a heritage railway. The line is now a major tourist attraction operated entirely by volunteers and carries more than 110,000 passengers every year[citation needed]. The KWVR is currently the only preserved railway that operates a complete branch line in its original form. It is celebrated among beer lovers for operating the only buffet car serving real ale.

 

The line and its bridges and tunnels including a deviation were built as single track but with provision for duplication, should the need arise. The deviation was built as a condition of the buy out of the Keighley and Worth Valley Railway by the Midland Railway. The need for the deviation was to avoid a large wooden trestle viaduct that crossed a mill pond, as the locals believed the viaduct was unsafe, and supposedly many alighted at Oakworth and continued on foot to Haworth to avoid crossing the viaduct. The original design for the deviation was to skirt the mill pond then through a cutting to rejoin the original formation. However during construction the material in the cutting proved to be unstable, resulting in the construction of the short Mytholmes Tunnel. The original trestle viaduct can be seen in a picture hanging above the fire in the booking hall of Oakworth station.

 

On 10 July 2008, the Duke of Kent visited the railway following the 40th anniversary of its reopening.[3][4][5] While at the railway, the Duke travelled on a specially prepared "Royal Train", consisting of tank locomotive 41241, an LMS Class 2MT, pulling a single carriage, The Old Gentleman's Saloon, as featured in The Railway Children, which is a former North Eastern Railway directors Saloon. While visiting, the Duke travelled in the carriage and on the locomotive footplate.

The line was built in 1867 by local mill owners[citation needed], but operated by the Midland Railway, which owned most of the rail network in the area, and was eventually bought by the Midland in part due to interest from the rival railway company at Keighley, the Great Northern. The Mill owners made a profit, which was abnormal for most lines of that type, as (for strategic reasons) the Midland wanted to prevent the GN from taking over its territory. After falling to the London, Midland and Scottish Railway in 1923 during the Grouping Act, ownership passed to British Railways following nationalisation in 1948. As a part of the rail cutbacks in the 1960s, British Railways closed the line at the end of 1962.

 

However a preservation society was formed which bought the line from BR and reopened it in 1968 as a heritage railway. The line is now a major tourist attraction operated entirely by volunteers and carries more than 110,000 passengers every year[citation needed]. The KWVR is currently the only preserved railway that operates a complete branch line in its original form. It is celebrated among beer lovers for operating the only buffet car serving real ale.

 

The line and its bridges and tunnels including a deviation were built as single track but with provision for duplication, should the need arise. The deviation was built as a condition of the buy out of the Keighley and Worth Valley Railway by the Midland Railway. The need for the deviation was to avoid a large wooden trestle viaduct that crossed a mill pond, as the locals believed the viaduct was unsafe, and supposedly many alighted at Oakworth and continued on foot to Haworth to avoid crossing the viaduct. The original design for the deviation was to skirt the mill pond then through a cutting to rejoin the original formation. However during construction the material in the cutting proved to be unstable, resulting in the construction of the short Mytholmes Tunnel. The original trestle viaduct can be seen in a picture hanging above the fire in the booking hall of Oakworth station.

 

On 10 July 2008, the Duke of Kent visited the railway following the 40th anniversary of its reopening.[3][4][5] While at the railway, the Duke travelled on a specially prepared "Royal Train", consisting of tank locomotive 41241, an LMS Class 2MT, pulling a single carriage, The Old Gentleman's Saloon, as featured in The Railway Children, which is a former North Eastern Railway directors Saloon. While visiting, the Duke travelled in the carriage and on the locomotive footplate.

On 14th Oct 2018, 10000 Hong Kong protesters hold a rally from Causeway Bay to the Central Office, to protest the government 's plan to spend probably 1 trillion Hong Kong dollars to build artificial islands and accompanying bridges and tunnels in the East of Lantau Island.

The former "East Lantau Metropolis project" proposed to reclaim 1000 hectares , has been replaced this week by an even more ambitious project of "Lantau Tomorrow Vision " of reclaiming 1700 hectares to house 1.1million people by the Chief Executive Carrie Lam, preempting the awaited public consultation report by the Task Force on Land Supply.

The protestors worried the project has not considered the risks under extreme weather, will irreversibly damage the environment, burn up the whole fiscal reserve, and deprive the public of the funding for other more important fields like medical , education, and retirement scheme.

Moreover the project , requiring 2 to 3 decades to complete , cannot cater for the immediate housing needs of the general public, as compared to other source of land supply such as the Fanling Golf Course , brownfield sites and buy back farmland from private estate developers for public housing.

  

大约一萬名市民於十月十四日參與由銅鑼灣至政總的遊行 ,抗議政府計劃用一萬億元填海及興建東大嶼人工島方案。

示威者認為政府的明日大嶼計劃填海1700公頃及其他的橋樑或隧道, 將會對環境造成不可挽回的影響, 亦未有考慮到人工島能否應付極端的天氣, 財政上會用盡香港的儲備, 亦令到沒有足夠財政資源用於醫療、教育及全民退休保障等。

示威者亦不滿政府亦未有等待土地供應小組的咨詢結果便公佈填海作為主要選項。但填海需時20至30年才提供到1.1百萬人的住宅, 相反其他土地供應選項如收回粉嶺哥爾夫球場、粽地、及用官地收回條例收回地產發展商的農地作公營房屋卻能夠比較快提供到房屋。

On 14th Oct 2018, 10000 Hong Kong protesters hold a rally from Causeway Bay to the Central Office, to protest the government 's plan to spend probably 1 trillion Hong Kong dollars to build artificial islands and accompanying bridges and tunnels in the East of Lantau Island.

The former "East Lantau Metropolis project" proposed to reclaim 1000 hectares , has been replaced this week by an even more ambitious project of "Lantau Tomorrow Vision " of reclaiming 1700 hectares to house 1.1million people by the Chief Executive Carrie Lam, preempting the awaited public consultation report by the Task Force on Land Supply.

The protestors worried the project has not considered the risks under extreme weather, will irreversibly damage the environment, burn up the whole fiscal reserve, and deprive the public of the funding for other more important fields like medical , education, and retirement scheme.

Moreover the project , requiring 2 to 3 decades to complete , cannot cater for the immediate housing needs of the general public, as compared to other source of land supply such as the Fanling Golf Course , brownfield sites and buy back farmland from private estate developers for public housing.

  

大约一萬名市民於十月十四日參與由銅鑼灣至政總的遊行 ,抗議政府計劃用一萬億元填海及興建東大嶼人工島方案。

示威者認為政府的明日大嶼計劃填海1700公頃及其他的橋樑或隧道, 將會對環境造成不可挽回的影響, 亦未有考慮到人工島能否應付極端的天氣, 財政上會用盡香港的儲備, 亦令到沒有足夠財政資源用於醫療、教育及全民退休保障等。

示威者亦不滿政府亦未有等待土地供應小組的咨詢結果便公佈填海作為主要選項。但填海需時20至30年才提供到1.1百萬人的住宅, 相反其他土地供應選項如收回粉嶺哥爾夫球場、粽地、及用官地收回條例收回地產發展商的農地作公營房屋卻能夠比較快提供到房屋。

VWS6929 Copyright © VW Selburn 2016: There are an abundance of road bridges and tunnels between Diano Marina and Monaco. The tunnels all have names on a sign to the right of the entry point. I can't tell which this is because of that darned lorry in the way! The people who live over the tunnel are very brave. I don't think I would like to.

Cahill Expressway is the freeway from Sydney Airport and the eastern suburbs to Sydney Harbour Bridge and Tunnel

On 14th Oct 2018, 10000 Hong Kong protesters hold a rally from Causeway Bay to the Central Office, to protest the government 's plan to spend probably 1 trillion Hong Kong dollars to build artificial islands and accompanying bridges and tunnels in the East of Lantau Island.

The former "East Lantau Metropolis project" proposed to reclaim 1000 hectares , has been replaced this week by an even more ambitious project of "Lantau Tomorrow Vision " of reclaiming 1700 hectares to house 1.1million people by the Chief Executive Carrie Lam, preempting the awaited public consultation report by the Task Force on Land Supply.

The protestors worried the project has not considered the risks under extreme weather, will irreversibly damage the environment, burn up the whole fiscal reserve, and deprive the public of the funding for other more important fields like medical , education, and retirement scheme.

Moreover the project , requiring 2 to 3 decades to complete , cannot cater for the immediate housing needs of the general public, as compared to other source of land supply such as the Fanling Golf Course , brownfield sites and buy back farmland from private estate developers for public housing.

  

大约一萬名市民於十月十四日參與由銅鑼灣至政總的遊行 ,抗議政府計劃用一萬億元填海及興建東大嶼人工島方案。

示威者認為政府的明日大嶼計劃填海1700公頃及其他的橋樑或隧道, 將會對環境造成不可挽回的影響, 亦未有考慮到人工島能否應付極端的天氣, 財政上會用盡香港的儲備, 亦令到沒有足夠財政資源用於醫療、教育及全民退休保障等。

示威者亦不滿政府亦未有等待土地供應小組的咨詢結果便公佈填海作為主要選項。但填海需時20至30年才提供到1.1百萬人的住宅, 相反其他土地供應選項如收回粉嶺哥爾夫球場、粽地、及用官地收回條例收回地產發展商的農地作公營房屋卻能夠比較快提供到房屋。

On 14th Oct 2018, 10000 Hong Kong protesters hold a rally from Causeway Bay to the Central Office, to protest the government 's plan to spend probably 1 trillion Hong Kong dollars to build artificial islands and accompanying bridges and tunnels in the East of Lantau Island.

The former "East Lantau Metropolis project" proposed to reclaim 1000 hectares , has been replaced this week by an even more ambitious project of "Lantau Tomorrow Vision " of reclaiming 1700 hectares to house 1.1million people by the Chief Executive Carrie Lam, preempting the awaited public consultation report by the Task Force on Land Supply.

The protestors worried the project has not considered the risks under extreme weather, will irreversibly damage the environment, burn up the whole fiscal reserve, and deprive the public of the funding for other more important fields like medical , education, and retirement scheme.

Moreover the project , requiring 2 to 3 decades to complete , cannot cater for the immediate housing needs of the general public, as compared to other source of land supply such as the Fanling Golf Course , brownfield sites and buy back farmland from private estate developers for public housing.

  

大约一萬名市民於十月十四日參與由銅鑼灣至政總的遊行 ,抗議政府計劃用一萬億元填海及興建東大嶼人工島方案。

示威者認為政府的明日大嶼計劃填海1700公頃及其他的橋樑或隧道, 將會對環境造成不可挽回的影響, 亦未有考慮到人工島能否應付極端的天氣, 財政上會用盡香港的儲備, 亦令到沒有足夠財政資源用於醫療、教育及全民退休保障等。

示威者亦不滿政府亦未有等待土地供應小組的咨詢結果便公佈填海作為主要選項。但填海需時20至30年才提供到1.1百萬人的住宅, 相反其他土地供應選項如收回粉嶺哥爾夫球場、粽地、及用官地收回條例收回地產發展商的農地作公營房屋卻能夠比較快提供到房屋。

Parent falcon flies overhead at the Verrazano-Narrows Bridge. Photo: Metropolitan Transportation Authority / Patrick Cashin

Sydney Gardens, Bath.

Kennet & Avon Canal.

Coalbrookdale Footbridge.

A footbridge over the Kennet & Avon Canal, dated 1800.

Designed by John Rennie (1761-1821), engineer, and manufactured by the Coalbrookdale factory at Ironbridge, Shropshire.

Grade ll* listed.

 

The Kennet & Avon Canal is made up of two lengths of navigable river linked by a canal. The name is used to refer to the entire length of the navigation rather than solely to the central canal section. From Bristol to Bath the waterway follows the natural course of the River Avon before the canal links it to the River Kennet at Newbury, and from there to Reading on the River Thames. In all, the waterway incorporates 105 locks.

 

Sydney Gardens were laid out as commercial pleasure grounds between 1792 and 1794; the initial design was by the architect Thomas Baldwin, who, after he went bankrupt, was replaced by Charles Harcourt Masters in 1794. They were opened on 11 May 1795 as Sydney Gardens Vauxhall, and rapidly became a popular place of entertainment, hosting public breakfasts, promenades and galas. The main building was the Sydney Tavern, which stood at the western end of the central walk, and housed tea and card rooms, a ballroom, coffee room and a public house. In 1799, a section of the Kennet & Avon Canal was cut through the gardens, with the addition of decorative bridges and tunnels, which added to the picturesque appeal of the pleasure grounds; these were insisted upon by the proprietors of Sydney Gardens as part of their agreement with the canal company, which was entered into in 1795. The canal company paid £2,100 and the cost of providing the bridges and tunnels as compensation for the intrusion into the gardens. During the early C19, additional features and structures were introduced, adding variety and surprise in accordance with landscape design principles of the period. From c1839, a section of the Great Western Railway was constructed, cutting through the gardens. Later in the C19, further ornamental structures were introduced, but these were largely cleared away after World War Two. In 1891, when the original 99-year lease of the Gardens expired, the entire site, including the Tavern, by then in use as a college, was sold, with the intention of replacing the former Tavern with a large hotel, and remodelling the grounds. The plan was abandoned and in 1908, the site was purchased by Bath City Council; the gardens were opened to the public as a municipal park in 1913, while the Tavern was remodelled by Sir Reginald Blomfield into the Holburne of Menstrie Museum. The gardens remain in use as a public park.

On 14th Oct 2018, 10000 Hong Kong protesters hold a rally from Causeway Bay to the Central Office, to protest the government 's plan to spend probably 1 trillion Hong Kong dollars to build artificial islands and accompanying bridges and tunnels in the East of Lantau Island.

The former "East Lantau Metropolis project" proposed to reclaim 1000 hectares , has been replaced this week by an even more ambitious project of "Lantau Tomorrow Vision " of reclaiming 1700 hectares to house 1.1million people by the Chief Executive Carrie Lam, preempting the awaited public consultation report by the Task Force on Land Supply.

The protestors worried the project has not considered the risks under extreme weather, will irreversibly damage the environment, burn up the whole fiscal reserve, and deprive the public of the funding for other more important fields like medical , education, and retirement scheme.

Moreover the project , requiring 2 to 3 decades to complete , cannot cater for the immediate housing needs of the general public, as compared to other source of land supply such as the Fanling Golf Course , brownfield sites and buy back farmland from private estate developers for public housing.

  

大约一萬名市民於十月十四日參與由銅鑼灣至政總的遊行 ,抗議政府計劃用一萬億元填海及興建東大嶼人工島方案。

示威者認為政府的明日大嶼計劃填海1700公頃及其他的橋樑或隧道, 將會對環境造成不可挽回的影響, 亦未有考慮到人工島能否應付極端的天氣, 財政上會用盡香港的儲備, 亦令到沒有足夠財政資源用於醫療、教育及全民退休保障等。

示威者亦不滿政府亦未有等待土地供應小組的咨詢結果便公佈填海作為主要選項。但填海需時20至30年才提供到1.1百萬人的住宅, 相反其他土地供應選項如收回粉嶺哥爾夫球場、粽地、及用官地收回條例收回地產發展商的農地作公營房屋卻能夠比較快提供到房屋。

On 14th Oct 2018, 10000 Hong Kong protesters hold a rally from Causeway Bay to the Central Office, to protest the government 's plan to spend probably 1 trillion Hong Kong dollars to build artificial islands and accompanying bridges and tunnels in the East of Lantau Island.

The former "East Lantau Metropolis project" proposed to reclaim 1000 hectares , has been replaced this week by an even more ambitious project of "Lantau Tomorrow Vision " of reclaiming 1700 hectares to house 1.1million people by the Chief Executive Carrie Lam, preempting the awaited public consultation report by the Task Force on Land Supply.

The protestors worried the project has not considered the risks under extreme weather, will irreversibly damage the environment, burn up the whole fiscal reserve, and deprive the public of the funding for other more important fields like medical , education, and retirement scheme.

Moreover the project , requiring 2 to 3 decades to complete , cannot cater for the immediate housing needs of the general public, as compared to other source of land supply such as the Fanling Golf Course , brownfield sites and buy back farmland from private estate developers for public housing.

  

大约一萬名市民於十月十四日參與由銅鑼灣至政總的遊行 ,抗議政府計劃用一萬億元填海及興建東大嶼人工島方案。

示威者認為政府的明日大嶼計劃填海1700公頃及其他的橋樑或隧道, 將會對環境造成不可挽回的影響, 亦未有考慮到人工島能否應付極端的天氣, 財政上會用盡香港的儲備, 亦令到沒有足夠財政資源用於醫療、教育及全民退休保障等。

示威者亦不滿政府亦未有等待土地供應小組的咨詢結果便公佈填海作為主要選項。但填海需時20至30年才提供到1.1百萬人的住宅, 相反其他土地供應選項如收回粉嶺哥爾夫球場、粽地、及用官地收回條例收回地產發展商的農地作公營房屋卻能夠比較快提供到房屋。

... the new commuter station in Tungelsta for open. Said the first speaker from the Swedish Transport Administration. The second speaker carried on in much the same way. Talking a bit about the bridges and tunnels constructed because of the many horse farms around here. They didn't mention the broken window, but there was free cake and coffee. Oh, and you can't buy a ticket here if you plan to take the commuter. But the Mayor was planning to inform them about that little mistake, according to her personal photographer who also took a photo of the broken window.

 

Sunrise over Grand Canal Clondalkin Dublin from the Outer Ring Road R136 Bridge 01-02-2012

 

en.wikipedia.org/wiki/List_of_Dublin_bridges_and_tunnels

The line was built in 1867 by local mill owners[citation needed], but operated by the Midland Railway, which owned most of the rail network in the area, and was eventually bought by the Midland in part due to interest from the rival railway company at Keighley, the Great Northern. The Mill owners made a profit, which was abnormal for most lines of that type, as (for strategic reasons) the Midland wanted to prevent the GN from taking over its territory. After falling to the London, Midland and Scottish Railway in 1923 during the Grouping Act, ownership passed to British Railways following nationalisation in 1948. As a part of the rail cutbacks in the 1960s, British Railways closed the line at the end of 1962.

 

However a preservation society was formed which bought the line from BR and reopened it in 1968 as a heritage railway. The line is now a major tourist attraction operated entirely by volunteers and carries more than 110,000 passengers every year[citation needed]. The KWVR is currently the only preserved railway that operates a complete branch line in its original form. It is celebrated among beer lovers for operating the only buffet car serving real ale.

 

The line and its bridges and tunnels including a deviation were built as single track but with provision for duplication, should the need arise. The deviation was built as a condition of the buy out of the Keighley and Worth Valley Railway by the Midland Railway. The need for the deviation was to avoid a large wooden trestle viaduct that crossed a mill pond, as the locals believed the viaduct was unsafe, and supposedly many alighted at Oakworth and continued on foot to Haworth to avoid crossing the viaduct. The original design for the deviation was to skirt the mill pond then through a cutting to rejoin the original formation. However during construction the material in the cutting proved to be unstable, resulting in the construction of the short Mytholmes Tunnel. The original trestle viaduct can be seen in a picture hanging above the fire in the booking hall of Oakworth station.

 

On 10 July 2008, the Duke of Kent visited the railway following the 40th anniversary of its reopening.[3][4][5] While at the railway, the Duke travelled on a specially prepared "Royal Train", consisting of tank locomotive 41241, an LMS Class 2MT, pulling a single carriage, The Old Gentleman's Saloon, as featured in The Railway Children, which is a former North Eastern Railway directors Saloon. While visiting, the Duke travelled in the carriage and on the locomotive footplate.

On 14th Oct 2018, 10000 Hong Kong protesters hold a rally from Causeway Bay to the Central Office, to protest the government 's plan to spend probably 1 trillion Hong Kong dollars to build artificial islands and accompanying bridges and tunnels in the East of Lantau Island.

The former "East Lantau Metropolis project" proposed to reclaim 1000 hectares , has been replaced this week by an even more ambitious project of "Lantau Tomorrow Vision " of reclaiming 1700 hectares to house 1.1million people by the Chief Executive Carrie Lam, preempting the awaited public consultation report by the Task Force on Land Supply.

The protestors worried the project has not considered the risks under extreme weather, will irreversibly damage the environment, burn up the whole fiscal reserve, and deprive the public of the funding for other more important fields like medical , education, and retirement scheme.

Moreover the project , requiring 2 to 3 decades to complete , cannot cater for the immediate housing needs of the general public, as compared to other source of land supply such as the Fanling Golf Course , brownfield sites and buy back farmland from private estate developers for public housing.

  

大约一萬名市民於十月十四日參與由銅鑼灣至政總的遊行 ,抗議政府計劃用一萬億元填海及興建東大嶼人工島方案。

示威者認為政府的明日大嶼計劃填海1700公頃及其他的橋樑或隧道, 將會對環境造成不可挽回的影響, 亦未有考慮到人工島能否應付極端的天氣, 財政上會用盡香港的儲備, 亦令到沒有足夠財政資源用於醫療、教育及全民退休保障等。

示威者亦不滿政府亦未有等待土地供應小組的咨詢結果便公佈填海作為主要選項。但填海需時20至30年才提供到1.1百萬人的住宅, 相反其他土地供應選項如收回粉嶺哥爾夫球場、粽地、及用官地收回條例收回地產發展商的農地作公營房屋卻能夠比較快提供到房屋。

Airport Link M7 bridge and tunnel walk before opening to traffic at the end of July 2012. Bowen Hills, Brisbane.

long line of vehicles on New Jersey side waiting to cross the Holand Tunnel towards New York city....typical rush hour traffic and ...

Wrinkley kindly sent this photograph for publication.

 

Contact and catenary wires have been installed through the bridges and tunnel west of Bolton station and out into the countryside beyond.

 

Copyright Wrinkley 2018.

On 14th Oct 2018, 10000 Hong Kong protesters hold a rally from Causeway Bay to the Central Office, to protest the government 's plan to spend probably 1 trillion Hong Kong dollars to build artificial islands and accompanying bridges and tunnels in the East of Lantau Island.

The former "East Lantau Metropolis project" proposed to reclaim 1000 hectares , has been replaced this week by an even more ambitious project of "Lantau Tomorrow Vision " of reclaiming 1700 hectares to house 1.1million people by the Chief Executive Carrie Lam, preempting the awaited public consultation report by the Task Force on Land Supply.

The protestors worried the project has not considered the risks under extreme weather, will irreversibly damage the environment, burn up the whole fiscal reserve, and deprive the public of the funding for other more important fields like medical , education, and retirement scheme.

Moreover the project , requiring 2 to 3 decades to complete , cannot cater for the immediate housing needs of the general public, as compared to other source of land supply such as the Fanling Golf Course , brownfield sites and buy back farmland from private estate developers for public housing.

  

大约一萬名市民於十月十四日參與由銅鑼灣至政總的遊行 ,抗議政府計劃用一萬億元填海及興建東大嶼人工島方案。

示威者認為政府的明日大嶼計劃填海1700公頃及其他的橋樑或隧道, 將會對環境造成不可挽回的影響, 亦未有考慮到人工島能否應付極端的天氣, 財政上會用盡香港的儲備, 亦令到沒有足夠財政資源用於醫療、教育及全民退休保障等。

示威者亦不滿政府亦未有等待土地供應小組的咨詢結果便公佈填海作為主要選項。但填海需時20至30年才提供到1.1百萬人的住宅, 相反其他土地供應選項如收回粉嶺哥爾夫球場、粽地、及用官地收回條例收回地產發展商的農地作公營房屋卻能夠比較快提供到房屋。

Las Vegas Crosstown Freeway NORTH Tonopah - Reno on an auxiliary left lane EXIT ONLY 1/4 = 0.25 MILE AHEAD followed by Exit 42A - U.S. Highway Route 95 NORTH Reno on an auxiliary right lane EXIT ONLY out of two right lanes may exit ahead and Exit 42B - Interstate 95, U.S. Highway Routes 93 and 95 SOUTH Downtown Las Vegas - Henderson - Boulder City - Phoenix Arizona two right lanes must exit - EXIT ONLY with these two to three overhead signs located at over above Exit 41 - Charleston Blvd., Bonneville Avenue and Alta Drive undercrossing, underpass bridges and tunnels in Las Vegas, Nevada 89102 - 89106.

Horton-in-Ribblesdale station on the Leeds to Settle to Carlisle railway line. I'm a huge fan of this railway line as most of the stations drop you in the heart of remote and beautiful countryside of the Yorkshire Dales, with Horton-in-Ribblesdale in particular being the normal start and end of the Yorkshire Three Peaks Walk linking the three mountains of Whernside, Ingleborough and Pen Y Ghent.

 

This line makes it easily possible to visit the Yorkshire Dales in a weekend from "down south" (a journey I'd not consider doing for a weekend by car due to the distance) and it can be very good value too (I paid less than £32 return from London with tickets booked in advance).

 

This railway line was built by the Midland Railway, a company which did not do things by half (as you'll know if you've ever seen St Pancras station). Built to mainline standards to provide a route for the company to Scotland the line was pushed right through the Yorkshire Dales, with numerous bridges and tunnels to ensure high speeds could be achieved. The building of the line claimed many lives.

 

The line is also a great survivor. The Beeching report recommened the withdrawl of all passenger services from the line and to that end all but two of the stations (Settle and Appleby) were closed with the service reduced to just two passenger trains a day. The line struggled on until 1984 when British Rail posted closure notices on the remaining stations citing the small amount of traffic on the line and the high cost of maintenance. A huge campaign by locals convinced the Government to save the line. Horton in Ribblesdale station re-opened to the public in 1986 and has been beautifully restored.

 

Increasing demand and congestion on the West Coast mainline means the route is now well used by Freight trains whilst passenger services now run once every two hours in each direction.

Looking from the Bronx, the final crown piece is placed at the center of the plate-girder, steel arch. New York Central Railroad tracks (now Metro-North) continued operating during construction. The small railroad bridge in the distance belonged to Grand Central Railroad and today is used by Amtrak. Photographer: unknown. July 8, 1936. Photo courtesy of MTA Bridges and Tunnels Special Archive.

 

The Henry Hudson Bridge, connecting the northern tip of Manhattan to the Riverdale section of the Bronx, turns 75 on Monday, Dec. 12th. The Henry Hudson, at 800-feet, was the world's longest plate-girder, fixed arch bridge when it opened in December 1936. Click for more info.

The line was built in 1867 by local mill owners[citation needed], but operated by the Midland Railway, which owned most of the rail network in the area, and was eventually bought by the Midland in part due to interest from the rival railway company at Keighley, the Great Northern. The Mill owners made a profit, which was abnormal for most lines of that type, as (for strategic reasons) the Midland wanted to prevent the GN from taking over its territory. After falling to the London, Midland and Scottish Railway in 1923 during the Grouping Act, ownership passed to British Railways following nationalisation in 1948. As a part of the rail cutbacks in the 1960s, British Railways closed the line at the end of 1962.

 

However a preservation society was formed which bought the line from BR and reopened it in 1968 as a heritage railway. The line is now a major tourist attraction operated entirely by volunteers and carries more than 110,000 passengers every year[citation needed]. The KWVR is currently the only preserved railway that operates a complete branch line in its original form. It is celebrated among beer lovers for operating the only buffet car serving real ale.

 

The line and its bridges and tunnels including a deviation were built as single track but with provision for duplication, should the need arise. The deviation was built as a condition of the buy out of the Keighley and Worth Valley Railway by the Midland Railway. The need for the deviation was to avoid a large wooden trestle viaduct that crossed a mill pond, as the locals believed the viaduct was unsafe, and supposedly many alighted at Oakworth and continued on foot to Haworth to avoid crossing the viaduct. The original design for the deviation was to skirt the mill pond then through a cutting to rejoin the original formation. However during construction the material in the cutting proved to be unstable, resulting in the construction of the short Mytholmes Tunnel. The original trestle viaduct can be seen in a picture hanging above the fire in the booking hall of Oakworth station.

 

On 10 July 2008, the Duke of Kent visited the railway following the 40th anniversary of its reopening.[3][4][5] While at the railway, the Duke travelled on a specially prepared "Royal Train", consisting of tank locomotive 41241, an LMS Class 2MT, pulling a single carriage, The Old Gentleman's Saloon, as featured in The Railway Children, which is a former North Eastern Railway directors Saloon. While visiting, the Duke travelled in the carriage and on the locomotive footplate.

Whitestone Bridge in New York City - © 2016 David Oppenheimer - Performance Impressions photography archives - www.performanceimpressions.com

1 2 ••• 32 33 35 37 38 ••• 79 80