View allAll Photos Tagged AccessPlatform

The steelwork is now nearing completion

Steel fixers at work on another section

Passageway to classrooms in the teaching block

Frame work for the separating wall dividing the classrooms

Upper floor section in the canteen block

from the lower floor

Work on the roofing is now well underway

Overview of inner yard with work on the hardstanding underway

A section of the overhanging steelwork

Carefully fitting the panel into the frame

Work on the architectural facing brick, that the building will be faced with ,this is the inner yard area

View from second floor up looking west

The teaching block with windows installed and insulation completed

2 Elevated view of the steel structure, here you can see some of the concrete flooring sections in place

Fixing the retaining screws that hold the panel in the frame

Work on the inner yard hard surface, looking towards the workshop block

Steelway manufactured and installed helical staircase to side of digesters

Elevated view of the steel structure, here you can see some of the concrete flooring sections in place

upper floor of canteen block having air ducting installed

The upper section will have glass to make up the wall with the lower section having facing brickwork

Miles of wiring and fittings installed in the roof areas and walls waiting to be connected

The other side of the separating wall

Frame work for the separating wall dividing the classrooms

Work on the air ducting system in the canteen block

Working in a restricted space the banksman must give precise instructions to the crane operator who is on the other side of the site and can see nothing

Slowly manovering a glazed panel into position

Slowly manovering a glazed panel into position

Upper floor view from the south end

Tree Work

 

Removal of Silver Birch.

 

Uprooted by the wind.

Steel structure and precast concrete flooring sections being installed

This is the top of a building support as seen in previous picture

Laying out the start of the reinforcing

The roof of the workshop block with what will be the skylight framework

Steel fixers at work on another section

The max load at the limit of the jib is 1700kg

Over view of the south end of the building

Steel fixers at work on another section

Frame work for the separating wall dividing the classrooms

Work on the roofing is now well underway

Miles of wiring and fittings installed in the roof areas and walls waiting to be connected

Don't drop that spanner! Its a long way down.

Seems like a lot of work for a forgotten lightening rod.