View allAll Photos Tagged AccessPlatform

This is the new site for the Forth Valley Collage;Alloa Annex .

Work is well underway with foundations and retaining walls being constructed.Most of the piling work is completed due to limited space on site the remaining piling work will be completed later

 

www.miller.co.uk

www.malcolmgroup.co.uk

Two Network Rail Volvo FL6 with access platform at Stafford, 14th April 2012. On the left is Y798KNT (UIC 99 70 9912 020-3), whist on the right is DX51BYK (UIC 99 70 9919 041-2).

One of Bernard Hunters mobile tower cranes was used to lift and position the Glazing panels

Seems like a lot of work for a forgotten lightening rod.

Steel erectors bolting an overhanging section in to place

Pair of Genie Z-45/25J boom lifts in place ready for use on the building extension/renovations to Wetherspoon's "Master Mariner", New Brighton, Wirral.

Network Rail Volvo FL6 with access platform W435EOL (UIC 99 70 9912 017-9) at Stafford, 14th April 2012.

One of Bernard Hunters mobile tower cranes was used to lift and position the Glazing panels

Three Network Rail Volvo FL6 with access platform at Stafford, 14th April 2012. On the left is DX51OER (UIC 99 70 9912 019-5), in the centre is DX51BXD (UIC 99 70 9919 035-4) whist on the right is BU51VWW (UIC 99 70 9919 039-6).

Network Rail Volvo FL6E with access platform DX51BWY (UIC 99 70 9912 034-4) at Stafford, 14th April 2012.

The roof of the workshop block with what will be the skylight framework

Steel structure and precast concrete flooring sections being installed

Working on steelwork can be dangerous so the use of safety equipment like this fall restraint harness is essential

Work on the architectural facing brick, that the building will be faced with ,this is the inner yard area

Landing one of the stillage’s, the crane operator cannot see were he is putting the load down so he must rely on the Banksman / Signaller to guide him by radio

I glance up and see something interesting going on...

 

The recently replaced and upgraded telephone mast on the other side of the road is getting some attention from 2 chaps in the basket of a truck mounted tall reach access platform (aka Cherry picker). Time to use the powerful zoom of my camera... as you can see it is highly effective!

Network Rail Mercedes Benz Unimog U400 with Access Platform AE05ETR (UIC 99 70 9979 041-9) at Doncaster Carr depot, 17th July 2013.

One of Bernard Hunters mobile tower cranes was used to lift and position the Glazing panels

View of west side of the teaching block

Steel structure and precast concrete flooring sections being installed

Wide view of the back of the steelwork structure

The max jib hight on this Spierings cranes is 48mt

Steel structure and precast concrete flooring sections being installed

The two elevator shafts and access doorways on each floor

Fall restraint bags ,should one of the men fall during the unloading of the concrete sections these bags will prevent a serious injury

This area will be the fittness This area will be the fitness suite

2 4 5 6 7 8 9