View allAll Photos Tagged 360Camera

🏆Charlotte’s Elite Photo Booth Events Company

🎈Balloons💡Marquee Sparklers 💨Fog 🎶DJ

Photography 🎥Cinematography 🚀Drone

📍N.C.📱704-726-2124 @360PhotoBoothEvents

 

360PhotoBoothEvents.com

instagram.com/360PhotoBoothEvents

facebook.com/360PhotoBoothEvents

tiktok.com/@360PhotoBoothEvents

👰‍♂️ Weddings | ‍💼 Galas | 🎂 Birthdays

🏢 Corporate | 👩‍🏫 School | 🍼 Showers

🏆 15+ Years Experience in Video Production 🎥

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.

 

YouTube Video

YouTube Channel

 

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstände für Munition).

 

Using the new Insta360 ONE R Twin Edition 360 camera.

 

more info about this bunker

after the Second World War this bunker was blown up.

 

This bunker Type was designed by the Kriegsmarine for 'German Navy'.

This bunker Type is part of the Regelbau program in the second world war.

 

how is a Regelbau

Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.

 

The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.

 

Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.

 

Development of Regelbau designs from 1936 to 1940

The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrücken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.

 

#AtlanticWall #Regelbau #Bunker

 

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.

 

YouTube Video

YouTube Channel

 

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstände für Munition).

 

Using the new Insta360 ONE R Twin Edition 360 camera.

 

more info about this bunker

after the Second World War this bunker was blown up.

 

This bunker Type was designed by the Kriegsmarine for 'German Navy'.

This bunker Type is part of the Regelbau program in the second world war.

 

how is a Regelbau

Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.

 

The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.

 

Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.

 

Development of Regelbau designs from 1936 to 1940

The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrücken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.

 

#AtlanticWall #Regelbau #Bunker

 

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.

 

YouTube Video

YouTube Channel

 

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstände für Munition).

 

Using the new Insta360 ONE R Twin Edition 360 camera.

 

more info about this bunker

after the Second World War this bunker was blown up.

 

This bunker Type was designed by the Kriegsmarine for 'German Navy'.

This bunker Type is part of the Regelbau program in the second world war.

 

how is a Regelbau

Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.

 

The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.

 

Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.

 

Development of Regelbau designs from 1936 to 1940

The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrücken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.

 

#AtlanticWall #Regelbau #Bunker

 

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.

 

YouTube Video

YouTube Channel

 

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstände für Munition).

 

Using the new Insta360 ONE R Twin Edition 360 camera.

 

more info about this bunker

after the Second World War this bunker was blown up.

 

This bunker Type was designed by the Kriegsmarine for 'German Navy'.

This bunker Type is part of the Regelbau program in the second world war.

 

how is a Regelbau

Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.

 

The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.

 

Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.

 

Development of Regelbau designs from 1936 to 1940

The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrücken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.

 

#AtlanticWall #Regelbau #Bunker

 

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.

 

YouTube Video

YouTube Channel

 

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstände für Munition).

 

Using the new Insta360 ONE R Twin Edition 360 camera.

 

more info about this bunker

after the Second World War this bunker was blown up.

 

This bunker Type was designed by the Kriegsmarine for 'German Navy'.

This bunker Type is part of the Regelbau program in the second world war.

 

how is a Regelbau

Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.

 

The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.

 

Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.

 

Development of Regelbau designs from 1936 to 1940

The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrücken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.

 

#AtlanticWall #Regelbau #Bunker

 

A 360 flat pano from of the end of the pier

🏆Charlotte’s Elite Photo Booth Events Company

🎈Balloons💡Marquee Sparklers 💨Fog 🎶DJ

Photography 🎥Cinematography 🚀Drone

📍N.C.📱704-726-2124 @360PhotoBoothEvents

 

360PhotoBoothEvents.com

instagram.com/360PhotoBoothEvents

facebook.com/360PhotoBoothEvents

tiktok.com/@360PhotoBoothEvents

👰‍♂️ Weddings | ‍💼 Galas | 🎂 Birthdays

🏢 Corporate | 👩‍🏫 School | 🍼 Showers

🏆 15+ Years Experience in Video Production 🎥

🏆Charlotte’s Elite Photo Booth Events Company

🎈Balloons💡Marquee Sparklers 💨Fog 🎶DJ

Photography 🎥Cinematography 🚀Drone

📍N.C.📱704-726-2124 @360PhotoBoothEvents

 

360PhotoBoothEvents.com

instagram.com/360PhotoBoothEvents

facebook.com/360PhotoBoothEvents

tiktok.com/@360PhotoBoothEvents

👰‍♂️ Weddings | ‍💼 Galas | 🎂 Birthdays

🏢 Corporate | 👩‍🏫 School | 🍼 Showers

🏆 15+ Years Experience in Video Production 🎥

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.

 

YouTube Video

YouTube Channel

 

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstände für Munition).

 

Using the new Insta360 ONE R Twin Edition 360 camera.

 

more info about this bunker

after the Second World War this bunker was blown up.

 

This bunker Type was designed by the Kriegsmarine for 'German Navy'.

This bunker Type is part of the Regelbau program in the second world war.

 

how is a Regelbau

Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.

 

The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.

 

Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.

 

Development of Regelbau designs from 1936 to 1940

The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrücken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.

 

#AtlanticWall #Regelbau #Bunker

 

Mi Sphere Camera is one of the most compatible 360 cameras on the market, supporting most, if not all, mainstream Android (5.0 and above)/iOS (9.0 and above) devices. veer.tv/blog/tiny-yet-beefy-mi-sphere-camera-is-the-whole...

🏆Charlotte’s Elite Photo Booth Events Company

🎈Balloons💡Marquee Sparklers 💨Fog 🎶DJ

Photography 🎥Cinematography 🚀Drone

📍N.C.📱704-726-2124 @360PhotoBoothEvents

 

360PhotoBoothEvents.com

instagram.com/360PhotoBoothEvents

facebook.com/360PhotoBoothEvents

tiktok.com/@360PhotoBoothEvents

👰‍♂️ Weddings | ‍💼 Galas | 🎂 Birthdays

🏢 Corporate | 👩‍🏫 School | 🍼 Showers

🏆 15+ Years Experience in Video Production 🎥

SAMSUNG

 

These are some unstitched 360 photos taken on the 2017 Pedal through the Petals charity bike ride.

🏆Charlotte’s Elite Photo Booth Events Company

🎈Balloons💡Marquee Sparklers 💨Fog 🎶DJ

Photography 🎥Cinematography 🚀Drone

📍N.C.📱704-726-2124 @360PhotoBoothEvents

 

360PhotoBoothEvents.com

instagram.com/360PhotoBoothEvents

facebook.com/360PhotoBoothEvents

tiktok.com/@360PhotoBoothEvents

👰‍♂️ Weddings | ‍💼 Galas | 🎂 Birthdays

🏢 Corporate | 👩‍🏫 School | 🍼 Showers

🏆 15+ Years Experience in Video Production 🎥

“Boondocker”. Best Trail in Revelstoke!? I think so! It’s got it all, steep, gnar, flow, jumps, gaps. One lap just wasn’t enough to get comfortable with the bigger features. I did manage to check off a bigger jump and the awesome rock roller but somehow still felt a bit disappointed not having done the bigger jump out of the three new options and the shark fin jump. Gotta come here with the boys so they can light some fire under my ass.

•

 

#mountainbike #mountainbiking #mtb #mtblife #downhill #downhillmtb #singletrack #xprezo #revelstoke #revelstoked #revelstokebc #bouldermountain #blacktrails #blacktrailsmatter #insta360 #insta360ONER #AdaptToTheAction #360camera #360 #actioncamera #videography #notadrone

SAMSUNG

 

These photos are taken on and around the Richmond BMX track at Gilley's Creek.

SAMSUNG

 

Testing out my new Samsung 360. These are what the photos look like before they're stitched together.

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.

 

YouTube Video

YouTube Channel

 

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstände für Munition).

 

Using the new Insta360 ONE R Twin Edition 360 camera.

 

more info about this bunker

after the Second World War this bunker was blown up.

 

This bunker Type was designed by the Kriegsmarine for 'German Navy'.

This bunker Type is part of the Regelbau program in the second world war.

 

how is a Regelbau

Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.

 

The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.

 

Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.

 

Development of Regelbau designs from 1936 to 1940

The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrücken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.

 

#AtlanticWall #Regelbau #Bunker

 

SAMSUNG

 

Testing out my new Samsung 360. These are what the photos look like before they're stitched together.

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.

 

YouTube Video

YouTube Channel

 

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstände für Munition).

 

Using the new Insta360 ONE R Twin Edition 360 camera.

 

more info about this bunker

after the Second World War this bunker was blown up.

 

This bunker Type was designed by the Kriegsmarine for 'German Navy'.

This bunker Type is part of the Regelbau program in the second world war.

 

how is a Regelbau

Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.

 

The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.

 

Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.

 

Development of Regelbau designs from 1936 to 1940

The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrücken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.

 

#AtlanticWall #Regelbau #Bunker

 

Bar Mitzvah

 

🏆Charlotte’s Elite Photo Booth Events Company

🎈Balloons💡Marquee Sparklers 💨Fog 🎶DJ

Photography 🎥Cinematography 🚀Drone

📍N.C.📱704-726-2124 @360PhotoBoothEvents

 

360PhotoBoothEvents.com

instagram.com/360PhotoBoothEvents

facebook.com/360PhotoBoothEvents

tiktok.com/@360PhotoBoothEvents

👰‍♂️ Weddings | ‍💼 Galas | 🎂 Birthdays

🏢 Corporate | 👩‍🏫 School | 🍼 Showers

🏆 15+ Years Experience in Video Production 🎥

SAMSUNG

 

Some fun shots around the VCU campus. This is what photos look like before they're stitched together.

SAMSUNG

 

Testing out my new Samsung 360 around Richmond, VA.

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.

 

YouTube Video

YouTube Channel

 

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstände für Munition).

 

Using the new Insta360 ONE R Twin Edition 360 camera.

 

more info about this bunker

after the Second World War this bunker was blown up.

 

This bunker Type was designed by the Kriegsmarine for 'German Navy'.

This bunker Type is part of the Regelbau program in the second world war.

 

how is a Regelbau

Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.

 

The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.

 

Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.

 

Development of Regelbau designs from 1936 to 1940

The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrücken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.

 

#AtlanticWall #Regelbau #Bunker

 

SAMSUNG

 

These photos are taken on and around the Richmond BMX track at Gilley's Creek. These photos show what a photo looks like before stitching.

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.

 

YouTube Video

YouTube Channel

 

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstände für Munition).

 

Using the new Insta360 ONE R Twin Edition 360 camera.

 

more info about this bunker

after the Second World War this bunker was blown up.

 

This bunker Type was designed by the Kriegsmarine for 'German Navy'.

This bunker Type is part of the Regelbau program in the second world war.

 

how is a Regelbau

Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.

 

The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.

 

Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.

 

Development of Regelbau designs from 1936 to 1940

The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrücken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.

 

#AtlanticWall #Regelbau #Bunker

 

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.

 

YouTube Video

YouTube Channel

 

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstände für Munition).

 

Using the new Insta360 ONE R Twin Edition 360 camera.

 

more info about this bunker

after the Second World War this bunker was blown up.

 

This bunker Type was designed by the Kriegsmarine for 'German Navy'.

This bunker Type is part of the Regelbau program in the second world war.

 

how is a Regelbau

Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.

 

The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.

 

Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.

 

Development of Regelbau designs from 1936 to 1940

The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrücken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.

 

#AtlanticWall #Regelbau #Bunker

 

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.

 

YouTube Video

YouTube Channel

 

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstände für Munition).

 

Using the new Insta360 ONE R Twin Edition 360 camera.

 

more info about this bunker

after the Second World War this bunker was blown up.

 

This bunker Type was designed by the Kriegsmarine for 'German Navy'.

This bunker Type is part of the Regelbau program in the second world war.

 

how is a Regelbau

Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.

 

The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.

 

Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.

 

Development of Regelbau designs from 1936 to 1940

The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrücken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.

 

#AtlanticWall #Regelbau #Bunker

 

🏆Charlotte’s Elite Photo Booth Events Company

🎈Balloons💡Marquee Sparklers 💨Fog 🎶DJ

Photography 🎥Cinematography 🚀Drone

📍N.C.📱704-726-2124 @360PhotoBoothEvents

 

360PhotoBoothEvents.com

instagram.com/360PhotoBoothEvents

facebook.com/360PhotoBoothEvents

tiktok.com/@360PhotoBoothEvents

👰‍♂️ Weddings | ‍💼 Galas | 🎂 Birthdays

🏢 Corporate | 👩‍🏫 School | 🍼 Showers

🏆 15+ Years Experience in Video Production 🎥

WATCH RECAP VIDEO --> youtu.be/KUe-r58v4Jo

 

🏆Charlotte’s Elite Photo Booth Events Company 🎈Balloons💡Marquee Sparklers 💨Fog 🎶DJ Photography 🎥Cinematography 🚀Drone 📍N.C.📱704-726-2124 @360PhotoBoothEvents 360PhotoBoothEvents.com instagram.com/360PhotoBoothEvents facebook.com/360PhotoBoothEvents tiktok.com/@360PhotoBoothEvents 👰‍♂️ Weddings | ‍💼 Galas | 🎂 Birthdays 🏢 Corporate | 👩‍🏫 School | 🍼 Showers 🏆 15+ Years Experience in Video Production 🎥

Fusion 360 camera by GoPro.

🏆Charlotte’s Elite Photo Booth Events Company

🎈Balloons💡Marquee Sparklers 💨Fog 🎶DJ

Photography 🎥Cinematography 🚀Drone

📍N.C.📱704-726-2124 @360PhotoBoothEvents

 

360PhotoBoothEvents.com

instagram.com/360PhotoBoothEvents

facebook.com/360PhotoBoothEvents

tiktok.com/@360PhotoBoothEvents

👰‍♂️ Weddings | ‍💼 Galas | 🎂 Birthdays

🏢 Corporate | 👩‍🏫 School | 🍼 Showers

🏆 15+ Years Experience in Video Production 🎥

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.

 

YouTube Video

YouTube Channel

 

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstände für Munition).

 

Using the new Insta360 ONE R Twin Edition 360 camera.

 

more info about this bunker

after the Second World War this bunker was blown up.

 

This bunker Type was designed by the Kriegsmarine for 'German Navy'.

This bunker Type is part of the Regelbau program in the second world war.

 

how is a Regelbau

Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.

 

The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.

 

Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.

 

Development of Regelbau designs from 1936 to 1940

The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrücken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.

 

#AtlanticWall #Regelbau #Bunker

 

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.

 

YouTube Video

YouTube Channel

 

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstände für Munition).

 

Using the new Insta360 ONE R Twin Edition 360 camera.

 

more info about this bunker

after the Second World War this bunker was blown up.

 

This bunker Type was designed by the Kriegsmarine for 'German Navy'.

This bunker Type is part of the Regelbau program in the second world war.

 

how is a Regelbau

Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.

 

The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.

 

Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.

 

Development of Regelbau designs from 1936 to 1940

The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrücken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.

 

#AtlanticWall #Regelbau #Bunker

 

🏆Charlotte’s Elite Photo Booth Events Company

🎈Balloons💡Marquee Sparklers 💨Fog 🎶DJ

Photography 🎥Cinematography 🚀Drone

📍N.C.📱704-726-2124 @360PhotoBoothEvents

 

360PhotoBoothEvents.com

instagram.com/360PhotoBoothEvents

facebook.com/360PhotoBoothEvents

tiktok.com/@360PhotoBoothEvents

👰‍♂️ Weddings | ‍💼 Galas | 🎂 Birthdays

🏢 Corporate | 👩‍🏫 School | 🍼 Showers

🏆 15+ Years Experience in Video Production 🎥

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.

 

YouTube Video

YouTube Channel

 

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstände für Munition).

 

Using the new Insta360 ONE R Twin Edition 360 camera.

 

more info about this bunker

after the Second World War this bunker was blown up.

 

This bunker Type was designed by the Kriegsmarine for 'German Navy'.

This bunker Type is part of the Regelbau program in the second world war.

 

how is a Regelbau

Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.

 

The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.

 

Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.

 

Development of Regelbau designs from 1936 to 1940

The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrücken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.

 

#AtlanticWall #Regelbau #Bunker

 

🏆Charlotte’s Elite Photo Booth Events Company

🎈Balloons💡Marquee Sparklers 💨Fog 🎶DJ

Photography 🎥Cinematography 🚀Drone

📍N.C.📱704-726-2124 @360PhotoBoothEvents

 

360PhotoBoothEvents.com

instagram.com/360PhotoBoothEvents

facebook.com/360PhotoBoothEvents

tiktok.com/@360PhotoBoothEvents

👰‍♂️ Weddings | ‍💼 Galas | 🎂 Birthdays

🏢 Corporate | 👩‍🏫 School | 🍼 Showers

🏆 15+ Years Experience in Video Production 🎥

🏆Charlotte’s Elite Photo Booth Events Company

🎈Balloons💡Marquee Sparklers 💨Fog 🎶DJ

Photography 🎥Cinematography 🚀Drone

📍N.C.📱704-726-2124 @360PhotoBoothEvents

 

360PhotoBoothEvents.com

instagram.com/360PhotoBoothEvents

facebook.com/360PhotoBoothEvents

tiktok.com/@360PhotoBoothEvents

👰‍♂️ Weddings | ‍💼 Galas | 🎂 Birthdays

🏢 Corporate | 👩‍🏫 School | 🍼 Showers

🏆 15+ Years Experience in Video Production 🎥

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.

 

YouTube Video

YouTube Channel

 

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstände für Munition).

 

Using the new Insta360 ONE R Twin Edition 360 camera.

 

more info about this bunker

after the Second World War this bunker was blown up.

 

This bunker Type was designed by the Kriegsmarine for 'German Navy'.

This bunker Type is part of the Regelbau program in the second world war.

 

how is a Regelbau

Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.

 

The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.

 

Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.

 

Development of Regelbau designs from 1936 to 1940

The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrücken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.

 

#AtlanticWall #Regelbau #Bunker

 

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.

 

YouTube Video

YouTube Channel

 

AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstände für Munition).

 

Using the new Insta360 ONE R Twin Edition 360 camera.

 

more info about this bunker

after the Second World War this bunker was blown up.

 

This bunker Type was designed by the Kriegsmarine for 'German Navy'.

This bunker Type is part of the Regelbau program in the second world war.

 

how is a Regelbau

Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.

 

The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.

 

Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.

 

Development of Regelbau designs from 1936 to 1940

The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrücken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.

 

#AtlanticWall #Regelbau #Bunker

 

1 2 ••• 38 39 41 43 44 ••• 79 80