View allAll Photos Tagged 360Camera
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstรคnde fรผr Munition).
Using the new Insta360 ONE R Twin Edition 360 camera.
more info about this bunker
after the Second World War this bunker was blown up.
This bunker Type was designed by the Kriegsmarine for 'German Navy'.
This bunker Type is part of the Regelbau program in the second world war.
how is a Regelbau
Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.
The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.
Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.
Development of Regelbau designs from 1936 to 1940
The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrรผcken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.
#AtlanticWall #Regelbau #Bunker
Adam took me out climbing to give me a little refresher. I havenโt been out on a wall since nursing school back in 2002 ๐. Still had my old climbing shoes from Germany. First route was the Gomer Line, a 2 star classic! 5.9 B Grade 25m. Squeeze Me In, 5.9 B Grade 26m was the second one. Absolutely exhilarating feeling, me and Laura have been thinking of buying some climbing gear and getting into it. Next time Adam is gonna take me to the boulderfields for some bouldering.
โข
#climbing #rockclimbing #rockclimbinglife #rockclimbingwall #rockclimbingkelowna #thecrag #sportclimbing #ropeclimbing #kelowna #explorekelowna #kelownabc #kelownaviews #explorebc #britishcolumbia #okanagan #okanaganvalley #exploreokanagan #insta360 #insta360onex #360camera #360
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstรคnde fรผr Munition).
Using the new Insta360 ONE R Twin Edition 360 camera.
more info about this bunker
after the Second World War this bunker was blown up.
This bunker Type was designed by the Kriegsmarine for 'German Navy'.
This bunker Type is part of the Regelbau program in the second world war.
how is a Regelbau
Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.
The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.
Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.
Development of Regelbau designs from 1936 to 1940
The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrรผcken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.
#AtlanticWall #Regelbau #Bunker
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstรคnde fรผr Munition).
Using the new Insta360 ONE R Twin Edition 360 camera.
more info about this bunker
after the Second World War this bunker was blown up.
This bunker Type was designed by the Kriegsmarine for 'German Navy'.
This bunker Type is part of the Regelbau program in the second world war.
how is a Regelbau
Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.
The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.
Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.
Development of Regelbau designs from 1936 to 1940
The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrรผcken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.
#AtlanticWall #Regelbau #Bunker
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstรคnde fรผr Munition).
Using the new Insta360 ONE R Twin Edition 360 camera.
more info about this bunker
after the Second World War this bunker was blown up.
This bunker Type was designed by the Kriegsmarine for 'German Navy'.
This bunker Type is part of the Regelbau program in the second world war.
how is a Regelbau
Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.
The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.
Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.
Development of Regelbau designs from 1936 to 1940
The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrรผcken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.
#AtlanticWall #Regelbau #Bunker
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstรคnde fรผr Munition).
Using the new Insta360 ONE R Twin Edition 360 camera.
more info about this bunker
after the Second World War this bunker was blown up.
This bunker Type was designed by the Kriegsmarine for 'German Navy'.
This bunker Type is part of the Regelbau program in the second world war.
how is a Regelbau
Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.
The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.
Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.
Development of Regelbau designs from 1936 to 1940
The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrรผcken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.
#AtlanticWall #Regelbau #Bunker
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstรคnde fรผr Munition).
Using the new Insta360 ONE R Twin Edition 360 camera.
more info about this bunker
after the Second World War this bunker was blown up.
This bunker Type was designed by the Kriegsmarine for 'German Navy'.
This bunker Type is part of the Regelbau program in the second world war.
how is a Regelbau
Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.
The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.
Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.
Development of Regelbau designs from 1936 to 1940
The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrรผcken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.
#AtlanticWall #Regelbau #Bunker
These are unstitched 360 photos.
I decided to leave my "real" cameras at home this year and take one of my more whimsical cameras with me on our annual trip to SWVA. This year my father and I did our traditional bike ride on the Virginia Creeper Trail (Shout out to the Shuttle Shack for another excellent bike rental and ride to the top of the trail). The next day, we went on tot he Cumberland Gap. Our hotel was in Tennessee but overlooked the Pinnacle which is in Virginia. The Pinnacle has views of Kentucky and Tennessee.
SAMSUNG
Testing out my new Samsung 360. These are what the photos look like before they're stitched together.
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstรคnde fรผr Munition).
Using the new Insta360 ONE R Twin Edition 360 camera.
more info about this bunker
after the Second World War this bunker was blown up.
This bunker Type was designed by the Kriegsmarine for 'German Navy'.
This bunker Type is part of the Regelbau program in the second world war.
how is a Regelbau
Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.
The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.
Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.
Development of Regelbau designs from 1936 to 1940
The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrรผcken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.
#AtlanticWall #Regelbau #Bunker
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstรคnde fรผr Munition).
Using the new Insta360 ONE R Twin Edition 360 camera.
more info about this bunker
after the Second World War this bunker was blown up.
This bunker Type was designed by the Kriegsmarine for 'German Navy'.
This bunker Type is part of the Regelbau program in the second world war.
how is a Regelbau
Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.
The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.
Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.
Development of Regelbau designs from 1936 to 1940
The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrรผcken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.
#AtlanticWall #Regelbau #Bunker
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstรคnde fรผr Munition).
Using the new Insta360 ONE R Twin Edition 360 camera.
more info about this bunker
after the Second World War this bunker was blown up.
This bunker Type was designed by the Kriegsmarine for 'German Navy'.
This bunker Type is part of the Regelbau program in the second world war.
how is a Regelbau
Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.
The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.
Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.
Development of Regelbau designs from 1936 to 1940
The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrรผcken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.
#AtlanticWall #Regelbau #Bunker
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstรคnde fรผr Munition).
Using the new Insta360 ONE R Twin Edition 360 camera.
more info about this bunker
after the Second World War this bunker was blown up.
This bunker Type was designed by the Kriegsmarine for 'German Navy'.
This bunker Type is part of the Regelbau program in the second world war.
how is a Regelbau
Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.
The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.
Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.
Development of Regelbau designs from 1936 to 1940
The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrรผcken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.
#AtlanticWall #Regelbau #Bunker
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstรคnde fรผr Munition).
Using the new Insta360 ONE R Twin Edition 360 camera.
more info about this bunker
after the Second World War this bunker was blown up.
This bunker Type was designed by the Kriegsmarine for 'German Navy'.
This bunker Type is part of the Regelbau program in the second world war.
how is a Regelbau
Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.
The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.
Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.
Development of Regelbau designs from 1936 to 1940
The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrรผcken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.
#AtlanticWall #Regelbau #Bunker
Bar Mitzvah
๐Charlotteโs Elite Photo Booth Events Company
๐Balloons๐กMarquee Sparklers ๐จFog ๐ถDJ
Photography ๐ฅCinematography ๐Drone
๐N.C.๐ฑ704-726-2124 @360PhotoBoothEvents
instagram.com/360PhotoBoothEvents
facebook.com/360PhotoBoothEvents
tiktok.com/@360PhotoBoothEvents
๐ฐโโ๏ธ Weddings | โ๐ผ Galas | ๐ Birthdays
๐ข Corporate | ๐ฉโ๐ซ School | ๐ผ Showers
๐ 15+ Years Experience in Video Production ๐ฅ
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstรคnde fรผr Munition).
Using the new Insta360 ONE R Twin Edition 360 camera.
more info about this bunker
after the Second World War this bunker was blown up.
This bunker Type was designed by the Kriegsmarine for 'German Navy'.
This bunker Type is part of the Regelbau program in the second world war.
how is a Regelbau
Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.
The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.
Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.
Development of Regelbau designs from 1936 to 1940
The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrรผcken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.
#AtlanticWall #Regelbau #Bunker
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstรคnde fรผr Munition).
Using the new Insta360 ONE R Twin Edition 360 camera.
more info about this bunker
after the Second World War this bunker was blown up.
This bunker Type was designed by the Kriegsmarine for 'German Navy'.
This bunker Type is part of the Regelbau program in the second world war.
how is a Regelbau
Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.
The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.
Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.
Development of Regelbau designs from 1936 to 1940
The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrรผcken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.
#AtlanticWall #Regelbau #Bunker
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstรคnde fรผr Munition).
Using the new Insta360 ONE R Twin Edition 360 camera.
more info about this bunker
after the Second World War this bunker was blown up.
This bunker Type was designed by the Kriegsmarine for 'German Navy'.
This bunker Type is part of the Regelbau program in the second world war.
how is a Regelbau
Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.
The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.
Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.
Development of Regelbau designs from 1936 to 1940
The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrรผcken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.
#AtlanticWall #Regelbau #Bunker
I decided to leave my "real" cameras at home this year and take one of my more whimsical cameras with me on our annual trip to SWVA. This year my father and I did our traditional bike ride on the Virginia Creeper Trail (Shout out to the Shuttle Shack for another excellent bike rental and ride to the top of the trail). The next day, we went on tot he Cumberland Gap. Our hotel was in Tennessee but overlooked the Pinnacle which is in Virginia. The Pinnacle has views of Kentucky and Tennessee.
Truist 10K Around The Crown Race
๐Charlotteโs Elite Photo Booth Events Company
๐Balloons๐กMarquee Sparklers ๐จFog ๐ถDJ
Photography ๐ฅCinematography ๐Drone
๐N.C.๐ฑ704-726-2124 @360PhotoBoothEvents
instagram.com/360PhotoBoothEvents
facebook.com/360PhotoBoothEvents
tiktok.com/@360PhotoBoothEvents
๐ฐโโ๏ธ Weddings | โ๐ผ Galas | ๐ Birthdays
๐ข Corporate | ๐ฉโ๐ซ School | ๐ผ Showers
๐ 15+ Years Experience in Video Production ๐ฅ
Truist 10K Around The Crown Race
๐Charlotteโs Elite Photo Booth Events Company
๐Balloons๐กMarquee Sparklers ๐จFog ๐ถDJ
Photography ๐ฅCinematography ๐Drone
๐N.C.๐ฑ704-726-2124 @360PhotoBoothEvents
instagram.com/360PhotoBoothEvents
facebook.com/360PhotoBoothEvents
tiktok.com/@360PhotoBoothEvents
๐ฐโโ๏ธ Weddings | โ๐ผ Galas | ๐ Birthdays
๐ข Corporate | ๐ฉโ๐ซ School | ๐ผ Showers
๐ 15+ Years Experience in Video Production ๐ฅ
๐Charlotteโs Elite Photo Booth Events Company
๐Balloons๐กMarquee Sparklers ๐จFog ๐ถDJ
Photography ๐ฅCinematography ๐Drone
๐N.C.๐ฑ704-726-2124 @360PhotoBoothEvents
instagram.com/360PhotoBoothEvents
facebook.com/360PhotoBoothEvents
tiktok.com/@360PhotoBoothEvents
๐ฐโโ๏ธ Weddings | โ๐ผ Galas | ๐ Birthdays
๐ข Corporate | ๐ฉโ๐ซ School | ๐ผ Showers
๐ 15+ Years Experience in Video Production ๐ฅ
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstรคnde fรผr Munition).
Using the new Insta360 ONE R Twin Edition 360 camera.
more info about this bunker
after the Second World War this bunker was blown up.
This bunker Type was designed by the Kriegsmarine for 'German Navy'.
This bunker Type is part of the Regelbau program in the second world war.
how is a Regelbau
Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.
The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.
Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.
Development of Regelbau designs from 1936 to 1940
The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrรผcken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.
#AtlanticWall #Regelbau #Bunker
Pinch me, I must be dreaming. No more are these trails just videos I drool over from my desert like hometown. No flow here as far as the eye can reach. Just lots of yank, skinnies and mind blowing trails and features. So much love and work put into these trails, like there was actual literal masonry work installed. .
@laura.j66 surprised me with a 3 day getaway to the Northshore, our Airbnb is at the foot of Mount Fromme . Started with the first classic called โOilcanโ, these trails date back to the mid 90s .
โข
#mountainbike #mountainbiking #mtb #mtblife #downhill #downhillmtb #singletrack #xprezo #northshore #mountfromme #insta360 #insta360ONER #AdaptToTheAction #360camera #360 #actioncamera #videography #notadrone #westcoast
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstรคnde fรผr Munition).
Using the new Insta360 ONE R Twin Edition 360 camera.
more info about this bunker
after the Second World War this bunker was blown up.
This bunker Type was designed by the Kriegsmarine for 'German Navy'.
This bunker Type is part of the Regelbau program in the second world war.
how is a Regelbau
Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.
The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.
Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.
Development of Regelbau designs from 1936 to 1940
The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrรผcken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.
#AtlanticWall #Regelbau #Bunker
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstรคnde fรผr Munition).
Using the new Insta360 ONE R Twin Edition 360 camera.
more info about this bunker
after the Second World War this bunker was blown up.
This bunker Type was designed by the Kriegsmarine for 'German Navy'.
This bunker Type is part of the Regelbau program in the second world war.
how is a Regelbau
Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.
The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.
Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.
Development of Regelbau designs from 1936 to 1940
The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrรผcken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.
#AtlanticWall #Regelbau #Bunker
๐Charlotteโs Elite Photo Booth Events Company
๐Balloons๐กMarquee Sparklers ๐จFog ๐ถDJ
Photography ๐ฅCinematography ๐Drone
๐N.C.๐ฑ704-726-2124 @360PhotoBoothEvents
instagram.com/360PhotoBoothEvents
facebook.com/360PhotoBoothEvents
tiktok.com/@360PhotoBoothEvents
๐ฐโโ๏ธ Weddings | โ๐ผ Galas | ๐ Birthdays
๐ข Corporate | ๐ฉโ๐ซ School | ๐ผ Showers
๐ 15+ Years Experience in Video Production ๐ฅ
๐Charlotteโs Elite Photo Booth Events Company
๐Balloons๐กMarquee Sparklers ๐จFog ๐ถDJ
Photography ๐ฅCinematography ๐Drone
๐N.C.๐ฑ704-726-2124 @360PhotoBoothEvents
instagram.com/360PhotoBoothEvents
facebook.com/360PhotoBoothEvents
tiktok.com/@360PhotoBoothEvents
๐ฐโโ๏ธ Weddings | โ๐ผ Galas | ๐ Birthdays
๐ข Corporate | ๐ฉโ๐ซ School | ๐ผ Showers
๐ 15+ Years Experience in Video Production ๐ฅ
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstรคnde fรผr Munition).
Using the new Insta360 ONE R Twin Edition 360 camera.
more info about this bunker
after the Second World War this bunker was blown up.
This bunker Type was designed by the Kriegsmarine for 'German Navy'.
This bunker Type is part of the Regelbau program in the second world war.
how is a Regelbau
Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.
The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.
Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.
Development of Regelbau designs from 1936 to 1940
The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrรผcken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.
#AtlanticWall #Regelbau #Bunker
Summer time is finally here and we took the kids on their first day trip. We packed up the bikes and drove up to Oyama and rode the rail trail along the Kalamalka Lake. I got to test my knee and I had no limitations. There was no elevation so I couldnโt see how my calf would do. So I guess Iโm ready to ride again as long as I donโt crash ๐ค๐.
โข
#familyadventures #familyadventure #adventurefamily #mountainbike #mountainbiking #mtb #mtblife #xprezo #kelowna #explorekelowna #kelownabc #kelownaviews #explorebc #britishcolumbia #okanagan #okanaganvalley #exploreokanagan #oyamabc #lakecountry #insta360 #insta360onex #360camera #360
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstรคnde fรผr Munition).
Using the new Insta360 ONE R Twin Edition 360 camera.
more info about this bunker
after the Second World War this bunker was blown up.
This bunker Type was designed by the Kriegsmarine for 'German Navy'.
This bunker Type is part of the Regelbau program in the second world war.
how is a Regelbau
Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.
The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.
Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.
Development of Regelbau designs from 1936 to 1940
The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrรผcken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.
#AtlanticWall #Regelbau #Bunker
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery.
AtlanticWall Regelbau Fl246 - Ammunition depot for heavy Flak Battery - also known as Ammunition Bunker (Unterstรคnde fรผr Munition).
Using the new Insta360 ONE R Twin Edition 360 camera.
more info about this bunker
after the Second World War this bunker was blown up.
This bunker Type was designed by the Kriegsmarine for 'German Navy'.
This bunker Type is part of the Regelbau program in the second world war.
how is a Regelbau
Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings.
The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War.
Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme.
Development of Regelbau designs from 1936 to 1940
The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrรผcken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller.
#AtlanticWall #Regelbau #Bunker