Victoria Connection Track
After KCS rebuilt the former SP Macaroni Line, they had UP rebuild the connection at the south end of the line (which is still owned by UP). Here, KCS's F9's take the business train through the 10 mph connection track to UP's Cuero Sub at Victoria. The train will then continue down UP trackage rights another 100 miles back to KCS rails at Robstown.
The track in the foreground is another rebuilt connector, which allows KCS trains to access the Victoria Industrial Lead as an alternate route to Bloomington.
BKCLR 27 (Business Train- Kansas City, MO to Laredo, TX)
KCS FP9A #1
KCS F9B #3
KCS FP9A #2
Victoria, TX
October 29th, 2022
Victoria Connection Track
After KCS rebuilt the former SP Macaroni Line, they had UP rebuild the connection at the south end of the line (which is still owned by UP). Here, KCS's F9's take the business train through the 10 mph connection track to UP's Cuero Sub at Victoria. The train will then continue down UP trackage rights another 100 miles back to KCS rails at Robstown.
The track in the foreground is another rebuilt connector, which allows KCS trains to access the Victoria Industrial Lead as an alternate route to Bloomington.
BKCLR 27 (Business Train- Kansas City, MO to Laredo, TX)
KCS FP9A #1
KCS F9B #3
KCS FP9A #2
Victoria, TX
October 29th, 2022