View allAll Photos Tagged tsrtc
New Volvo 8400 low-floor A/C buses of TSRTC Hyderabad at Cyber Towers junction in HITEC-City. This bus route number is 222 of Miyapur-2 depot.
Raw File: image_58 (Picmarkr).IMAG8856.20122014
New building under construction in Mindspace (K. Raheja) IT Park in HITEC City, Hyderabad.
Raw File: image_45 (Picmarkr).IMAG9136.09022015
Continental Hospitals under-construction at Nanakramguda Financial district near Gachibowli, Hyderabad.
Raw File: image_1 (Picmarkr).IMAG9049.09022015
Mindspace (K. Raheja) IT Park in HITEC City, Hyderabad.
Raw File: image_1 (Picmarkr).IMAG9138.10022015
Telangana State Road Transport Corporation TSRTC (Old APSRTC-Andhra Pradesh State Road Transport Corporation) Metro Deluxe bus at ECIL commuter ammenity centre (CAC), part of modern bus stands replacing the older bus stands in major areas of Hyderabad.
Raw File: image_6 (Picmarkr).IMAG8172.17092014
K. Raheja Mindspace IT Park in HITEC City, Hyderabad.
Raw File: image_4 (Picmarkr).IMAG9141.10022015
NH 163 (Old NH 202), Bhopalapatnam-Warangal-Hyderabad highway.
There are few bypass roads built as part of phase-I four-laning from Annojiguda (near Ghatkesar) to Raigir (after Bhongir near Yadagirigutta)-{Old 2011 The Hindu article: Four-laning going on at brisk pace, www.thehindu.com/todays-paper/tp-national/tp-andhraprades...}. The bypass stretches are at Ghatkesar (from ORR Annojiguda junction), Aushapur and Bhongir (Bhuvangiri or Bhongiri). The 4-laning from Raigiri to Warangal is proposed to be taken up as Phase-II. Even the original stretches of highway that were bypassed is 4-laned except for short stretches.
Raw File: image_1 (Picmarkr).IMAG9265 (edited).25022015
Time table of bus route no. 222 at Koti bus terminal. This bus is a new Volvo 8400 AC bus of Musheerabad-2 depot operating from Koti to Patancheru and return back to Koti. The frequency of this bus is 10 minutes.
One of the buses at the Koti commuter ammenity centre-
www.flickr.com/photos/world8115/16294249915/
Raw File: image_10 (Picmarkr).IMAG9021.16012015
Building No. 10 (Titus) in Mindspace (K. Raheja) IT Park, HITEC City, Hyderabad. It includes the offices of Verizon, Qualcomm, Isoft Solution Centre and ICICI bank branch.
Raw File: image_8 (Picmarkr).IMAG9145.10022015
TSRTC Hyderabad's new Volvo 8400 City Metro Luxury Bus running in the route of 17H/10H (ECIL 'X' Roads to Kondapur) of Hyderabad Central University (HCU) depot at Uppal bus stand on St.Johns/Rezimental Bazar Main Road in Secunderabad. In the background you can see the demolition and re-construction of buildings for road widening, part of Hyderabad Metro Rail works for Stage-IV (Mettuguda-Begumpet), part of Nagole-Shilparamam line (Line 3) in Phase-I of the project.
Raw File: image_58 (Picmarkr).IMAG8861.20122014
New Volvo 8400 low-floor A/C buses of TSRTC Hyderabad at Cyber Towers junction in HITEC-City.
Raw File: image_57 (Picmarkr).IMAG8855.20122014
My Home Abhra residential towers on HITEC City (Mindspace) to Inorbit Mall Road.
Raw File: image_14 (Picmarkr).IMAG9151.10022015
NH 163 (Old NH 202), Bhopalapatnam-Warangal-Hyderabad highway. This pics are after toll plaza approaching Hyderabad.
There are few bypass roads built as part of phase-I four-laning from Annojiguda (near Ghatkesar) to Raigir (after Bhongir near Yadagirigutta)-{Old 2011 The Hindu article: Four-laning going on at brisk pace, www.thehindu.com/todays-paper/tp-national/tp-andhraprades...}. The bypass stretches are at Ghatkesar (from ORR Annojiguda junction), Aushapur and Bhongir (Bhuvangiri or Bhongiri). The 4-laning from Raigiri to Warangal is proposed to be taken up as Phase-II. Even the original stretches of highway that were bypassed is 4-laned except for short stretches.
Raw File: image_6 (Picmarkr).IMAG9282.25022015
CSC (Building No. 7) in Mindspace (K. Raheja) IT Park, HITEC City, Hyderabad. Seen behind it is Building No. 8 which has offices of Oracle India and Qualcomm.
Raw File: image_7 (Picmarkr).IMAG9144.10022015
HITEC City to Inorbit Mall Road. My Home Abhra residential towers can be seen on the right.
Raw File: image_12 (Picmarkr).IMAG9149.10022015
TSRTC Hyderabad's new Volvo 8400 City Metro Luxury Bus running in the route of 17H/10H (ECIL 'X' Roads to Kondapur) of Hyderabad Central University (HCU) depot at Uppal bus stand on St.Johns/Rezimental Bazar Main Road in Secunderabad. In the background you can see the demolition and re-construction of buildings for road widening, part of Hyderabad Metro Rail works for Stage-III (Mettuguda-Begumpet), part of Nagole-Shilparamam/Raidurg line (Line 3) in Phase-I of the project.
Raw File: image_71 (Picmarkr).IMAG8863.20122014
TSRTC Hyderabad's new Volvo 8400 City Metro Luxury Bus running in the route of 17H/10H (ECIL 'X' Roads to Kondapur) of Hyderabad Central University (HCU) depot at Uppal bus stand on St.Johns/Rezimental Bazar Main Road in Secunderabad. In the background you can see the demolition and re-construction of buildings for road widening, part of Hyderabad Metro Rail works for Stage-III (Mettuguda-Begumpet), part of Nagole-Shilparamam/Raidurg line (Line 3) in Phase-I of the project.
Raw File: image_70 (Picmarkr).IMAG8862.20122014
Satva Technology Park, IT office tower by Sattva Group on Mindspace (HITEC City)-Inorbit Mall Road.
Raw File: image_11 (Picmarkr).IMAG9148.10022015
Hyderabad ORR Annojiguda junction intersection with NH 163 (Old NH 202), Bhopalapatnam-Warangal-Hyderabad highway. This pics are after toll plaza approaching Hyderabad.
There are few bypass roads built as part of phase-I four-laning from Annojiguda (near Ghatkesar) to Raigir (after Bhongir near Yadagirigutta)-{Old 2011 The Hindu article: Four-laning going on at brisk pace, www.thehindu.com/todays-paper/tp-national/tp-andhraprades...}. The bypass stretches are at Ghatkesar (from ORR Annojiguda junction), Aushapur and Bhongir (Bhuvangiri or Bhongiri). The 4-laning from Raigiri to Warangal is proposed to be taken up as Phase-II. Even the original stretches of highway that were bypassed is 4-laned except for short stretches.
Raw File: image_7 (Picmarkr).IMAG9285 (edited).25022015
HITEC City to Inorbit Mall Road. Satva Technology Park and My Home Abhra residetial towers can be seen in the distance.
Raw File: image_10 (Picmarkr).IMAG9147.10022015
NH 163 (Old NH 202), Bhopalapatnam-Warangal-Hyderabad highway. This pics are after toll plaza approaching Hyderabad.
There are few bypass roads built as part of phase-I four-laning from Annojiguda (near Ghatkesar) to Raigir (after Bhongir near Yadagirigutta)-{Old 2011 The Hindu article: Four-laning going on at brisk pace, www.thehindu.com/todays-paper/tp-national/tp-andhraprades...}. The bypass stretches are at Ghatkesar (from ORR Annojiguda junction), Aushapur and Bhongir (Bhuvangiri or Bhongiri). The 4-laning from Raigiri to Warangal is proposed to be taken up as Phase-II. Even the original stretches of highway that were bypassed is 4-laned except for short stretches.
Raw File: image_5 (Picmarkr).IMAG9275.25022015
Buses servicing Koti Bus Terminal near Andhra Bank. The frequency of few bus routes such as 222 has increased after the introduction of AC Volvo Metro Luxury buses.
Raw File: image_9 (Picmarkr).IMAG9020.16012015
Building No. 10 (Titus) in Mindspace (K. Raheja) IT Park, HITEC City, Hyderabad. It includes the offices of Verizon, Qualcomm, Isoft Solution Centre and ICICI bank branch.
Raw File: image_9 (Picmarkr).IMAG9146.10022015
NH 163 (Old NH 202), Bhopalapatnam-Warangal-Hyderabad highway. This pics are after toll plaza approaching Hyderabad.
There are few bypass roads built as part of phase-I four-laning from Annojiguda (near Ghatkesar) to Raigir (after Bhongir near Yadagirigutta)-{Old 2011 The Hindu article: Four-laning going on at brisk pace, www.thehindu.com/todays-paper/tp-national/tp-andhraprades...}. The bypass stretches are at Ghatkesar (from ORR Annojiguda junction), Aushapur and Bhongir (Bhuvangiri or Bhongiri). The 4-laning from Raigiri to Warangal is proposed to be taken up as Phase-II. Even the original stretches of highway that were bypassed is 4-laned except for short stretches.
Raw File: image_2 (Picmarkr).IMAG9271 (edited).25022015
New road under construction near Madhapur to connect to Durgam Cheruvu.
Raw File: image_24 (Picmarkr).IMAG9161.10022015
TSRTC Hyderabad's Volvo 8400 City Metro Luxury Bus (AC) running in the route of 17H/10W (Waverock to ECIL 'X' Roads) of Hyderabad Central University (HCU) depot at Uppal bus stand on St.Johns/Rezimental Bazar Main Road in Secunderabad.
Raw File: image_4 (Watermark Factory).DSC00395.23042015
HITEC City to Inorbit Mall Road. My Home Abhra residential towers can be seen on the right.
Raw File: image_15 (Picmarkr).IMAG9152.10022015
NH 163 (Old NH 202), Bhopalapatnam-Warangal-Hyderabad highway. This pics are after toll plaza approaching Hyderabad.
There are few bypass roads built as part of phase-I four-laning from Annojiguda (near Ghatkesar) to Raigir (after Bhongir near Yadagirigutta)-{Old 2011 The Hindu article: Four-laning going on at brisk pace, www.thehindu.com/todays-paper/tp-national/tp-andhraprades...}. The bypass stretches are at Ghatkesar (from ORR Annojiguda junction), Aushapur and Bhongir (Bhuvangiri or Bhongiri). The 4-laning from Raigiri to Warangal is proposed to be taken up as Phase-II. Even the original stretches of highway that were bypassed is 4-laned except for short stretches.
Raw File: image_3 (Picmarkr).IMAG9273.25022015