View allAll Photos Tagged tsrtc

New Volvo 8400 low-floor A/C buses of TSRTC Hyderabad at Cyber Towers junction in HITEC-City. This bus route number is 222 of Miyapur-2 depot.

 

Raw File: image_58 (Picmarkr).IMAG8856.20122014

New building under construction in Mindspace (K. Raheja) IT Park in HITEC City, Hyderabad.

 

Raw File: image_45 (Picmarkr).IMAG9136.09022015

Continental Hospitals under-construction at Nanakramguda Financial district near Gachibowli, Hyderabad.

 

Raw File: image_1 (Picmarkr).IMAG9049.09022015

Mindspace (K. Raheja) IT Park in HITEC City, Hyderabad.

 

Raw File: image_1 (Picmarkr).IMAG9138.10022015

Telangana State Road Transport Corporation TSRTC (Old APSRTC-Andhra Pradesh State Road Transport Corporation) Metro Deluxe bus at ECIL commuter ammenity centre (CAC), part of modern bus stands replacing the older bus stands in major areas of Hyderabad.

 

Raw File: image_6 (Picmarkr).IMAG8172.17092014

TSRTC's AC seater, Rajadhani of Siddipet depot parked at Peenya.

K. Raheja Mindspace IT Park in HITEC City, Hyderabad.

 

Raw File: image_4 (Picmarkr).IMAG9141.10022015

NH 163 (Old NH 202), Bhopalapatnam-Warangal-Hyderabad highway.

 

There are few bypass roads built as part of phase-I four-laning from Annojiguda (near Ghatkesar) to Raigir (after Bhongir near Yadagirigutta)-{Old 2011 The Hindu article: Four-laning going on at brisk pace, www.thehindu.com/todays-paper/tp-national/tp-andhraprades...}. The bypass stretches are at Ghatkesar (from ORR Annojiguda junction), Aushapur and Bhongir (Bhuvangiri or Bhongiri). The 4-laning from Raigiri to Warangal is proposed to be taken up as Phase-II. Even the original stretches of highway that were bypassed is 4-laned except for short stretches.

 

Raw File: image_1 (Picmarkr).IMAG9265 (edited).25022015

Time table of bus route no. 222 at Koti bus terminal. This bus is a new Volvo 8400 AC bus of Musheerabad-2 depot operating from Koti to Patancheru and return back to Koti. The frequency of this bus is 10 minutes.

 

One of the buses at the Koti commuter ammenity centre-

www.flickr.com/photos/world8115/16294249915/

 

Raw File: image_10 (Picmarkr).IMAG9021.16012015

Building No. 10 (Titus) in Mindspace (K. Raheja) IT Park, HITEC City, Hyderabad. It includes the offices of Verizon, Qualcomm, Isoft Solution Centre and ICICI bank branch.

 

Raw File: image_8 (Picmarkr).IMAG9145.10022015

TSRTC Hyderabad's new Volvo 8400 City Metro Luxury Bus running in the route of 17H/10H (ECIL 'X' Roads to Kondapur) of Hyderabad Central University (HCU) depot at Uppal bus stand on St.Johns/Rezimental Bazar Main Road in Secunderabad. In the background you can see the demolition and re-construction of buildings for road widening, part of Hyderabad Metro Rail works for Stage-IV (Mettuguda-Begumpet), part of Nagole-Shilparamam line (Line 3) in Phase-I of the project.

 

Raw File: image_58 (Picmarkr).IMAG8861.20122014

New Volvo 8400 low-floor A/C buses of TSRTC Hyderabad at Cyber Towers junction in HITEC-City.

 

Raw File: image_57 (Picmarkr).IMAG8855.20122014

My Home Abhra residential towers on HITEC City (Mindspace) to Inorbit Mall Road.

 

Raw File: image_14 (Picmarkr).IMAG9151.10022015

Fortune Towers & Aspire (Raasi Associates)

 

Raw File: image_22 (Picmarkr).IMAG9159.10022015

NH 163 (Old NH 202), Bhopalapatnam-Warangal-Hyderabad highway. This pics are after toll plaza approaching Hyderabad.

 

There are few bypass roads built as part of phase-I four-laning from Annojiguda (near Ghatkesar) to Raigir (after Bhongir near Yadagirigutta)-{Old 2011 The Hindu article: Four-laning going on at brisk pace, www.thehindu.com/todays-paper/tp-national/tp-andhraprades...}. The bypass stretches are at Ghatkesar (from ORR Annojiguda junction), Aushapur and Bhongir (Bhuvangiri or Bhongiri). The 4-laning from Raigiri to Warangal is proposed to be taken up as Phase-II. Even the original stretches of highway that were bypassed is 4-laned except for short stretches.

 

Raw File: image_6 (Picmarkr).IMAG9282.25022015

CSC (Building No. 7) in Mindspace (K. Raheja) IT Park, HITEC City, Hyderabad. Seen behind it is Building No. 8 which has offices of Oracle India and Qualcomm.

 

Raw File: image_7 (Picmarkr).IMAG9144.10022015

HITEC City to Inorbit Mall Road. My Home Abhra residential towers can be seen on the right.

 

Raw File: image_12 (Picmarkr).IMAG9149.10022015

A TSRTC Super Luxury of Zaheerabad arriving at Bangalore..

TSRTC Hyderabad's new Volvo 8400 City Metro Luxury Bus running in the route of 17H/10H (ECIL 'X' Roads to Kondapur) of Hyderabad Central University (HCU) depot at Uppal bus stand on St.Johns/Rezimental Bazar Main Road in Secunderabad. In the background you can see the demolition and re-construction of buildings for road widening, part of Hyderabad Metro Rail works for Stage-III (Mettuguda-Begumpet), part of Nagole-Shilparamam/Raidurg line (Line 3) in Phase-I of the project.

 

Raw File: image_71 (Picmarkr).IMAG8863.20122014

TSRTC Hyderabad's new Volvo 8400 City Metro Luxury Bus running in the route of 17H/10H (ECIL 'X' Roads to Kondapur) of Hyderabad Central University (HCU) depot at Uppal bus stand on St.Johns/Rezimental Bazar Main Road in Secunderabad. In the background you can see the demolition and re-construction of buildings for road widening, part of Hyderabad Metro Rail works for Stage-III (Mettuguda-Begumpet), part of Nagole-Shilparamam/Raidurg line (Line 3) in Phase-I of the project.

 

Raw File: image_70 (Picmarkr).IMAG8862.20122014

Satva Technology Park, IT office tower by Sattva Group on Mindspace (HITEC City)-Inorbit Mall Road.

 

Raw File: image_11 (Picmarkr).IMAG9148.10022015

The V-Ascendas IT Park

 

Raw File: image_13 (Picmarkr).IMAG9150.10022015

Hyderabad ORR Annojiguda junction intersection with NH 163 (Old NH 202), Bhopalapatnam-Warangal-Hyderabad highway. This pics are after toll plaza approaching Hyderabad.

 

There are few bypass roads built as part of phase-I four-laning from Annojiguda (near Ghatkesar) to Raigir (after Bhongir near Yadagirigutta)-{Old 2011 The Hindu article: Four-laning going on at brisk pace, www.thehindu.com/todays-paper/tp-national/tp-andhraprades...}. The bypass stretches are at Ghatkesar (from ORR Annojiguda junction), Aushapur and Bhongir (Bhuvangiri or Bhongiri). The 4-laning from Raigiri to Warangal is proposed to be taken up as Phase-II. Even the original stretches of highway that were bypassed is 4-laned except for short stretches.

 

Raw File: image_7 (Picmarkr).IMAG9285 (edited).25022015

HITEC City to Inorbit Mall Road. Satva Technology Park and My Home Abhra residetial towers can be seen in the distance.

 

Raw File: image_10 (Picmarkr).IMAG9147.10022015

NH 163 (Old NH 202), Bhopalapatnam-Warangal-Hyderabad highway. This pics are after toll plaza approaching Hyderabad.

 

There are few bypass roads built as part of phase-I four-laning from Annojiguda (near Ghatkesar) to Raigir (after Bhongir near Yadagirigutta)-{Old 2011 The Hindu article: Four-laning going on at brisk pace, www.thehindu.com/todays-paper/tp-national/tp-andhraprades...}. The bypass stretches are at Ghatkesar (from ORR Annojiguda junction), Aushapur and Bhongir (Bhuvangiri or Bhongiri). The 4-laning from Raigiri to Warangal is proposed to be taken up as Phase-II. Even the original stretches of highway that were bypassed is 4-laned except for short stretches.

 

Raw File: image_5 (Picmarkr).IMAG9275.25022015

Buses servicing Koti Bus Terminal near Andhra Bank. The frequency of few bus routes such as 222 has increased after the introduction of AC Volvo Metro Luxury buses.

 

Raw File: image_9 (Picmarkr).IMAG9020.16012015

Building No. 10 (Titus) in Mindspace (K. Raheja) IT Park, HITEC City, Hyderabad. It includes the offices of Verizon, Qualcomm, Isoft Solution Centre and ICICI bank branch.

 

Raw File: image_9 (Picmarkr).IMAG9146.10022015

NH 163 (Old NH 202), Bhopalapatnam-Warangal-Hyderabad highway. This pics are after toll plaza approaching Hyderabad.

 

There are few bypass roads built as part of phase-I four-laning from Annojiguda (near Ghatkesar) to Raigir (after Bhongir near Yadagirigutta)-{Old 2011 The Hindu article: Four-laning going on at brisk pace, www.thehindu.com/todays-paper/tp-national/tp-andhraprades...}. The bypass stretches are at Ghatkesar (from ORR Annojiguda junction), Aushapur and Bhongir (Bhuvangiri or Bhongiri). The 4-laning from Raigiri to Warangal is proposed to be taken up as Phase-II. Even the original stretches of highway that were bypassed is 4-laned except for short stretches.

 

Raw File: image_2 (Picmarkr).IMAG9271 (edited).25022015

New road under construction near Madhapur to connect to Durgam Cheruvu.

 

Raw File: image_24 (Picmarkr).IMAG9161.10022015

TSRTC bus double decker BUS design APSRTC

#akromolo

 

TSRTC Hyderabad's Volvo 8400 City Metro Luxury Bus (AC) running in the route of 17H/10W (Waverock to ECIL 'X' Roads) of Hyderabad Central University (HCU) depot at Uppal bus stand on St.Johns/Rezimental Bazar Main Road in Secunderabad.

 

Raw File: image_4 (Watermark Factory).DSC00395.23042015

HITEC City to Inorbit Mall Road. My Home Abhra residential towers can be seen on the right.

 

Raw File: image_15 (Picmarkr).IMAG9152.10022015

NH 163 (Old NH 202), Bhopalapatnam-Warangal-Hyderabad highway. This pics are after toll plaza approaching Hyderabad.

 

There are few bypass roads built as part of phase-I four-laning from Annojiguda (near Ghatkesar) to Raigir (after Bhongir near Yadagirigutta)-{Old 2011 The Hindu article: Four-laning going on at brisk pace, www.thehindu.com/todays-paper/tp-national/tp-andhraprades...}. The bypass stretches are at Ghatkesar (from ORR Annojiguda junction), Aushapur and Bhongir (Bhuvangiri or Bhongiri). The 4-laning from Raigiri to Warangal is proposed to be taken up as Phase-II. Even the original stretches of highway that were bypassed is 4-laned except for short stretches.

 

Raw File: image_3 (Picmarkr).IMAG9273.25022015

The V-Ascendas IT Park

 

Raw File: image_17 (Picmarkr).IMAG9154.10022015

1 2 4 6 7 ••• 24 25