BTS Train Model Project

CEA were employed to receive, transport and unload three 40ft HC containers form Japan. Each container contained parts of a full scale wooden model of a Bangkok Mass Transit System (BTS) car. The model was to be put on display at the BTS Headquarters in Bangkok.

CEA received the containers at Laem Chabang port and facilitated all the necessary customs paperwork. The containers were loaded on to flatbed trailers and transported to the BTS site in Bangkok.

A 55 t mobile crane, a 3.5 t Forklift, a 5 t Telehandler and Hiab truck also made the journey to Bangkok as these would be used for unloading and unstuffing the containers.

Upon arrival in Bangkok CEA began the unloading and unstuffing procedure. The parts were moved to a purpose built display area for erection.

CEA assisted in the erection of the model alongside a specialised design team from Japan. After the model was complete CEA demobilized all the equipment and returned to Laem Chabang.

Equipment Used

55 t Mobile crane

5 t Telehandler

3.5 t Forklift

Hiab Truck

Isuzu DECA 360 Prime movers

Flatbed trailers

 

BTS Train Model Project

CEA were employed to receive, transport and unload three 40ft HC containers form Japan. Each container contained parts of a full scale wooden model of a Bangkok Mass Transit System (BTS) car. The model was to be put on display at the BTS Headquarters in Bangkok.

CEA received the containers at Laem Chabang port and facilitated all the necessary customs paperwork. The containers were loaded on to flatbed trailers and transported to the BTS site in Bangkok.

A 55 t mobile crane, a 3.5 t Forklift, a 5 t Telehandler and Hiab truck also made the journey to Bangkok as these would be used for unloading and unstuffing the containers.

Upon arrival in Bangkok CEA began the unloading and unstuffing procedure. The parts were moved to a purpose built display area for erection.

CEA assisted in the erection of the model alongside a specialised design team from Japan. After the model was complete CEA demobilized all the equipment and returned to Laem Chabang.

Equipment Used

55 t Mobile crane

5 t Telehandler

3.5 t Forklift

Hiab Truck

Isuzu DECA 360 Prime movers

Flatbed trailers

 

FORK RENT JCB 535-140

TELEHANDLER

BTS Train Model Project

CEA were employed to receive, transport and unload three 40ft HC containers form Japan. Each container contained parts of a full scale wooden model of a Bangkok Mass Transit System (BTS) car. The model was to be put on display at the BTS Headquarters in Bangkok.

CEA received the containers at Laem Chabang port and facilitated all the necessary customs paperwork. The containers were loaded on to flatbed trailers and transported to the BTS site in Bangkok.

A 55 t mobile crane, a 3.5 t Forklift, a 5 t Telehandler and Hiab truck also made the journey to Bangkok as these would be used for unloading and unstuffing the containers.

Upon arrival in Bangkok CEA began the unloading and unstuffing procedure. The parts were moved to a purpose built display area for erection.

CEA assisted in the erection of the model alongside a specialised design team from Japan. After the model was complete CEA demobilized all the equipment and returned to Laem Chabang.

Equipment Used

55 t Mobile crane

5 t Telehandler

3.5 t Forklift

Hiab Truck

Isuzu DECA 360 Prime movers

Flatbed trailers

 

Description

Model: MMT80-W

Specs:

1.) Hydraulic controling, hydr. flow is 12.6GPM

2.) Tipping capacity: 794kgs

3.) Weight (with out bucket): 856kgs / 1887lbs

4.) Engine: Kohler, command pro. Gasoline engine original Honda engine, gasoline type (but the Honda engine delivery time is 3 months, we advise KOHLER engine..)

5.) Dimensions (with bucket): 2235mm(L)*1080mm(W)*1245mm(H) (its not under operating situations).

Many kinds of attachments optional

We are professional SKid Steer Loader,Track Loader,Wheel Loader,Backhoe Loader,Telehandler manufacturers and factory.We can produce SKid Steer Loader,Track Loader,Wheel Loader,Backhoe Loader,Telehandler according to your requirements.More types of SKid Steer Loader,Track Loader,Wheel Loader,Backhoe Loader,Telehandler wanted,please contact us right now!

 

www.wolverineloader.com

BTS Train Model Project

CEA were employed to receive, transport and unload three 40ft HC containers form Japan. Each container contained parts of a full scale wooden model of a Bangkok Mass Transit System (BTS) car. The model was to be put on display at the BTS Headquarters in Bangkok.

CEA received the containers at Laem Chabang port and facilitated all the necessary customs paperwork. The containers were loaded on to flatbed trailers and transported to the BTS site in Bangkok.

A 55 t mobile crane, a 3.5 t Forklift, a 5 t Telehandler and Hiab truck also made the journey to Bangkok as these would be used for unloading and unstuffing the containers.

Upon arrival in Bangkok CEA began the unloading and unstuffing procedure. The parts were moved to a purpose built display area for erection.

CEA assisted in the erection of the model alongside a specialised design team from Japan. After the model was complete CEA demobilized all the equipment and returned to Laem Chabang.

Equipment Used

55 t Mobile crane

5 t Telehandler

3.5 t Forklift

Hiab Truck

Isuzu DECA 360 Prime movers

Flatbed trailers

 

BTS Train Model Project

CEA were employed to receive, transport and unload three 40ft HC containers form Japan. Each container contained parts of a full scale wooden model of a Bangkok Mass Transit System (BTS) car. The model was to be put on display at the BTS Headquarters in Bangkok.

CEA received the containers at Laem Chabang port and facilitated all the necessary customs paperwork. The containers were loaded on to flatbed trailers and transported to the BTS site in Bangkok.

A 55 t mobile crane, a 3.5 t Forklift, a 5 t Telehandler and Hiab truck also made the journey to Bangkok as these would be used for unloading and unstuffing the containers.

Upon arrival in Bangkok CEA began the unloading and unstuffing procedure. The parts were moved to a purpose built display area for erection.

CEA assisted in the erection of the model alongside a specialised design team from Japan. After the model was complete CEA demobilized all the equipment and returned to Laem Chabang.

Equipment Used

55 t Mobile crane

5 t Telehandler

3.5 t Forklift

Hiab Truck

Isuzu DECA 360 Prime movers

Flatbed trailers

 

BTS Train Model Project

CEA were employed to receive, transport and unload three 40ft HC containers form Japan. Each container contained parts of a full scale wooden model of a Bangkok Mass Transit System (BTS) car. The model was to be put on display at the BTS Headquarters in Bangkok.

CEA received the containers at Laem Chabang port and facilitated all the necessary customs paperwork. The containers were loaded on to flatbed trailers and transported to the BTS site in Bangkok.

A 55 t mobile crane, a 3.5 t Forklift, a 5 t Telehandler and Hiab truck also made the journey to Bangkok as these would be used for unloading and unstuffing the containers.

Upon arrival in Bangkok CEA began the unloading and unstuffing procedure. The parts were moved to a purpose built display area for erection.

CEA assisted in the erection of the model alongside a specialised design team from Japan. After the model was complete CEA demobilized all the equipment and returned to Laem Chabang.

Equipment Used

55 t Mobile crane

5 t Telehandler

3.5 t Forklift

Hiab Truck

Isuzu DECA 360 Prime movers

Flatbed trailers

 

BTS Train Model Project

CEA were employed to receive, transport and unload three 40ft HC containers form Japan. Each container contained parts of a full scale wooden model of a Bangkok Mass Transit System (BTS) car. The model was to be put on display at the BTS Headquarters in Bangkok.

CEA received the containers at Laem Chabang port and facilitated all the necessary customs paperwork. The containers were loaded on to flatbed trailers and transported to the BTS site in Bangkok.

A 55 t mobile crane, a 3.5 t Forklift, a 5 t Telehandler and Hiab truck also made the journey to Bangkok as these would be used for unloading and unstuffing the containers.

Upon arrival in Bangkok CEA began the unloading and unstuffing procedure. The parts were moved to a purpose built display area for erection.

CEA assisted in the erection of the model alongside a specialised design team from Japan. After the model was complete CEA demobilized all the equipment and returned to Laem Chabang.

Equipment Used

55 t Mobile crane

5 t Telehandler

3.5 t Forklift

Hiab Truck

Isuzu DECA 360 Prime movers

Flatbed trailers

 

LEGO 42061 Telehandler

Technic 2017

Rails being moved by Telehandler, not an easy manoeuvre. Later the job was made much easier with the arrival of Stevie in his JCB.

 

Summer 2015.

BTS Train Model Project

CEA were employed to receive, transport and unload three 40ft HC containers form Japan. Each container contained parts of a full scale wooden model of a Bangkok Mass Transit System (BTS) car. The model was to be put on display at the BTS Headquarters in Bangkok.

CEA received the containers at Laem Chabang port and facilitated all the necessary customs paperwork. The containers were loaded on to flatbed trailers and transported to the BTS site in Bangkok.

A 55 t mobile crane, a 3.5 t Forklift, a 5 t Telehandler and Hiab truck also made the journey to Bangkok as these would be used for unloading and unstuffing the containers.

Upon arrival in Bangkok CEA began the unloading and unstuffing procedure. The parts were moved to a purpose built display area for erection.

CEA assisted in the erection of the model alongside a specialised design team from Japan. After the model was complete CEA demobilized all the equipment and returned to Laem Chabang.

Equipment Used

55 t Mobile crane

5 t Telehandler

3.5 t Forklift

Hiab Truck

Isuzu DECA 360 Prime movers

Flatbed trailers

 