View allAll Photos Tagged studwall

Monday 18th February

12/12/11

Ensuite... slowly coming together

27th March 2013. Spare room, with bed!

 

Thursday 28th February

15th March 2013

A bundle of external wall cassettes and internal studwalls are lifted high over the scaffolding and up onto the first floor ready to be positioned.

View from the outside, through the basement family room window, at the 2"x6" stud wall which separates the exercise room from the family room, and bears load. The orange folding ladders beyond are roughly situated in the mechanical room, under the staircase.

Wednesday 13th February (pm)

Tuesday 5th March

1st floor stud walls stacked and ready to stand up.

I plumbed in the new shower faucet and replaced the weird studwall that was holding the old one before putting in the greenboard wall on the sink side and starting to tape and spackle the room.

15/11/11 - My first plasterboard effort.

Tuesday 19th February

Thursday 28th February

Friday 8th March

27th March 2013. Main bedroom.

 

20th March 2013. Main bedroom, fully plastered.

Tuesday 19th February

Tuesday 5th March

13th March 2013

Friday 1st February 2013

Monday 25th February

15th March 2013

The wall: exterior sheathing, scale plywood, studwall, pink foam insulation in the wall between the studs, interior drywall, baseboard. The floor is made up of individual floor planks laid atop plywood set over floor joists.

Tuesday 5th February 2013

Monday 18th February

20th March 2013. Main bedroom, fully plastered.

Thursday 7th February 2013

Monday 11th March

13th March 2013

Wednesday 27th February

Monday 11th February

21st March 2013. Spare bedroom, almost done.

16/11/11

Breaking through (ensuite/bedroom)

Friday 8th March

Built & installed flats, triscuits, raked studwalls, trim, stair railing.

Built & installed studwalls, triscuits, and masking flats. Cleaned, cut, and drilled steel.

16/11/11

Doorway! (to the ensuite)

Built & installed flats, triscuits, raked studwalls, trim, stair railing.

Built back wall, installed flats, studwalls & deck.

Monday 4th March

Built & installed studwalls, triscuits, planking, flats, fireplace, banisters, window, and molding.

Monday 4th March

1 2 3 5 7 ••• 9 10