View allAll Photos Tagged sitework

Granada Village Shopping Center Redevelopment (Building A3 & A4 Facade Construction - 2012-01-25) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Rite Aid Interior Construction - 2011-09-08) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Building C1 HomeGoods Facade Construction - 2012-01-27) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Building A1 - TJ Maxx Facade Construction - 2011-11-08) - Granada Hills, CA. Urban One www.urbanone.com.

Refurbishment of the existing church and bell-tower together with repairs and alterations to boundary walls together with associated siteworks.

 

Full QS service, traditional procurement. The challenge for this project was to meet the strict budget. We provided a cost plan to guide the design, regular cost checks to control cost during design development, a Bills of Quantities and careful monitoring to control cost during construction; contract and tender documentation for main works; regular predictive cost reports.

 

Granada Village Shopping Center Redevelopment (Phase 2 Sitework Infiltration Basin - 2011-06-30) - Granada Hills, CA. Urban One www.urbanone.com.

mcad.edu Jake Dwyer, one of the students who worked on the mural.

 

Photograph ©Erin Nicole Johnson for the Minneapolis College of Art and Design

Granada Village Shopping Center Redevelopment (Pad L Facade Construction - 2012-03-06) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (HomeGoods Interior Demolition - 2011-10-06) - Granada Hills, CA. Urban One www.urbanone.com.

2022 Southland Transport Invercargill Trucking Parade [Labour Weekend Sunday 23rd October] South Island, New Zealand.

 

Photographer: Leighton Smith.

 

Trenholm State Community College is currently in the process of architecturally re-branding their Patterson Campus. Trenholm State Community College’s Automotive Collision Repair Program was moved from the Trenholm Campus to the Patterson Campus, and in doing so, will utilize an existing 18,727sf metal building/warehouse which was conducive for the collision repair area. Additional square footage was added to the building to encompass two classrooms, a resource room, offices, tool storage, and a paint shop. The paint shop consists of two new pre-fabricated paint booths, mixing station, and prep area A new façade was developed to enhance the overall appearance of the building. This building is the first of many to feature the new architectural style.

Trenholm State Community College’s Administration and Financial Aid Building project included a new metal retrofit roof and the renovation of an existing building that houses administration offices, financial aid and other student amenities as part of there “Student Success” center to allow for additional classrooms. The existing spaces were updated with new finishes and associated energy efficient mechanical, electrical, and plumbing work. A new entrance and sitework were designed to give a good first impression to students and administrators entering campus.

Trenholm State Community College purchased state of the art prefabricated welding booths for their welding program. However, the buildings electrical system could not accommodate the loads for the booths. Goodwyn, Mills and Cawood was hired to prepare the architecture and engineering drawings to allow the program to use their new welding stations.

Building B & Building D were renovations that include interior and exterior work, re-roofing, structural, mechanical, electrical, civil, site work, exterior lighting, new streets, repairs and alterations to existing streets and parking lots, landscaping, and sidewalks.

 

Granada Village Shopping Center Redevelopment (Pad L Facade Construction - 2012-02-24) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Building A2 Facade Construction - 2012-02-29) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Pad L Facade Construction - 2011-11-03) - Granada Hills, CA. Urban One www.urbanone.com.

Refurbishment of existing church, bell tower, extension of toilet and boiler room together with associated siteworks.

 

Full QS service, traditional procurement. The challenge for this project was to meet the strict budget. We provided a cost plan to guide the design, regular cost checks to control cost during design development, a Bills of Quantities and careful monitoring to control cost during construction; contract and tender documentation for main works; regular predictive cost reports.

 

Granada Village Shopping Center Redevelopment (Building A1 TJ Maxx Facade Construction - 2011-11-21) - Granada Hills, CA. Urban One www.urbanone.com.

Siteworks had 3 guys grading and spreading stone.

 

2] Siteworks had 5 guys setting water quality box.

 

3] M&J had 5 guys working on conduit install.

 

4] Mecklenburgh plumbing had 4 guys working on floor sinks and main water line install.

 

5] Doster had 6 guys hanging FRP and plywood and blocking.2guys finishing.

 

6] Tino tile had 2 guys working on wall tile around cooler.

 

7] McGee brothers had 5 guys working on side entry knee wall.

 

8] ACS had A delivery of dowel baskets.

 

Week in reveiw

 

1] Acs has A good start on curb.

 

2] Stone has been placed around building.

 

3] Floor tile is 80% wall tile is underway.

 

4] M&J running conduit homeruns.

 

5] Storefront install is underway.

 

6] Drywall, FRP & plywood is well underway.

 

7] Completion of canopy colum masonary is complete as well the dumpster walls. Knee wall is 95%.Awaiting row lock brick.

 

8] Canopy rework complete.

 

2 week look ahead.

 

1] Storefront will be complete.

 

2] Paint and Frp will be complete as well framing will be done.

 

3] Curb and sidewalks will be well under way.

 

4] Fuel lines will begin 2-27-2012 with new sub.

 

5] tile completion interior.

 

6] Millwork begins 2-8-2012

 

7] interior waterline insulation.

 

8] Bathroom drywall and tile should be complete.

 

9] cooler glass door to be installed.

Building 1

Wood Framing installation is complete.

Roof Trusses are moving forward at the Northside.

Mechanical, Electrical, Plumbing rough-in is underway on the 3rd and 4th floors.

Shingle and Flat Roof Installation is underway and 35% complete.

Building weather wrap is being installed and 40% complete.

Courtyard waterproofing prep is underway.

 

Building 2

Wood Framing installation is complete.

Roof Trusses are complete, and roof sheathing is moving forward and in progress on 85% of the building.

Mechanical, Electrical, Plumbing, and Fire Sprinkler rough-in is complete at the 2nd floor and progressing up to the 3rd floor.

Shingle and Flat Roof Installation is underway and 65% complete.

Building weather wrap is being installed and 30% complete.

 

Building 3

Underground Rough is 100% complete

The slab is poured and waiting for wood framing to commence.

 

Building 4

Foundation is 1000% complete

Elevator shaft construction is complete

Underground Plumbing Rough is 25% complete

Underground Electrical Rough is 50% complete

 

Building 5

Foundation, underground utilities, and the slab is complete.

Progress pending framing start forecasted to for October 2018.

 

Building 6

Siding is complete.

Insulation is complete

Drywall installation is underway and 50% complete.

Site curbs are being installed

 

Sitework

Curb formwork and installation has started on Mill Road

Setting building site to final subgrade

Pump station Wet Well foundation walls are poured, and the wall formwork for the balance of building is 25% complete

Granada Village Shopping Center Redevelopment (Pad L Interior Construction - 2012-02-28) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Building A1 - TJ Maxx Facade Construction - 2011-11-03) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Building A2 Pick Up Stix Patio Construction - 2012-02-28) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (HomeGoods Interior Construction - 2012-02-28) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Building A2 Pick Up Stix Patio Construction - 2012-01-30) - Granada Hills, CA. Urban One www.urbanone.com.

The sitework includes a new helicopter landing pad on the south side of the building. When the new Emergency Center in the South Pavilion opens late fall, the helipad near the current Emergency Center off of Levan Road will be closed.

2022 Southland Transport Invercargill Trucking Parade [Labour Weekend Sunday 23rd October] South Island, New Zealand.

 

Photographer: Leighton Smith.

 

Granada Village Shopping Center Redevelopment (Pad L Interior Construction - 2012-02-28) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Rite Aid Trash Enclosure Footing Excavation - 2011-09-01) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Building A2 Pick Up Stix Patio Construction - 2012-01-27) - Granada Hills, CA. Urban One www.urbanone.com.

Building 1

Wood Framing installation is complete.

Roof Trusses are moving forward at the Northside.

Mechanical, Electrical, Plumbing rough-in is underway on the 3rd and 4th floors.

Shingle and Flat Roof Installation is underway and 35% complete.

Building weather wrap is being installed and 40% complete.

Courtyard waterproofing prep is underway.

 

Building 2

Wood Framing installation is complete.

Roof Trusses are complete, and roof sheathing is moving forward and in progress on 85% of the building.

Mechanical, Electrical, Plumbing, and Fire Sprinkler rough-in is complete at the 2nd floor and progressing up to the 3rd floor.

Shingle and Flat Roof Installation is underway and 65% complete.

Building weather wrap is being installed and 30% complete.

 

Building 3

Underground Rough is 100% complete

The slab is poured and waiting for wood framing to commence.

 

Building 4

Foundation is 1000% complete

Elevator shaft construction is complete

Underground Plumbing Rough is 25% complete

Underground Electrical Rough is 50% complete

 

Building 5

Foundation, underground utilities, and the slab is complete.

Progress pending framing start forecasted to for October 2018.

 

Building 6

Siding is complete.

Insulation is complete

Drywall installation is underway and 50% complete.

Site curbs are being installed

 

Sitework

Curb formwork and installation has started on Mill Road

Setting building site to final subgrade

Pump station Wet Well foundation walls are poured, and the wall formwork for the balance of building is 25% complete

Siteworks had 3 guys grading and spreading stone.

 

2] Siteworks had 5 guys setting water quality box.

 

3] M&J had 5 guys working on conduit install.

 

4] Mecklenburgh plumbing had 4 guys working on floor sinks and main water line install.

 

5] Doster had 6 guys hanging FRP and plywood and blocking.2guys finishing.

 

6] Tino tile had 2 guys working on wall tile around cooler.

 

7] McGee brothers had 5 guys working on side entry knee wall.

 

8] ACS had A delivery of dowel baskets.

 

Week in reveiw

 

1] Acs has A good start on curb.

 

2] Stone has been placed around building.

 

3] Floor tile is 80% wall tile is underway.

 

4] M&J running conduit homeruns.

 

5] Storefront install is underway.

 

6] Drywall, FRP & plywood is well underway.

 

7] Completion of canopy colum masonary is complete as well the dumpster walls. Knee wall is 95%.Awaiting row lock brick.

 

8] Canopy rework complete.

 

2 week look ahead.

 

1] Storefront will be complete.

 

2] Paint and Frp will be complete as well framing will be done.

 

3] Curb and sidewalks will be well under way.

 

4] Fuel lines will begin 2-27-2012 with new sub.

 

5] tile completion interior.

 

6] Millwork begins 2-8-2012

 

7] interior waterline insulation.

 

8] Bathroom drywall and tile should be complete.

 

9] cooler glass door to be installed.

Granada Village Shopping Center Redevelopment (Pad L Interior Construction - 2012-02-09) - Granada Hills, CA. Urban One www.urbanone.com.

Scanned 35 mm color slide film from a clear top plastic box (Clear Top Box 03) with no label - Massachusetts Department of Environmental Protection -(MassDEP) / Department of Environmental Quality Engineering (DEQE) - site with an above ground tank and a smokestack

Granada Village Shopping Center Redevelopment (Phase 2 Sitework Construction - 2012-03-06) - Granada Hills, CA. Urban One www.urbanone.com.

Trenholm State Community College is currently in the process of architecturally re-branding their Patterson Campus. Trenholm State Community College’s Automotive Collision Repair Program was moved from the Trenholm Campus to the Patterson Campus, and in doing so, will utilize an existing 18,727sf metal building/warehouse which was conducive for the collision repair area. Additional square footage was added to the building to encompass two classrooms, a resource room, offices, tool storage, and a paint shop. The paint shop consists of two new pre-fabricated paint booths, mixing station, and prep area A new façade was developed to enhance the overall appearance of the building. This building is the first of many to feature the new architectural style.

Trenholm State Community College’s Administration and Financial Aid Building project included a new metal retrofit roof and the renovation of an existing building that houses administration offices, financial aid and other student amenities as part of there “Student Success” center to allow for additional classrooms. The existing spaces were updated with new finishes and associated energy efficient mechanical, electrical, and plumbing work. A new entrance and sitework were designed to give a good first impression to students and administrators entering campus.

Trenholm State Community College purchased state of the art prefabricated welding booths for their welding program. However, the buildings electrical system could not accommodate the loads for the booths. Goodwyn, Mills and Cawood was hired to prepare the architecture and engineering drawings to allow the program to use their new welding stations.

Building B & Building D were renovations that include interior and exterior work, re-roofing, structural, mechanical, electrical, civil, site work, exterior lighting, new streets, repairs and alterations to existing streets and parking lots, landscaping, and sidewalks.

 

Granada Village Shopping Center Redevelopment (Building A2 Pick Up Stix Patio Construction - 2012-01-24) - Granada Hills, CA. Urban One www.urbanone.com.

Brisbane Transit Centre Demolition - Early Site Works, Cross River Rail Project, Roma Street, Brisbane CBD

by Curtis Hale

Oil on panel

11" x 18"

$1,250

Photo by Jeb Wallace-Brodeur

Granada Village Shopping Center Redevelopment (Phase 1 Pervious Pavers Sitework Construction - 2011-07-14) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Phase 1 Pervious Pavers Sitework Construction - 2011-07-14) - Granada Hills, CA. Urban One www.urbanone.com.

2022 Southland Transport Invercargill Trucking Parade [Labour Weekend Sunday 23rd October] South Island, New Zealand.

 

Photographer: Leighton Smith.

 

Trenholm State Community College is currently in the process of architecturally re-branding their Patterson Campus. Trenholm State Community College’s Automotive Collision Repair Program was moved from the Trenholm Campus to the Patterson Campus, and in doing so, will utilize an existing 18,727sf metal building/warehouse which was conducive for the collision repair area. Additional square footage was added to the building to encompass two classrooms, a resource room, offices, tool storage, and a paint shop. The paint shop consists of two new pre-fabricated paint booths, mixing station, and prep area A new façade was developed to enhance the overall appearance of the building. This building is the first of many to feature the new architectural style.

Trenholm State Community College’s Administration and Financial Aid Building project included a new metal retrofit roof and the renovation of an existing building that houses administration offices, financial aid and other student amenities as part of there “Student Success” center to allow for additional classrooms. The existing spaces were updated with new finishes and associated energy efficient mechanical, electrical, and plumbing work. A new entrance and sitework were designed to give a good first impression to students and administrators entering campus.

Trenholm State Community College purchased state of the art prefabricated welding booths for their welding program. However, the buildings electrical system could not accommodate the loads for the booths. Goodwyn, Mills and Cawood was hired to prepare the architecture and engineering drawings to allow the program to use their new welding stations.

Building B & Building D were renovations that include interior and exterior work, re-roofing, structural, mechanical, electrical, civil, site work, exterior lighting, new streets, repairs and alterations to existing streets and parking lots, landscaping, and sidewalks.

 

1 2 ••• 21 22 24 26 27 ••• 79 80