Granada Village Shopping Center Redevelopment (Building A1 - TJ Maxx Facade Construction - 2011-10-06) - Granada Hills, CA. Urban One www.urbanone.com.

Brisbane Transit Centre Demolition - Early Site Works, Cross River Rail Project, Roma Street, Brisbane CBD

Building 1

Wood Framing installation is complete.

Roof Trusses are moving forward at the Northside.

Mechanical, Electrical, Plumbing rough-in is underway on the 3rd and 4th floors.

Shingle and Flat Roof Installation is underway and 35% complete.

Building weather wrap is being installed and 40% complete.

Courtyard waterproofing prep is underway.

 

Building 2

Wood Framing installation is complete.

Roof Trusses are complete, and roof sheathing is moving forward and in progress on 85% of the building.

Mechanical, Electrical, Plumbing, and Fire Sprinkler rough-in is complete at the 2nd floor and progressing up to the 3rd floor.

Shingle and Flat Roof Installation is underway and 65% complete.

Building weather wrap is being installed and 30% complete.

 

Building 3

Underground Rough is 100% complete

The slab is poured and waiting for wood framing to commence.

 

Building 4

Foundation is 1000% complete

Elevator shaft construction is complete

Underground Plumbing Rough is 25% complete

Underground Electrical Rough is 50% complete

 

Building 5

Foundation, underground utilities, and the slab is complete.

Progress pending framing start forecasted to for October 2018.

 

Building 6

Siding is complete.

Insulation is complete

Drywall installation is underway and 50% complete.

Site curbs are being installed

 

Sitework

Curb formwork and installation has started on Mill Road

Setting building site to final subgrade

Pump station Wet Well foundation walls are poured, and the wall formwork for the balance of building is 25% complete

Granada Village Shopping Center Redevelopment (Building A1 - TJ Maxx Facade Construction - 2011-11-03) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Phase 1 Completion - 2011-09-08) - Granada Hills, CA. Urban One www.urbanone.com.

mcad.edu Four permanent murals designed and produced by students in Elissa Cedarleaf Dahl's Fine Arts Studio Siteworks class will be unveiled at the historic Parkway Theater.

 

Photograph ©Erin Nicole Johnson for the Minneapolis College of Art and Design

Granada Village Shopping Center Redevelopment (Building B Stein Mart Facade Construction - 2012-01-31) - Granada Hills, CA. Urban One www.urbanone.com.

mcad.edu Karen Wirth, the chair of the Fine Arts department at the Minneapolis College of Art and Design, introduced the project.

 

Photograph ©Erin Nicole Johnson for the Minneapolis College of Art and Design

Granada Village Shopping Center Redevelopment (Building A1 TJ Maxx Facade Construction - 2012-02-09) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Building A2 Pick Up Stix Patio Construction - 2012-01-24) - Granada Hills, CA. Urban One www.urbanone.com.

The foundation is in! This is a crawl space, with a little head room in some places. We layered crushed stone/ 6mils of plastic/ more crushed stone. The far side is ledge, which saved some $ in cement

Maxwell Systems ProContractorMX Earthwork Digital Takeoff Software is an earthwork estimating software that makes sitework contractor’s jobs easy! The Earthwork tool efficiently calculates any sitework job easily! Try our earthwork estimating software today!

 

www.maxwellsystems.com/products/property/colonial/propert...

Granada Village Shopping Center Redevelopment (Building B Stein Mart Facade Construction - 2012-02-08) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Building B Stein Mart Facade Construction - 2012-01-27) - Granada Hills, CA. Urban One www.urbanone.com.

Construction of the Grafton Riverwalk in Veterans Memorial Park. Along the west bank of the Milwaukee River in Grafton, Wisconsin. Photo taken July 18, 2016.

Granada Village Shopping Center Redevelopment (Electrical Room E4 Construction - 2011-08-17) - Granada Hills, CA. Urban One www.urbanone.com.

2022 Southland Transport Invercargill Trucking Parade [Labour Weekend Sunday 23rd October] South Island, New Zealand.

 

Photographer: Leighton Smith.

 

Granada Village Shopping Center Redevelopment (Pad L Facade Construction - 2011-11-03) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Building A1 TJ Maxx Facade Construction - 2011-10-27) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Building A2 Facade Construction - 2012-01-31) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Building A2 Facade Construction - 2012-03-06) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (R-3 Sidewalk Improvements - 2012-02-10) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Building B Stein Mart Facade Construction - 2012-01-27) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Building A1-A4 Rain Damage - 2012-01-24) - Granada Hills, CA. Urban One www.urbanone.com.

Brisbane Transit Centre Demolition - Early Site Works, Cross River Rail Project, Roma Street, Brisbane CBD

Granada Village Shopping Center Redevelopment (Phase 1 Completion - 2011-09-08) - Granada Hills, CA. Urban One www.urbanone.com.

Clearing land for a new barn. Many of the trees we dropped and milled into lumber were diseased.

Granada Village Shopping Center Redevelopment (Phase 1 Traffic Circle Sitework Construction - 2011-07-28) - Granada Hills, CA. Urban One www.urbanone.com.

Trenholm State Community College is currently in the process of architecturally re-branding their Patterson Campus. Trenholm State Community College’s Automotive Collision Repair Program was moved from the Trenholm Campus to the Patterson Campus, and in doing so, will utilize an existing 18,727sf metal building/warehouse which was conducive for the collision repair area. Additional square footage was added to the building to encompass two classrooms, a resource room, offices, tool storage, and a paint shop. The paint shop consists of two new pre-fabricated paint booths, mixing station, and prep area A new façade was developed to enhance the overall appearance of the building. This building is the first of many to feature the new architectural style.

Trenholm State Community College’s Administration and Financial Aid Building project included a new metal retrofit roof and the renovation of an existing building that houses administration offices, financial aid and other student amenities as part of there “Student Success” center to allow for additional classrooms. The existing spaces were updated with new finishes and associated energy efficient mechanical, electrical, and plumbing work. A new entrance and sitework were designed to give a good first impression to students and administrators entering campus.

Trenholm State Community College purchased state of the art prefabricated welding booths for their welding program. However, the buildings electrical system could not accommodate the loads for the booths. Goodwyn, Mills and Cawood was hired to prepare the architecture and engineering drawings to allow the program to use their new welding stations.

Building B & Building D were renovations that include interior and exterior work, re-roofing, structural, mechanical, electrical, civil, site work, exterior lighting, new streets, repairs and alterations to existing streets and parking lots, landscaping, and sidewalks.

 

Granada Village Shopping Center Redevelopment (Building A2 Pick Up Stix Patio Construction - 2012-01-24) - Granada Hills, CA. Urban One www.urbanone.com.

Trenholm State Community College is currently in the process of architecturally re-branding their Patterson Campus. Trenholm State Community College’s Automotive Collision Repair Program was moved from the Trenholm Campus to the Patterson Campus, and in doing so, will utilize an existing 18,727sf metal building/warehouse which was conducive for the collision repair area. Additional square footage was added to the building to encompass two classrooms, a resource room, offices, tool storage, and a paint shop. The paint shop consists of two new pre-fabricated paint booths, mixing station, and prep area A new façade was developed to enhance the overall appearance of the building. This building is the first of many to feature the new architectural style.

Trenholm State Community College’s Administration and Financial Aid Building project included a new metal retrofit roof and the renovation of an existing building that houses administration offices, financial aid and other student amenities as part of there “Student Success” center to allow for additional classrooms. The existing spaces were updated with new finishes and associated energy efficient mechanical, electrical, and plumbing work. A new entrance and sitework were designed to give a good first impression to students and administrators entering campus.

Trenholm State Community College purchased state of the art prefabricated welding booths for their welding program. However, the buildings electrical system could not accommodate the loads for the booths. Goodwyn, Mills and Cawood was hired to prepare the architecture and engineering drawings to allow the program to use their new welding stations.

Building B & Building D were renovations that include interior and exterior work, re-roofing, structural, mechanical, electrical, civil, site work, exterior lighting, new streets, repairs and alterations to existing streets and parking lots, landscaping, and sidewalks.

 

Maxwell Systems ProContractorMX offers digital takeoff technology – for structural elements and sitework cut-and-fill jobs – that allows you to perform a takeoff directly on screen, quickly and accurately and never touch a set of bulky, expensive blueprints.

 

www.maxwellsystems.com/products/estimating/procontractorm...

Granada Village Shopping Center Redevelopment (Space 9 Vanilla Shell Construction - 2011-11-03) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Building A1 - TJ Maxx Facade Construction - 2011-09-22) - Granada Hills, CA. Urban One www.urbanone.com.