View allAll Photos Tagged replacements

This was a duo-tone piece before the second round of paste came off. It was inspired by an alpine flower book and a Steampunk sensibility. The contours of the shoulder and the swirls of the flower harmonize with the circular gears. For any young neo-Victorian lady looking for an stylish plate armor upgrade!

 

original design by Carmel Clavin

South approach viaduct construction.

Removal of bath, installation of walking shower after removing a window from the bathroom

 

Golden Grove Rd/Nth East Rd intersection.

The Replacements - joined by Billie Joe Armstrong of Green Day - rocked the final day of the Forecastle Music Festival in Louisville, Ky.

replacement chassis for Caterham 7, rhd, long cockpit, no wiper holes, no heat hole, no exhaust hole no ears, no spare wheel holes, tunnel mounted handbrebrake, de-dion axle, k-series engine mounts, cockpit painted black

After skipping the 1998 model year, Mercury introduced the eighth-generation Mercury Cougar for the 1999 model year. Serving as the replacement for the Ford Probe, the first front-wheel drive Cougar shifted market segments from two-door personal luxury coupe to three-door sport compact, introducing the first Mercury sport hatchback coupe since the 1986 Mercury Capri.

 

While marketed in Europe and Australia under the Ford brand, the eighth-generation Mercury Cougar was the first Mercury car since the 1991–1994 Mercury Capri sold without a direct Ford model equivalent in North America.

 

The 1999–2002 Cougars were available with two engine options, the 2.0 L Zetec straight-4 engine with 125 hp (93 kW; 127 PS), and the 2.5 L Duratec V6 with 170 hp (127 kW; 172 PS).

 

Initially outranking its predecessor in sales, the eighth-generation Cougar (marketed towards younger buyers) struggled to compete for sales against sedans (the Mercury Sable and Grand Marquis) in the Mercury model line. Posing a challenge to sales personnel acquainted with marketing luxury-segment vehicles to new-car buyers along with attracting younger buyers into Mercury showrooms.

Project Profile: STERIGENTICS – Charlotte, NC

65,549 sf

 

Sterigentics was facing the typical problem facilities have when their roofs are 25 years old, leaks. A lot of the flashing around the HVAC units and skylights had deteriorated and was letting water underneath the membrane. After inspecting the existing insulation, we determined not all the insulation was damaged or wet so we were able to sa...lvage most of it, reducing the overall cost of the project.

 

They were happy with the previous TPO roof system’s chemical resistance, reflectivity and durability so we specified a mechanically attached re-cover with GAF’s 60-mil TPO membrane. We tore off all 65,549 square feet of the existing membrane and replaced the wet insulation as needed. Since there is a lot of foot traffic on the roof we installed walkpads at all the HVAC units for added durability. All the parapet walls, scuppers, curbs and penetrations were re-flashed and Sterigentics got a brand new roof. GAF Inspectors rated this roof system a perfect 10 on their visit, and we were able to give them a 20 year warranty.

I replaced the arm that was damaged from the recent crash. Fortunately these arms can be ordered separately. Jakub from quadrame.com has recently switched to using black GRP, which looks quite elegant!

The finished canopy in place on the traction engine.

Replacements for the C-628s power an empty ore train north towards Empire on August 16, 1989.

Original Delaware & Hudson GRS signals about to replaced by modern hood signals at Esperance, NY.

Interstage transformers bought from www.arbeiii.com and the cans with tar and crap removed.

South approach viaduct construction.

V115 (NL24 EKC)

2024 Yutong TC9 C34DL

Premier Minibus & Car Hire/Tates Coaches, Luton

Rail replacement, Elder Gate, Milton Keynes, 29 December 2025

Transcatheter aortic valve replacement (TAVR) is a minimally invasive treatment option for patients with aortic stenosis that are at high risk for open heart surgery. This approach allows the device to be inserted and deployed via a catheter based system.

 

drboonlim.co.uk/

Ground glass replacement for view cameras

The only way to tell that it was replaced is lack of moss.

The drillplate to fit a 0.07ci nitro engine (7CXP).

Makes a change from the normal 'Buses on rail replacement services' signs that are seen in London.

Existing door can be repaired Including this door in case buyer wants to replace instead.

South approach viaduct construction.

replacement chassis for Caterham 7, rhd, long cockpit, no wiper holes, no heat hole, no exhaust hole no ears, no spare wheel holes, tunnel mounted handbrebrake, de-dion axle, k-series engine mounts, cockpit painted black

Another angle of the replacement capacitor. It's got "330" written on it.

 

Replacement Cap: goo.gl/3ntxLv

Forum Post: goo.gl/0w7aJD

Youtube Link (Louis Rossmann): youtu.be/DzcgT_fiVTA

November skies at various angles. The content aware fill tool does a great job of taking out stray trees, etc.

Home made card for my aunt with recently replaced hip. HB pencil with some Prismacolor Verithin color tones on a roughish pastel paper.

A thing of beauty to a car nut, it's a shame that it will be hidden when installed. This is the Exedy twin-disk heavy duty clutch with vented, cerametallic pressure plate and matching flywheel; an ACT throw-out bearing and braided stainless steel clutch line. If I wanted, I could safely tune my ride to make 600 bhp knowing that this would hold it. The only problem is I will be penniless for a while.

Replacement of tram tracks between Little Bourke Street and Little Lonsdale Street. The existing tracks were set in mass concrete which required removal.

Adding a California Scientific Medium size windshield to the NC700X DCT. Had to modify the installation process due to poor mounting.

1 2 ••• 32 33 35 37 38 ••• 79 80