View allAll Photos Tagged pipefitting

Utah County, Utah

June 15, 2023

 

Crusty old pipe fitting ... so we had to replace the old dishwasher. Once the replacement was installed, it wasn't working well. The appliance repair guy said the new dishwasher was functioning up to spec, but wasn't getting any water. When he checked the shutoff valve, he found that the handle was turned all the way open, but the valve was stuck shut. So then we called the plumber, to get the valve replaced. Anyhoo, this is the fitting that connected to the dishwasher supply line. I guess 40 years of condensation will lead to some various chemical reactions with copper pipe. Not rusty, but pretty crusty!

  

This is actually 44 Laight Street in the Tribeca neighborhood of Lower Manhattan. According to StreetEasy, "Designed by Clinton & Russell Architects, the Renaissance Revival building was originally a bonded warehouse, later occupied by the pipe fitting maker, Grabler Manufacturing Company. Later converted to a condo in 2001, 38-44 Laight Street is located on a coveted cobble stone street."

 

Crazy Tuesday - One Colour

Plumb, square and dressed

More rusty fun from the fallen seawall on the East shore of Seattle's Golden Gardens Park.

I built this stand with plumbing pipes to go with the style of my hardware jewelries.

By some definitions, construction workers may be engaged in manual labour as unskilled or semi-skilled workers. These workers begin by attending to general tasks such as digging, cleaning, and unloading equipment. As they acquire experience, they start to specialize in particular areas - for example, roofing, pipefitting, structural work, or carpentry.

more pipefitting .

 

can one ever have too much pipe?

80098 was built at Brighton in December 1954. It was based on the Eastern Region working on the London, Tilbury and Southend Line (LT&S) working commuter services out of London until that route was electrified in 1962.

 

In July 1962 it came under Western Region ownership when it moved to into storage at Old Oak Common depot and subsequently at Shresbury and later on to Croes Newydd and then Machynlleth. Whilst at Machynlleth it passed to London Midland Region ownership when a number of depots were transferred to the London Midland Region in September 1963.

 

80098 was withdrawn from service in July 1965 and sold to Woodham Brothers at Barry for scrap. It arrived in the scrapyard in January 1966 and stayed there until November 1984 following the purchase of the locomotive by the 80080 Locomotive Holdings Group in March 1983. Initially the locomotive was thought of as a source of spares for 80080.

 

It was transported road to the Midland Railway at Butterley in November 1984 but work on stripping down the locomotive did not start until 1991.

 

Work on the overhaul ceased in 1993 and recommenced again in 1996 when the Princess Royal Class Locomotive Trust moved into their new premises, the West Shed.

 

The front fallplates-a common design feature on BR Standard locomotives-were made and fitted in new plate. All the locomotive steps were refurbished or new made. The bunker, which had been in the West Shed for some time, was painted internally and underneath in preparation for lifting on.

 

In the main workshops of the Midland Railway Trust (MRT) the side tanks underwent a programme of refurbishment for several weeks. The complicated structure on each tank has to be examined carefully for thinning and then remedial work carried out as required.

 

In early 1997 both tanks and bunker were fitted to the rolling chassis. One of the major items to be sorted out at this stage was the machining of the two leading coupling rods.

 

The major workshop activity continued on 80098 through 1997. In early March the last item of missing motion was collected from another 80000 class owning group.

 

In March the boiler arrived on an MRT well wagon and because of experience on working on 80080 some items received better refurbishment, such as the mild steel pegs from which the ashpan is suspended. These were replaced with stainless steel, offering a much longer life. New crinolines, made for some time, were fitted and cladding is applied.

 

The boiler inspector formally inspected the boiler in June 1997 and gave it a clean bill of health subject to some further NDT work, thus allowing the tubing to proceed in due course.

 

Work continued apace through autumn 1997 and spring 1998, with almost every working day seeing more parts fitted. Unfortunately, delays were incurred through waiting for materials. The copper pipe deliveries took almost one year to get through. As with 80080, the final pipefitting proved to be a long tedious job.

 

A new cab roof was made and fitted and the smokebox was fitted to the boiler in late summer 1997.

 

Cladding of the boiler took place during the autumn and early winter months as did the necessary hydraulic testing. With all work now in new covered accommodation, rapid progress was made and the overhaul completed in 1998.

 

80098 was steamed for the first time in preservation in August 1998 which was 33 years after it had last steamed under BR ownership. It then spent about the next ten days doing steam trials on the Midland Railway before being repainted and towed to Toton for the open day there at the end of the month.

 

Since then 80098 has clocked up several thousand miles of faultless running over various regions in the UK and was regularly steamed at the Midland Railway with scheduled trains and used for driver training and experience courses. It also spent periods of time on hire to the Churnet Valley Railway and the East Lancashire Railway.

 

Having held certification for main line work on Railtrack and Network Rail the locomotive has visited various parts of the country including the London Tilbury and Southend Line and working the Exeter on the summer `Dawlish Donkey’ trains and between Llandudno Junction and Blaneau Ffestiniog.

 

Whilst working on the line to Blaneau Ffestiniog 80098 was waiting at Llanwrst with the second portion of an eight coach train which had been split with 80079 hauling the first four coaches onwards from Llanwrst. 80079 stalled near Pony Y Pant and 80098 was required to provide assistance before both engines returned to Llanwrst to haul the second portion of the train.

 

In 2005, as part of the opening of the West Shed extension, HRH The Duke of Gloucester drove 80098 from Butterley Station part of the way to the event. Following the boiler certificate expiring in April 2009, 80098 is currently undergoing a heavy general overhaul in the West Shed workshop.

 

It was announced in early 2019 that it was planned that the locomotive would operate on the main line following its overhaul. It is unlikely that the overhaul will be completed in the short term and the boiler is known to require a lot of work.

 

source: Preserved British Steam Locomotives

 

preservedbritishsteamlocomotives.com/80098-2/

 

Restored: flic.kr/p/2iKDQFs

Wimblington Cambridgeshire based Knowles Transport Scania R 440 coupled to a three axle tipper unloading at the Nestle Purina pet food factory at Sudbury

Dover based Mike Beer Transport Volvo FH 460 coupled to a three axle tipper trailer unloading at the Nestle Purina pet food factory at Sudbury

Landvanherkomst Nederlands based v.Vlastuim ED transport Mercedes Actros coupled to a three axle tipper trailer unloading at the Nestle Purina pet food factory at Sudbury

Marks Tey based Witham Plant DAF XF coupled to a three axle tipper trailer parked at the Nestle Purina pet food factory at Sudbury

Front cover of Catalogue B.12 of Steam and Water Specialities by British Steam Specialities Ltd. (B.S.S. Ltd.) of Leicester . 1911. [There is no mention, among the jointing compounds offered, of their best known product , Boss White, which must be a later introduction ]

Marks Tey based Witham Plant Hire DAF XF coupled to a three axle tipper trailer unloading at the Nestle Purina pet food factory at Sudbury

Looks like a new livery for Dover based Mike Beer Transport online three axle tipper trailer coupled to a DAF XF 105/480 unloading at the Nestle Purina pet food factory at Sudbury

Marks they colchester based Witham Plant Hire Bulk Haulage Renault Premium 460 coupled to a three axle tipper trailer unloading at the Nestle Purina pet food factory at Sudbury

Ready C Armach Northern Ireland based Campbell Bulk Haulage Volvo FH 460 coupled to a three axle tipper trailer unloading at the Nestle Purina pet food factory at Sudbury

Colchester based Witham Plant Hire Bulk Haulage MAN TGX-26-440 coupled to a three axle tipper trailer unloading at the Nestle Purina pet food factory at Sudbury

Stanton based John Stanford Bulk Haulage Volvo FM 450 coupled to a three axle tipper trailer unloading at the Nestle Purina pet food factory at Sudbury

Marks Tey based Witham Plant Hire DAF XF 105 /480 coupled to a three axle tipper trailer unloading at the Nestle Purina pet food factory at Sudbury

Sarval logistics. Volvo FH coupled to a three axle tipper trailer unloading at the Netle Purina pet food factory at Sudbury

View of damaged asbestos pipe fitting insulation with debris.

Dover based Mike Beer Transport Volvo Fh coupled to a three axle tipper trailer unloading at the Nestle Purina pet food factory at Sudbury

No name Scania R480 coupled to a three axle tipper trailer unloading at the Nestle Purina pet food factory at Sudbury

Marks they based Witham Plant Hire DAF XF euro5 coupled to a three axle tipper truck unloading at the Nestle Purina pet food factory at Sudbury

Buntingford Hertfordshire based Arnold Hitchcock & Company Volvo FM 440 coupled to a three axle tipper trailer unloading at the Nestle Purina pet food factory at Sudbury

Ipswich based Warren Haulage Bulk Haulage Mercedes Actros 2546 coupled to a three axle tipper trailer unloading at the Nestle Purina pet food factory at Sudbury

Dover based Mike Beer Transport Volvo FH 460 coupled to a three axle tipper trailer unloading at the Nestle Purina pet food factory at Sudbury

Ross on Wye based Roberts Roadways 6x2 ERF coupled to a three axle tipper trailer unloading at the Nestle purina pet food factory at sudbury

Sudbury based T.M. Transport Volvo FM 440 globetrotter coupled to a three axle tipp[er unloading at the Nestle Purina pet food factory at Sudbury

Keady Co.Armagh N. Ireland based Campbell Bulk Haulage Scania R 440 coupled to a three axle S D C tipper trailer unloading at the Nestle Purina pet food factory at Sudbury

Diss based Openfield logistics Mercedes Actros 2546 coupled to a three axle tripper trailer unloading at the Nestle Purina pet food factory at Sudbury

Driffield East Yorkshire based J R Hood Haulage Contractors DAF XF 105/410 coupled to a three axle tipper trailer unloading at thew Nestle Purina pet food factory at Sudbury

Marks They based Witham Plant Hire DAF XF coupled to a three axle tipper trailer unloading at the Nestle Purina pet food factory at Sudbury

Debenham Stowmarket based C J Rose Haulage DAF CF 105/460 coupled to a three axle tipper trailer unloading at the NestlePurina pet food factory at Sudbury

Dover & Thurrock based Mike Beer Transport DAF XF euro6 coupled to a three axle tipper trailer unloading at the Nestle Purina pet food factory at Sudbury

Driffield East Yorkshire based J R Hood Haulage Contractors DAF XF coupled to a three axle tipper trailer unloading at the Nestle Purina pet food factory at Sudbury

Elm road Colchester based Witham Plant Hire DAF XF 105/480 coup.ed to a three axle tipper trailer unloading at the Nestle Purina pet food factory at Sudbury

Rickinghall Diss Norfolk based Barry Clarke & Son Haulage Ltd DAF XF 105/480 coupled to a Wilcox bodied three axle tipper trailer unloading at the Nestle Purina pet food factory

1 3 4 5 6 7 ••• 19 20