View allAll Photos Tagged pg
Wednesday 24th December 2014 saw the end of Freightliner heavy haul contrct to work the Bardon quarry stone trains after 10 years (2 5 year contracts) FLHH moved there 5 stabled locomotives 66951/66622/66598/66415/66419 as 0Y70 1242 Bardon Hill - March Whitemoor. As 0Y70 departed 0Z20 66745 with the new operator GBRF passed route learning Croft/Coalville Mantle Lane and Bardon Hill sidings. Photo's with permission of signalman Mick Hall.
Paul and Tom buying tickets at the Shot Tower / Market Place station of the Baltimore Metro Subway. Baltimore, MD.
A post hospital appointment at Leicester general allowed a stop off at Cossington, although this train should have passed 90+ minutes before it eventually did, and a nice bonus when I parked up thinking it'd be well gone. 43303/91117/43301 on 1Q91 1357 Loughborough Brush - Leicester LIP via Bedford MML electrafiacation testing train. 2nd August 2024
BR pair 20132/20107 with S stock unit 527/528 and 20314/20096 on the rear pass Whitacre Heath. Road closure and the dash from Work meant a quick park and hope a shot off the bridge. Thursday 21st June 2018.
Kate Beck
Modulation , 2010
Graphite of paper on aluminum floated in maple frame
12 x 12 inches
PG# KB.0014
Pelavin Gallery is proud to announce a solo exhibition of recent work by American artist, Kate Beck. This show will include large scale poured oil paintings and graphite drawings on aluminum panel. This will be Beck’s first solo exhibition at the gallery, and in New York City.
In this new body of work, Beck continues her engagement with repetitive tonal rendering as a means of interaction between light and shadow, human thought and consciousness, and the dynamic architectonics of space. This time she takes the essence of form further by using aluminum substrates, allowing modulating marks of graphite and poured oil to accumulate and shift amidst the confines of the geometric shapes. Tension oscillates between formalistic geometry and existential space; an allusion to thought and consciousness, and the passage of time.
For more information, please visit pelavingallery.com
Hazardous tree removal wouldn't be possible without cooperation with many partners. PG&E has taken an active role in felling beetle-killed trees threatening power lines. As of Summer 2016, PG&E is now also removing the slash and downed trees from each site to reduce leftover flammable fuels.
Photo by Monte Kawahara, BLM Forester.