View allAll Photos Tagged officespaces
The New Village at Patchogue project has progressed nicely beyond 90% of all subgrade structural features and about 60% of the elevated structural post-tension slab work is completed or in progress. Building 1 spearheads the vertical rise with two levels currently framed and Masonry construction rising above the wood framing. Building 2 will under way with its first floor of wood framing by the end of April 2013. Mechanical, Electrical and Plumbing trades have been coordinating with ongoing structural components in all buildings as the system installation needs progress, and installation of roughed out systems in sub grade and framed units is well under way.
External site improvements are partially placed while the installation of a major portion of subgrade sewer, power, communication and drainage systems that will serve the project are scheduled to commence shortly. By the end of May, the last section of connecting structural slab is expected at the crossover to Havens Avenue opposite Jennings and will complete the footprint for vertical construction at buildings 1, 2, 3 and 5. Building 4 is scheduled to start excavation at West side of the site (on Main Street) to make way for the foundation at the last structure in the project.
Well situated in the heart of a suburban downtown revitalization, the 31 West Building has stood in the Village for close to a century and is in the midst of a renovation that will prepare it to be a vital part of Patchogue for the next century.
Today, 31 West is a 26,334 SF mixed use Office and Retail building. The original structure once stood with proud architectural features; high ceilings, keystones, cornices, crown molding and tin ceilings. Many of these features will return in the renovation.
Redevelopment of the facade, the reintroduction of the original cornice at the top of the building, replacement of all storefronts, a new main entrance and lobby core, upgraded elevator, bathrooms and hallways have all been completed. The building has become the Jewel of Main Street and is awaiting tenants.
Redevelopment of the property was done by TRITEC Development Group, the construction was completed by TRITEC Building Company, and the building is managed by TRITEC Asset Management. The photographs were taken by Steve Geraci of Reflex Photo.
Well situated in the heart of a suburban downtown revitalization, the 31 West Building has stood in the Village for close to a century and is in the midst of a renovation that will prepare it to be a vital part of Patchogue for the next century.
Today, 31 West is a 26,334 SF mixed use Office and Retail building. The original structure once stood with proud architectural features; high ceilings, keystones, cornices, crown molding and tin ceilings. Many of these features will return in the renovation.
Redevelopment of the facade, the reintroduction of the original cornice at the top of the building, replacement of all storefronts, a new main entrance and lobby core, upgraded elevator, bathrooms and hallways have all been completed. The building has become the Jewel of Main Street and is awaiting tenants.
Redevelopment of the property was done by TRITEC Development Group, the construction was completed by TRITEC Building Company, and the building is managed by TRITEC Asset Management. The photographs were taken by Steve Geraci of Reflex Photo.
31 West Main Street is in the heart of Patchogue’s downtown revitalization, the building has stood in the Village for more than a century and has been restored beyond its original glory by TRITEC.
Today, 31 West is a 26,334 SF mixed use Office and Retail building. The original structure once stood with proud architectural features; high ceilings, keystones, cornices, crown molding and tin ceilings, many of these features have returned in the revitalization..
Redevelopment of the facade, the reintroduction of the original cornice at the top of the building, replacement of all storefronts, a new main entrance and lobby core, upgraded elevator, bathrooms and hallways have all been completed. The building has become the jewel of Main St and is at a prime location in the heart of the New Village project.
The development, construction and the current management of the property are all done by TRITEC
My co-worker from Tucson came down to San Diego to work with me in my home office. I had to clean up, of course. I was so proud, I took a picture :)
Elevations on New Village at Patchogue’s Building 1 are now complete. Inside building 1, paint, tile and trim are nearly complete and cabinet and granite installations have begun on the 4th floor with floor. Roofing is complete on Buildings 2 and 5 and elevations are underway. Inside Building 2 Interior trades are completing rough plumbing, electric, fire sprinkler and HVAC.
Masonry shafts, stair towers and installation of 3rd floor panels are almost complete on buildings 3 and 4.
Ongoing site work includes the rigging of submersible transformers; parking lot curbs and site lighting being installed in phase 1. With colder weather approaching interior parking lot development and courtyard construction as well as completing the installation of all utilities to the buildings is a priority.
Public computer
fast, secure internet
telephone for local or inhouse calls
listing of area shops, and resturants
beverage service including starbucks coffee, pepsi, and coke products, and filtered water
microwave
comfortable seating in front of small plasma
"Human beings were not meant to sit in little cubicles staring at computer screens all day, filling out useless forms and listening to eight different bosses drone on about mission statements." - Peter Gibbons (Office Space)
Elevations on New Village at Patchogue’s Building 1 are now complete. Inside building 1, paint, tile and trim are nearly complete and cabinet and granite installations have begun on the 4th floor with floor. Roofing is complete on Buildings 2 and 5 and elevations are underway. Inside Building 2 Interior trades are completing rough plumbing, electric, fire sprinkler and HVAC.
Masonry shafts, stair towers and installation of 3rd floor panels are almost complete on buildings 3 and 4.
Ongoing site work includes the rigging of submersible transformers; parking lot curbs and site lighting being installed in phase 1. With colder weather approaching interior parking lot development and courtyard construction as well as completing the installation of all utilities to the buildings is a priority.
TKG was throwing a pumpking carving contest for their website and what not so I decided to try something I never have before. I purchased a linoleum carving tool and created a template in illustrator of Milton from Office Space. It took about 4-5 hours but wasn't so bad for my first try.
I won though :) High five bonus day off work.
#Coworking spaces are, in many ways, exactly like the stereotype. For instance at the #coworkingspace in Mumbai apart from flexible seating and private offices, there are other add-on services like Cleaning, #conferenceroom for events, boardroom access to cost-effective #coworkingpackages
Taken using my new nikon 180mm f2.8f ED Ais lens...
Processed in darktable, soften, bloom, framing and crop.
M3M SCO Commercial Plots are designed in a way that they suit the needs of retail as well as office spaces.
➤ Ground + 4 storey shop cum offices.
➤ Adequate surface car parking facility.
➤ Shop modules offer flexibility in sizes.
➤ Terrace right advantage
➤ Wide Acre Project Land
➤ Optimum connection to Golf Course Road
Call us for Price Break-up:- +91-9311495526
#stuffthatfelloffthedesk #blacksheep #paperclips #integrated #officespace #workday #integration #office