View allAll Photos Tagged officespaces

Paul Willson (Bob Porter), Stephen Root (Milton), David Herman (Michael Bolten)

3 ' X 4' sheet of galvanized steel attached with super-duper double sided adhesive tape. Photos hung with tiny rare earth magnets.

At the Super Deluxe headquarters, Atlanta, GA.

 

Sent from my iPhone

I played Office Space to entertain the small crowd before Tag Tuesday began.

Howard Hughes Center - Where Creativity Meets Amenity!

 

Elevations on New Village at Patchogue’s Building 1 are now complete. Inside building 1, paint, tile and trim are nearly complete and cabinet and granite installations have begun on the 4th floor with floor. Roofing is complete on Buildings 2 and 5 and elevations are underway. Inside Building 2 Interior trades are completing rough plumbing, electric, fire sprinkler and HVAC.

Masonry shafts, stair towers and installation of 3rd floor panels are almost complete on buildings 3 and 4.

 

Ongoing site work includes the rigging of submersible transformers; parking lot curbs and site lighting being installed in phase 1. With colder weather approaching interior parking lot development and courtyard construction as well as completing the installation of all utilities to the buildings is a priority.

 

The wallpaper Bill Lumbergh has on his new Windows Vista machine.

 

Get the full file including and iphone background at jbiljr.com/2007/11/09/movie-night/

Newly vacant office suite available in boutique East 29th Street building conveniently located steps from Park Avenue South subway (6 train) in the heart of Manhattan's Murray Hill neighborhood. Space features hung ceiling, carpeted floors and is configured with perimeter offices and an open bullpen. Space measures 2,900 sf and asking rent is $40.00/sf, $9,667/month.

Spent all of yesterday/last night cleaning and reorganizing my home office. This is what it looked like 2 years ago.Thought I'd take new pics with natural light and a better camera ;)

 

This closet was a mess for quite a while (before). Now it's nice and tidy... for now.

we made all those in probably about half an hour

Well situated in the heart of a suburban downtown revitalization, the 31 West Building has stood in the Village for close to a century and is in the midst of a renovation that will prepare it to be a vital part of Patchogue for the next century.

 

Today, 31 West is a 26,334 SF mixed use Office and Retail building. The original structure once stood with proud architectural features; high ceilings, keystones, cornices, crown molding and tin ceilings. Many of these features will return in the renovation.

 

Redevelopment of the facade, the reintroduction of the original cornice at the top of the building, replacement of all storefronts, a new main entrance and lobby core, upgraded elevator, bathrooms and hallways have all been completed. The building has become the Jewel of Main Street and is awaiting tenants.

 

Redevelopment of the property was done by TRITEC Development Group, the construction was completed by TRITEC Building Company, and the building is managed by TRITEC Asset Management. The photographs were taken by Steve Geraci of Reflex Photo.

 

My backup drives hide behind here.

Mike graciously autographed a ticket for us.

Elevations on New Village at Patchogue’s Building 1 are now complete. Inside building 1, paint, tile and trim are nearly complete and cabinet and granite installations have begun on the 4th floor with floor. Roofing is complete on Buildings 2 and 5 and elevations are underway. Inside Building 2 Interior trades are completing rough plumbing, electric, fire sprinkler and HVAC.

Masonry shafts, stair towers and installation of 3rd floor panels are almost complete on buildings 3 and 4.

 

Ongoing site work includes the rigging of submersible transformers; parking lot curbs and site lighting being installed in phase 1. With colder weather approaching interior parking lot development and courtyard construction as well as completing the installation of all utilities to the buildings is a priority.

 

Nieuwe kantoor units te huur bij Igluu Eindhoven. Kijk op igluu.nl

Foto Marcel Braire

 

Ceiling height is 20' The space includes 200 AMP 3 phase electric and is fully sprinklered with access to truck dock. Multiple unit sales can expand your business anywhere from 3,049- 6,098 square feet. Unbeatable price! $109 per Sq. Ft. for Complete Move-In Ready, 100% Office! Price includes shell and buildout. With our buy/lease back promotion, ownership results in a $4.50/sf comparable lease rate.

 

The campus-style business park is home to a diverse group of businesses and is surrounded by a wild-life sanctuary. Fully sprinklered, pre-cast concrete construction, 200amp, 120/280 volt power 3 phase, access to shared dock.

 

Unit 122 has a CO and is ready for immediate occupancy includes full 3049 SF office build out!

 

Located just north of the 4- way interchange at I-88 and Farnsworth Avenue, across Bilter Road from the Chicago Premium Outlet Mall.

 

View All Commercial Properties for sale in Naperville and Aurora, IL

Nieuwe kantoor units te huur bij Igluu Eindhoven. Kijk op igluu.nl

Foto Norbert van Onna

Nieuwe kantoor units te huur bij Igluu Eindhoven. Kijk op igluu.nl

 

RGBC is a provider of virtual offices, coworking, furnished office space, and video conferencing.

 

Located in the heart of Silicon Valley - San Jose, RGBC is seconds away from the freeways and Santana Row.

 

Our services can be used by the hours, day week, or indefinitely.

 

Contact:

Joanne Escobar

560 S. Winchester Blvd.

San Jose, CA. 95128

joanne@rgbc.com

408.572.5600

www.rgbc.com/san-jose/office-space/

 

#rgbcWORKSPACES

#GetTheBestAddress

Number 6 store. I want that garment rack for my bag/coat collection.

Nieuwe kantoor units te huur bij Igluu Eindhoven. Kijk op igluu.nl

The view from Heron Tower in the center of London's financial district provides a dramatic backdrop for Summit panels.

Gap will allow dropping monitor and other cables neatly behind the desk - allowing the desk to sit closer to the wall.

I'd totally do this if it didn't mean I wouldn't get any references.

The New Village at Patchogue project has progressed nicely beyond 90% of all subgrade structural features and about 60% of the elevated structural post-tension slab work is completed or in progress. Building 1 spearheads the vertical rise with two levels currently framed and Masonry construction rising above the wood framing. Building 2 will under way with its first floor of wood framing by the end of April 2013. Mechanical, Electrical and Plumbing trades have been coordinating with ongoing structural components in all buildings as the system installation needs progress, and installation of roughed out systems in sub grade and framed units is well under way.

 

External site improvements are partially placed while the installation of a major portion of subgrade sewer, power, communication and drainage systems that will serve the project are scheduled to commence shortly. By the end of May, the last section of connecting structural slab is expected at the crossover to Havens Avenue opposite Jennings and will complete the footprint for vertical construction at buildings 1, 2, 3 and 5. Building 4 is scheduled to start excavation at West side of the site (on Main Street) to make way for the foundation at the last structure in the project.

 

This photo does not adequately capture the fact that I have a dead squid in a jar on my desk.

I got this quote from Aaron Swartz from the documentary The Internet's Own Boy. It is a moving film and really makes you wonder about a lot in the world.

Image via flickr photo by Oblong flickr.com/photos/oblongpictures/5250948891 shared under a Creative Commons (BY-NC-SA) license

 

Original: readwriterespond.com/c/2016/just-sort-of-do-it

Well situated in the heart of a suburban downtown revitalization, the 31 West Building has stood in the Village for close to a century and is in the midst of a renovation that will prepare it to be a vital part of Patchogue for the next century.

 

Today, 31 West is a 26,334 SF mixed use Office and Retail building. The original structure once stood with proud architectural features; high ceilings, keystones, cornices, crown molding and tin ceilings. Many of these features will return in the renovation.

 

Redevelopment of the facade, the reintroduction of the original cornice at the top of the building, replacement of all storefronts, a new main entrance and lobby core, upgraded elevator, bathrooms and hallways have all been completed. The building has become the Jewel of Main Street and is awaiting tenants.

 

Redevelopment of the property was done by TRITEC Development Group, the construction was completed by TRITEC Building Company, and the building is managed by TRITEC Asset Management. The photographs were taken by Steve Geraci of Reflex Photo.

 

I made one of these banners -- an exact replica to the one that appears in the movie "Office Space"

A larger view slide of the internal office

1 2 ••• 17 18 20 22 23 ••• 79 80