This aerial photograph represents construction progress for the New Village project, a 291 unit mixed-use development, as of December 14, of 2012. The phase of the project includes the site and concrete foundation development progressing at Buildings 3, 5, and 1 which are the Westerly most and Easterly most portions of the structure. Structural mat slabs, ramps and perimeter foundation walls are progressing at the Building's 5 and 1 located along the East side of the site. The entire mat slab and perimeter foundation is complete at Building 3 along the West side of the site and the post tension elevated slab is 80 % complete at the same Building. The sub grade structure is being excavated for Building 2 (at center of site) and the subsurface waterproofing membrane is being installed at spread footing locations. Additional scope that is progressing at this time includes the Mechanical, Electrical and Plumbing scope that is being installed within and below slabs.

External view of Lakeshore Park Plaza building.

This March at New Village the following major construction items were underway:

 

Building #1 and #2 – Courtyard Planter construction on exterior and on interior doing paint touch ups, final inspections and cleaning in advance of April 1 Tenant Move In.

 

Building #5 – Painting, Tile, Flooring installation and completion of exterior brick façade

 

Building #3 – Drywall and spackle operations, painting and floor tile, brick façade installation and siding installation

 

Building #4 – Mechanical, Electrical and Plumbing Rough In, Exterior siding installation

 

Sitework – finishing curb and sidewalk installations and brick paver installation has started. Preparations being made for final level of asphalt paving.

 

I exaggeratedly swung my arms and hips as I ostentatiously sauntered down the corridor. I wanted to see the apartment dwellers because I expected they would probably be among the sexiest people in town.

 

-----------------------

 

In downtown Lansing, Michigan, on November 30th, 2018, 721 North Capitol Avenue, erected 1972, on the west side of North Capitol Avenue, between West Madison Street and West Saginaw Street.

 

-----------------------

 

Getty Thesaurus of Geographic Names terms:

• Ingham (county) (1002502)

• Lansing (2052433)

 

Art & Architecture Thesaurus terms:

• apartment houses (300005707)

• arches (300000994)

• brick (clay material) (300010463)

• capital letters (300055061)

• mixed use (300112289)

• office buildings (300007043)

• sidewalks (300003893)

• signs (declatory or advertising artifacts) (300123013)

• street addresses (300386983)

• surveillance cameras (300266381)

 

Wikidata items:

• 30 November 2018 (Q45921919)

• 1970s architecture (Q7160121)

• all caps (Q3960579)

• Buildings and structures completed in 1972 (Q6404494)

• Downtown Lansing (Q5303483)

• November 30 (Q3015)

• November 2018 (Q31179571)

Aerial photographs of the construction of the New Village Development.

 

For more information on this project please visit www.newvillagepatchogue.com

For more information about TRITEC please visit www.tritecrealestate.com

Well situated in the heart of a suburban downtown revitalization, the 31 West Building has stood in the Village for close to a century and is in the midst of a renovation that will prepare it to be a vital part of Patchogue for the next century.

 

Today, 31 West is a 26,334 SF mixed use Office and Retail building. The original structure once stood with proud architectural features; high ceilings, keystones, cornices, crown molding and tin ceilings. Many of these features will return in the renovation.

 

Redevelopment of the facade, the reintroduction of the original cornice at the top of the building, replacement of all storefronts, a new main entrance and lobby core, upgraded elevator, bathrooms and hallways have all been completed. The building has become the Jewel of Main Street and is awaiting tenants.

 

Redevelopment of the property was done by TRITEC Development Group, the construction was completed by TRITEC Building Company, and the building is managed by TRITEC Asset Management. The photographs were taken by Steve Geraci of Reflex Photo.

 

Are you looking for #furnishedoffice space in Mumbai? Get furnished #officespace for rent in Mumbai with modern facilities conference room, a beautiful lounge, an engaging leisure library area under best hourly #officerental and #coworkingpackages.

Visit: www.themosaic.in/the-space.html

I love the colors in this outfit: the clean pear green of the skirt and the clean pale gray-blues of the shirt. There are no icy blues in the office yet but I'll work it in there.

 

Photo is from the now defunct Blueprint Magazine, March/April 2007 issue

You’re in charge at YourOffice. You get to choose the ideal mix of space and services to suit your business. As your needs change, you have the flexibility to adapt your office set-up accordingly. Here’s what you can expect at YourOffice – Ballantyne:

ï‚§Flexible Terms: One hour to 5 years +

ï‚§Choice of window, interior, single and team room configurations

ï‚§Free parking

ï‚§24x7 access, triple checkpoint security

ï‚§Private key mailbox

ï‚§Corporate Business Park security, patrolled nightly, cameras on site

ï‚§Furniture customized to your business needs

ï‚§Telephone handsets and lines

ï‚§WIFI Internet: fast and secure, with burstable bandwidth

ï‚§Business machinery: fax, scanner, copier, wireless network

ï‚§All electricity and HVAC provided

ï‚§Kitchen with complimentary beverage service

ï‚§Nightly janitorial service

ï‚§All the amenities of Ballantyne Corporate Park and the surrounding area

www.youroffice.com/ballantyne

Nieuwe kantoor units te huur bij Igluu Eindhoven. Kijk op igluu.nl

 

Elevations on New Village at Patchogue’s Building 1 are now complete. Inside building 1, paint, tile and trim are nearly complete and cabinet and granite installations have begun on the 4th floor with floor. Roofing is complete on Buildings 2 and 5 and elevations are underway. Inside Building 2 Interior trades are completing rough plumbing, electric, fire sprinkler and HVAC.

Masonry shafts, stair towers and installation of 3rd floor panels are almost complete on buildings 3 and 4.

 

Ongoing site work includes the rigging of submersible transformers; parking lot curbs and site lighting being installed in phase 1. With colder weather approaching interior parking lot development and courtyard construction as well as completing the installation of all utilities to the buildings is a priority.

 

Has anyone seen my red stapler? I know one of these fuggers took it.

 

For Flickr Group Roulette with Finding a Voice and Rise of the Machine.

 

Those damn machines, creating paper jams and inconveniences and taking fractions of pennies away from us.

 

Damn if feels good to be a gangsta.

Nieuwe kantoor units te huur bij Igluu Eindhoven. Kijk op igluu.nl

 

The Howard Hughes Center...Where Creativity Meets Amenity.

Stephen Root (Milton) and David Herman (Michael Bolten)

Henri Mazza, Mike Judge, Gary Cole, and Paul Wilson.

This aerial photograph represents construction progress for the New Village project, a 291 unit mixed-use development, as of December 14, of 2012. The phase of the project includes the site and concrete foundation development progressing at Buildings 3, 5, and 1 which are the Westerly most and Easterly most portions of the structure. Structural mat slabs, ramps and perimeter foundation walls are progressing at the Building's 5 and 1 located along the East side of the site. The entire mat slab and perimeter foundation is complete at Building 3 along the West side of the site and the post tension elevated slab is 80 % complete at the same Building. The sub grade structure is being excavated for Building 2 (at center of site) and the subsurface waterproofing membrane is being installed at spread footing locations. Additional scope that is progressing at this time includes the Mechanical, Electrical and Plumbing scope that is being installed within and below slabs.

You’re in charge at YourOffice. You get to choose the ideal mix of space and services to suit your business. As your needs change, you have the flexibility to adapt your office set-up accordingly. Here’s what you can expect at YourOffice – Ballantyne:

ï‚§Flexible Terms: One hour to 5 years +

ï‚§Choice of window, interior, single and team room configurations

ï‚§Free parking

ï‚§24x7 access, triple checkpoint security

ï‚§Private key mailbox

ï‚§Corporate Business Park security, patrolled nightly, cameras on site

ï‚§Furniture customized to your business needs

ï‚§Telephone handsets and lines

ï‚§WIFI Internet: fast and secure, with burstable bandwidth

ï‚§Business machinery: fax, scanner, copier, wireless network

ï‚§All electricity and HVAC provided

ï‚§Kitchen with complimentary beverage service

ï‚§Nightly janitorial service

ï‚§All the amenities of Ballantyne Corporate Park and the surrounding area

www.youroffice.com/ballantyne

Nieuwe kantoor units te huur bij Igluu Eindhoven. Kijk op igluu.nl

Foto Norbert van Onna

www.propworld.in/officespace/commercial-office-space-leas...

Prop World -9911004272- Find IT and commercial office space in Noida on rent,rented property for sale in noida,commercial office space for lease team of professionals from the industry specializing in office space rentals.

Spent all of yesterday/last night cleaning and reorganizing my home office. This is what it looked like 2 years ago.Thought I'd take new pics with natural light and a better camera ;)

 

This is my childhood bear. My Papa gave it to me when I was a weeee baby :) My parents brought him along when they came for a visit last May.

New Village at Patchogue project has almost completed construction of all structures in their vertical rise. Roof trusses are topping off Buildings 3 and 4 to the West while Buildings 2, 1, and 5 are fully roofed. Siding systems at Buildings 2 and 1 are very far along with trim details at Decks being completed. The building elevations present many different features and with much in place, the true charm of the buildings is becoming evident.

 

Exterior site features are being prepared to accommodate parking lot, sidewalk and landscape features and interior features are becoming a primary focus in the move toward completed buildings.

 

Exterior Brick and Stone are commencing at Building 5 while these features are nearing completion already at Buildings 1 and 2.

 

The interior of Building 1 is being trimmed, painted and tiled with cabinetry and floorcovering features moving forward as well. Building 2 is currently being sheetrocked and similar progress is soon to follow at Building 5.

 

Turnkey Creative Office Space Suites from 4 Production Space.

 

Located in Santa Monica, CA.

 

We rent by the day, week, month, or year.

 

Suite D has Private Entrance, Large Open Workspace (can accomodate 5-6 people), A/C, T3 Wi-Fi, Security Alarm with Personal Code, Printer, Fax, Phones and Industrial High Speed Color Copier.

 

Office Space as low as $32/day!

See www.4-ProductionSpace.com for details.

Still unpacking boxes... almost there.

At the AFI showing of Office Space

Since our last photo…

 

Building 3 is formed for the first phase of elevated structural concrete deck, and the second phase elevated deck pour will be moving toward the Lake Street edge by the end of July.

 

Building 4 has much of its sub grade structure in place with a move toward the elevated structural deck by the end of August.

 

Subgrade utilities for LIPA, Verizon and Cablevision are completed at 70% of the site along with the same percentage of sewer and storm connections to on site drainage structures.

 

Looking for #coworking_officespace in Mumbai, India? Mosaic offers you the best #amenities you can avail at your #sharedofficespace with Mosaic.

Check the best amenities Mosaic offers under affordable hourly #officerental... www.themosaic.in/price-and-benefites.html

 

Spent all of yesterday/last night cleaning and reorganizing my home office. This is what it looked like 2 years ago.Thought I'd take new pics with natural light and a better camera ;)

New Village at Patchogue elevation on Building 1 is nearly complete, the siding and roofing details, along with the start of brick veneer, are substantially complete. Building 2 is nearing the same progress as Building 5 whereby roofing sheathing is capping the building. Buildings 2 and 5 are ready for roofing. Buildings 3 has started the installation of 2nd floor panels along with the rise of masonry shafts at stairs and elevators. Building 4 has completed the last of the structural elevated slabs on the projects and panels are laid out and ready for installation.

 

Site Sewer and storm drainage is largely completed. Subsurface vaults are set at all 6 locations and make way for the redirection of power and communication services.

 

Interior trades are completing roughing at plumbing, electric, fire sprinkler and HVAC while sheetrock, and interior finishes follow behind.

 

Progressive accomplishments will be evident within the next month or two where Buildings 3 and 4 will present vertical accomplishment in the framed state. Additionally, the project will soon have external sidewalk, asphalt and curb definitions within the project site layout. LIPA will be moving toward providing a form of permanent power and interior spaces will be achieving a more refined finish.

 

www.propworld.in/officespace/commercial-office-space-leas...

Prop World -9911004272- Find IT and commercial office space in Noida on rent,rented property for sale in noida,commercial office space for lease team of professionals from the industry specializing in office space rentals.

Banana Bucks give employees the opportunity to recognize each other's accomplishments.

Well situated in the heart of a suburban downtown revitalization, the 31 West Building has stood in the Village for close to a century and is in the midst of a renovation that will prepare it to be a vital part of Patchogue for the next century.

 

Today, 31 West is a 26,334 SF mixed use Office and Retail building. The original structure once stood with proud architectural features; high ceilings, keystones, cornices, crown molding and tin ceilings. Many of these features will return in the renovation.

 

Redevelopment of the facade, the reintroduction of the original cornice at the top of the building, replacement of all storefronts, a new main entrance and lobby core, upgraded elevator, bathrooms and hallways have all been completed. The building has become the Jewel of Main Street and is awaiting tenants.

 

Redevelopment of the property was done by TRITEC Development Group, the construction was completed by TRITEC Building Company, and the building is managed by TRITEC Asset Management. The photographs were taken by Steve Geraci of Reflex Photo.

 

View of center Drive and The Promenade at Howard Hughes Center.

This is an actual fake clock placed by the Clock Placement Committee at my office.

 

Do you ever feel like your life is a Dilbert cartoon?

 

It's enough to give a person a permanent case of the Mondays.

1 2 ••• 25 26 28 30 31 ••• 79 80