View allAll Photos Tagged formwork
Testing concrete pumping from the bottom of the formwork. Companies involved in the test were Cemex of Mexico, Urbi, and Wall-Ties & Forms, Inc.
some concrete formwork in place at eastern end of the rail vehicle shed - to middle-left is the all important central pod. Phew!
R3 Triangle Building, Little Italy, San Diego, CA. Thin, triangle-shaped, 3-story loft. Architect: Lloyd Russell.
In November 2007 ADIF, the Spanish railway infrastructure administration awarded a joint venture of Acciona (75%) and Obras Subterraneas (25%) the
EUR 113.8 million contract to build the 4.7 km section between Aranjuez and Ontigola. This includes the El Regajal Tunnel.
BarChip was chosen for the
primary secondary lining at
El Ragajel
The total tunnel length in 2,437 m, of which 2,080 m is the excavated tunnel with two cut and cover tunnels measuring 23 m and 224 m at the north east and south east ends respectively. The tunnel will be suitable for a double track.
The difficult and complex ground conditions comprise of clays with high salt
contents that can easily dissolve with low cover at the portals. Ground support
consists of steel sets together with 300 mm of BarChip reinforced shotcrete. Over 10,000 m3 of BarChip reinforced shotcrete will be used for primary ground
support, batched from a specially installed on site batching plant.
In excess of 120,000 m3 of BarChip reinforced concrete will be used for the secondary lining which will be up to 1.0 m in thickness. The concrete will be placed in situ using a 12 m travelling formwork. BarChip is being used to reinforce the secondary lining to enhance its resistance to the harsh ground
conditions over the life of the tunnel. BarChip fibre will not only impart excellent impact and abrasion resistance but it will help reduce any crack propagation.
Formwork elements from the company PERI are being used as a design element for the 2019 Ars Electronica Festival exhibition space POSTCITY.
Credit: Ars Electronica / Martin Hieslmair
At stairs to 2nd floor galleries, Clyfford Still Museum, Denver.
Architect: Allied Works Architecture
Completed: 2011
"East Abutment Monolith 45 & Formwork Mid July '61"
Original caption and photograph by Roy Hamilton
KHS - Roy Hamilton Collection
KHS Digital Archive Number: KHS-1998-16-ey-P1-D
Digitised and documented by KHS Volunteers.
Insulated concrete homes constructed using aluminum concrete forms. For more information visit www.wallties.com
Hydrotherapy Pool Formwork
Construction shots of Winifred Holtby School with Tweendykes Special School taken in October 2010.
It was built by the Esteem Consortium, designed by JM Architects and cost £38 million.
To find out more about the school please visit buildingourfuture.org.uk/wht
Lightweight Construction Method - cast a home with lightweight concrete and moladi modular plastic shutter formwork
(13) The last layer of the mold has been poured. Previous layer exposing feet has been waxed for release, a new batch of plaster mixed up and poured. It will be no great tragedy if this second layer bonds by mistake to the earlier one, since many molds don't bother with the separation anyway.
Multi-Story concrete construction using aluminum concrete forms. For more information on concrete formwork visit Concrete Forms
Formwork elements from the company PERI are being used as a design element for the 2019 Ars Electronica Festival exhibition space POSTCITY.
Credit: Ars Electronica / Martin Hieslmair
Permanent formwork can be referred to as braces that are assembled to contain concrete as it thickens.
Learn more here: www.formworkcontractorsbrisbane.com/the-fuss-about-perman...