View allAll Photos Tagged formwork
Concrete construction in Venezuela using aluminum concrete formwork. For more information on formwork visit www.wallties.com
The formwork for the angel wings at Bent 5 that will support the arches of Spans 4&5 are taking shape and are scheduled to be filled with concrete in early September. NB27105
Concrete housing contruction in Barbados using aluminum concrete formwork. For more information on Formwork visit www.wallties.com
Concrete construction in Venezuela using aluminum concrete formwork. For more information on formwork visit www.wallties.com
RMD Kwikform Iberica has engineered and supplied specialist formwork and falsework for the construction of the Monteporreiro viaduct in northern Spain.
Concrete swimming pool construction using aluminum concrete forms. For more information visit www.wallties.com
Large struts and other formwork are installed as part of wider concrete form construction work for the future concourse level floor slab at the south end of the station headhouse.
Rapid Industrialized concrete housing construction using handset aluminum concrete forms. For more information visit www.wallties.com/securetech.htm
Concrete Housing Construction in Chile using Aluminum Concrete Forms. For more information visit www.WALLTIES.com
Rapid Industrialized concrete housing construction using handset aluminum concrete forms. For more information visit www.wallties.com/securetech.htm
Concrete construction in Venezuela using aluminum concrete formwork. For more information on formwork visit www.wallties.com
Concrete forms used to pour closure walls on multi-story building in Florida. For more information on aluminum concrete forms visit www.wallties.com
RMD Kwikform Iberica formwork and falsework used in the construction of one of europe's widest viaducts.
A series of shots showing construction progress between the eastern portal of the tunnel under Moore Park West and Lang Road. Activities include (among other things) preparation for laying track between the tunnel portal and Moore Park stop, building piers and the lift well for the overbridge, preparing formwork for he "Y" turnout at the city end of he turnback, and 'stitching' the track on the northern side of Lang Road.
Picture: A closer shot as a worker walks from the eastern portal of the tunnel under Moore Park West. To his right (our left) we can see the reinforcing and track spacers indicating that tracklaying is at an advanced state in the tunnel itself.
Looking NE from approach to Clark Bridge.
Pouring last section (SW corner) of top floor of Witherspoon Street parking garage. This is an example of a post-tensioned slab.
Schwing 1200/32 concrete pump, fed by concrete truck, is used to pump concrete up to work site.
At far right, man in plaid shirt controls position of placing boom and rate of concrete flow via remote box connected by cable to concrete pump.
One worker uses vibrating rod to remove embedded air pockets; others use 2x4s and shovels to smooth surface of fresh concrete.
.
Schwing 1200/32 ["32" refers to 32-meter vertical reach of placing boom] is discontinued; current version is S 32 S .
.
Louisville, Kentucky.
April 1988.
.
file # 88d102.
35 mm Kodachrome.
Plustek OpticFilm 7600i.
Siverfast 8.
Picture Window 6.
unsharp mask (radius 1,threshold 3, 100%).
JPEG quality 95.
Concrete construction in Venezuela using aluminum concrete formwork. For more information on formwork visit www.wallties.com
Concrete construction in Venezuela using aluminum concrete formwork. For more information on formwork visit www.wallties.com
Not quite a precast loophole, but this rather off-centre example has been constructed using what appears to be a precast concrete window sill as the lintel, and a precast paving slab to support the bottom of the recess that would have accommodated a machine gun tripod leg. Judging by the not-so-crisp lines on the concrete used as the bottom of the loophole, this may have been cast in-situ during the construction of the pillbox.
You can read more about concrete shutteirng on my website frontlineulster.co.uk/pillbox-shuttering/
View from the freshwater tank of the B Shredder formwork and reinforcement. No piles were driven for this installation. The mobile irrigation pump (bottom right) was used almost continuously to lower the water level.
RMD Kwikform Iberica formwork and falsework used in the construction of twin viaducts in Talavera de la Reina.
Concrete construction in Venezuela using aluminum concrete formwork. For more information on formwork visit www.wallties.com
RMD Kwikform Australia's formwork and falsework used in the construction of Northern Territory's most expensive road development top date.
RMD Kwikform Iberica has engineered and supplied specialist formwork and falsework for the construction of the Monteporreiro viaduct in northern Spain.
Rapid Industrialized concrete housing construction using handset aluminum concrete forms. For more information visit www.wallties.com/securetech.htm
Concrete swimming pool construction using aluminum concrete forms. For more information visit www.wallties.com
RMD Kwikform Ibérica supplied engineering expertise and a range of equipment, including Megashor and Kwikstage shoring, beams and braceplates to assist in the building of the 34m euro ‘Third Millennium Bridge’. Spanning the Ebro River in the Aragon region of north east Spain, the Bridge, built by Dragados, is the World's largest suspended concrete arch bridge.
Concrete construction in Venezuela using aluminum concrete formwork. For more information on formwork visit www.wallties.com
RMD Kwikform supplied specialist formwork and shoring solutions to main contractor Dragages - China Harbour -VSL Joint Venture, to create a key section of the £6.5bn Hong Kong – Zhuhai – Macao Bridge (HKZMB).
For more information on products and services from RMD Kwikform visit
RMD Kwikform Iberica has designed, supplied and erected the formwork and falsework equipment for the construction of the Mogan viaduct’s twin decks on the island of Gran Canaria.
RMD Kwikform supplied specialist formwork and shoring solutions to main contractor Dragages - China Harbour -VSL Joint Venture, to create a key section of the £6.5bn Hong Kong – Zhuhai – Macao Bridge (HKZMB).
For more information on products and services from RMD Kwikform visit
Carpenters construct concrete formwork adjacent to footings for future escalators near the south end of the Yerba Buena/Moscone station platform.
Title: Parsons Street Footway: South approach, formwork
Creator: City of Boston Public Works Department
Date: 1942 January 12
Source: Collection 5010.004, Bridge and Ferry photographs
File name: 5010004_048_019
Rights: Public Domain
Citation: Bridge and Ferry photographs, Collection #5010.004, City of Boston Archives, Boston