View allAll Photos Tagged datacenter
each Dell 2U chassis contains 4 servers that each have 2x48 core i7s and 512GB RAM, 10gigE and local SSDs. part of a univa HPC cluster at a local university.
The first floor of the Hitachi Green Datacenter will house an integrated monitoring center, nitrogen gas firefighting equipment and uninterruptible power supplies. The firefighting equipment is specially designed with Nitrogen gas fire extinguishers and cooling systems using outdoor air, both of which have zero ozone depletion and global warming potentials.
The top louvers is outdoor air and the bottom louvers is indoor warm/hot air. The system automatically adjusts how much comes in. Then the air goes through the filters on the right.
Scenes from the Lego Office 365 datacenter diorama as displayed at TechEd in Orlando.
Orlando, Florida
June 2012
I like the silouette of Kevin on the other side of the rack contemplating the skyline out the window.