View allAll Photos Tagged datacenter
Installation of the cold aisle cover between the rows of racks. (Montaggio della copertura del corridoio freddo tra le file di rack).
The CIX data centre ceiling is being hung at the minute - this is it currently. It will shortly be plastered.
Facebook spent an extra $0.05 per motherboard to have the blue LED's. They look really cool in the dark.
The raised floor is one meter high. Inside there are three levels of ducts. (Il pavimento flottante è alto un metro. Al suo interno ci sono tre livelli di tubi e canaline.)
Here's where I cut my teeth on the setup of a website's hardware. The former Exodus corporate site was running on two load-balanced e450 servers, an A1000 RAID drive, a Dell system running Red Hat and a Windows server for e-marketing software. I spent WAY too many hours standing in this tiny cage configuring servers and networking gear. Ear plugs and a coat required.