View allAll Photos Tagged constructions

Business improvement site

The soap dish is actually an aluminum body step used on large trucks... I found it in a towing equipment catalog.

Construction at the new Traders Village in San Antonio - October 2010.

This weekend, we rehabilitated the 7 train's tunnel under the East River. This photo shows duct bank debris removal. Photo by Metropolitan Transportation Authority / Alok Saha.

Nikon FE2

24mm Nikkor f/2.8 Ais

Kodak Ultramax

The construction wharf of what will be the largest lock in the world: the Deurganck lock at the port of Antwerp.

 

This is a view of the outer side of the north lock wall which will be filled in once the lock is close to being finished. It will then be impossible to see the concrete anchoring of the mooring bollards.

 

With a length of 500m and a width of 68m the surface of this new lock is exactly the same as the present largest lock, the Berendrecht lock (also at the port of Antwerp) but this one will be able to handle vessels with a draught of 17.5m compared to 13,5 at the Berendrecht lock.

 

some figures

750000 cbm of concrete will be needed which is produced at a rate of 1500 up to 3500 cbm per day.

 

10000 tons of steel sheet piling

53000 tons of steel concrete reinforcing rods

22000 tons of construction steel for the lock gates and bridges

 

For the construction of the lock, a total of 4 500 000 cbm of earth had to be moved at a rate of 20000 up to 35000cbm per day with 20 dumpertrucks.

 

price : € 272 000 000

 

construction started on 24 October 2011 and will be finished on 24 May 2016

Manipulated version of a photograph taken on Av. Amsterdam in Mexico City.

(c) Chi Hyun Ahn Photography

794 highway construction, milwaukee, wisconsin

Construction workers doing their job

Although clearing is promised.

Construction work going on both sides of the line at Wembley depot.

Residential flats being built by the station and wall repair work on the depot, which will be ongoing until the end of the year. A road/rail cherry picker occupies 3-Charlie, which will be blocked to train movements for the duration of the repair work.

The slam door set powered by 68011 sits alongside 168327

Construction workers taking a break in Baghdad.

 

Credit : ILO/Apex Image

Date : 2005/11

Country : Irak

Ducks swimming in excavated construction site, Toronto

our office is planked by construction

it's so noisy and dusty,

sign of progress? foreign investment coming in?

that just shows we have plenty of real estate,

overpopulation is a myth, really.

The problem is something else.

Arlington Mill Community Center construction

Notre ami Denis nous partage son habileté lors de la construction d'une nouvelle poustinia.

Construction at the new Traders Village in San Antonio - October 2010.

My mother bought a greenhouse. It needed some construction. I did the Mechano-type bits and my brother did the concrete and timber foundations.

construction worker men boots

Construction begins at The Lorton Reformatory. Buildings will be adapted and repurposed for residential and commercial use to create Liberty–a modern and vibrant community hub in the heart of Lorton, Virginia. Liberty is located 25 miles from Washington, D.C. and 35 miles from Fredericksburg, Virginia.

 

thelibertylife.com

A few frames from the timelapse I'm doing for the construction of the stage for the Much Music Video Awards 2012 in Toronto.

HISTORY

 

Blackburn Meadows electricity generating station was built by the Sheffield Corporation in 1921,mainly to support the steel industry in the Lower Don Valley. The station was expanded in the 1930s, requiring the construction of Cooling Towers 6 and 7 in 1937-8 to supplement earlier square cooling towers to the north east.

 

These new hyperbolic shaped towers were designed by LG Mouchell and Partners. This was the same partnership responsible for the first hyperbolic cooling towers in the country (built in Liverpool in 1925) and some 150 towers subsequently built across the United Kingdom. Blackburn Meadows was one of those power stations nationalised to form part of the National Grid after the Second World War. It was decommissioned and mainly demolished in the 1970s.

 

ASSESSMENT

 

The Blackburn Meadows cooling towers are nationally rare surviving remains of pre-nationalisation large scale electricity generation. They are thought to be the only pre-1950 hyperbolic cooling towers surviving nationally, with nearly all the other 500 or so towers in the country dating to 1960or later. In addition to their early date, the association with LG Mouchell, the design features such as the banding and the thinness of the shell all give the towers interest. The addition of the spray coating of concrete following the 1964 disaster at Ferrybridge adds further interest by showing a development in the industry.

 

Even without the clouds of steam that signify operational examples, the cooling towers are also very prominent landmark features, providing a visual indication of the former scale and importance of the Sheffield steel industry in the Lower Don Valley.

 

However the two hyperbolic cooling towers are just one component of an extensive complex that formerly existed. The plant at Blackburn Meadows generated electricity by using steam turbines to turn electric generators, with the steam produced using coal fired boilers, the coal supplied by rail.

 

The railway system, coal handling plant, boiler complex, turbine and generating halls, as well as the switchgear for connecting the plant to the electricity grid and the earlier square cooling towers have all been lost. Water used by the steam turbines would have been maintained within a closed system, the steam leaving the turbine then passing through a condenser to change it back to hot water before being reboiled to produce steam to turn the turbine.

 

The cooling towers were used to cool water circulating in a separate system that was used to cool the condensers other equipment.

 

With the demolition of the rest of the generating station, the surviving cooling towers have lost their context so it is difficult to see how they functioned as an integrated part of a much wider plant.

 

Functionally, cooling towers still in use consist of far more than just the shell of the tower that survives at Blackburn Meadows. In operation, water is piped into the lower portion of the cooling tower into a complex network of pipes or troughs ending with sprinklers.

 

A fine mist of water is then sprayed on to a timber or asbestos lattice of staging and screens filling the lower 4-5m of the tower, with the water being cooled via natural evaporation aided by air being drawn upwards by the tower above. Any water droplets carried by this updraft are intercepted by a layer of louvers positioned above the sprinklers. In addition, operational cooling towers have a network of maintenance access ways. All bar one pipe in one of the towers has been stripped out from the cooling towers at Blackburn Meadows, leaving very little indication of how the towers actually functioned.

 

The Blackburn Meadows cooling towers are thus not only a very partial survival of an electricity generating station, they are also only a very partial survival of a pair of cooling towers. Even given the national context of the highly fragmentary survival of the pre-nationalisation power generation industry, designation of the Blackburn Meadows cooling towers cannot be justified.

 

The rest of the generating station has been lost, depriving the towers of their functional context and the loss of pipe work, staging, screens and access ways means that a highly significant part of the interest of the towers as cooling towers has also been lost.

 

www.tinsley-towers.org.uk/pages/english_heritage.pdf

 

If you’ve ever driven into Sheffield from the M1, you’ll be familiar with the Tinsley Cooling Towers - a piece of industrial landscape that’s become one of the city’s most famous landmarks. For now at least.

 

Three quarters of the public want them saved

 

The BBC online poll established www.bbc.co.uk/southyorkshire/content/image_galleries/tins… that three quarters of the public want them saved. This makes more than half a million supporters in Sheffield and Rotherham alone. E.ON’s own poll was flawed by a mix-up of criteria.

 

English Heritage wrote www.tinsley-towers.org.uk/pages/english_heritage.pdf that the Towers, built in 1938, are the oldest surviving hyperbolic Cooling Towers in the UK and that their prominence provides a visual indication of the former scale and importance of Sheffield’s steel industry.

from the series CONSTRUCTION

These machines are all over the city breaking up rock for construction

This is a remodeling project under construction by Brock Builders. We are general contractors in Asheville.

June 17, 1987 - walkway near complete

No idea what's being built but it looks like interesting architecture.

新宿南口。再開発の工事中。雑然とした通路やむき出しの柱にわくわくする。

I had an opportunity to explore the construction site for the future city centre and captured a few interesting perspectives.

Photos illustrating the construction progress of the IBCPA. February 14, 2014.

Construction at John White Boatbuilders , Garston.

Berlin - Unter den Linden

Fulton Street Transit Center construction progress as of March 17, 2011.

A local news cameraman was filming the construction of the future Olga's Diner during my photo shoot.

This mall has been undergoing construction on-and-off for at least 5 years. I just wish they'd finish it already because it's going to be impressive when it's done.

1 2 ••• 18 19 21 23 24 ••• 79 80