View allAll Photos Tagged arrays!!!
The starting signal at the end of the second platform ,looking towards Chilcompton, together with the shunt signal that allows trains to proceed into the siding.
Somerset and Dorset Railway Heritage Trust
Midsomer Norton, Somerset
7 March 2020
A new lighting array is tested on Iowa’s Capitol to bring out the natural colors of the building at night. 4/5/2016 Photo by John Pemble
In de naast de bestuurskamer gelegen wasruimte voelt de Koogse zich als een vis in het water (foto: Jan Wit).
Solar array commissioned at IBEW Local 48 headquarters
Clif Davis, left, IBEW Local 48 Training Director, and Rod Belisle, NECA/IBEW Training Center Director, check out the panels for the solar array at the IBEW Union Hall in Northeast Portland. The 360 panels were installed recently and will be commissioned Saturday in a 10 a.m. ceremony. The 78-kilowatt array will provide 40 percent of the building’s electrical usage for the next 30 years. The array also is being used to train electrical apprentices how to install the panels. Sen. Ron Wyden, ex-Gov. John Kitzhaber and other politicians are scheduled to attend the ceremony, along with Local 48 members and construction industry well-wishers. The public is invited to attend.