View allAll Photos Tagged adding
Ken and Matthew are finishing adding the boards to the ceiling and the walls to improve the overall strength of the structure and to allow support for the wiring they will run inside, from where it enters to each outlet and or switch.
Ready to be baked for a second time. Using a little liquid sculpey as an adhesive, I added more clay to build up some areas. I decided to stop here because I kept having to go back and fix the sharp edges as I handled the model. That's usually a good sign that it's time to bake again.
The DASJH boys team. Jacob LaBonte, Ed Sherman, Leif Kostrzewa, Daniel Caspers, Noah LaBonte, Joshua LeSac, Elijah Anumolu, John Klave, Joshua Anumolu.
Pallet racking installed at ADD Express in Elland, West Yorkshire totaling 2700 pallet locations - completed May 2012
Faith runs the 2nd leg, and Zipporah gets the baton for the 3rd. We are staying close in the 3-team race.