View allAll Photos Tagged Telehandlers
My Lego telehandler is loosely based on CAT TL642. Buwizz and iPad are used to control it remotely. There are four motorized functions: drive with PF L motor, boom elevation with PF L motor, fork tilt with M motor, and steering with PF servo. Front wheels are driven through a differential, and the rear axle has a simple suspension. Overall, it is maneuverable, easy to control thanks to the proportional control of Buwizz, and very fun to play with. Please watch the video for a demonstration. When sharing, please include the link to my instagram www.instagram.com/legomarat/
BTS Train Model Project
CEA were employed to receive, transport and unload three 40ft HC containers form Japan. Each container contained parts of a full scale wooden model of a Bangkok Mass Transit System (BTS) car. The model was to be put on display at the BTS Headquarters in Bangkok.
CEA received the containers at Laem Chabang port and facilitated all the necessary customs paperwork. The containers were loaded on to flatbed trailers and transported to the BTS site in Bangkok.
A 55 t mobile crane, a 3.5 t Forklift, a 5 t Telehandler and Hiab truck also made the journey to Bangkok as these would be used for unloading and unstuffing the containers.
Upon arrival in Bangkok CEA began the unloading and unstuffing procedure. The parts were moved to a purpose built display area for erection.
CEA assisted in the erection of the model alongside a specialised design team from Japan. After the model was complete CEA demobilized all the equipment and returned to Laem Chabang.
Equipment Used
55 t Mobile crane
5 t Telehandler
3.5 t Forklift
Hiab Truck
Isuzu DECA 360 Prime movers
Flatbed trailers
Farrans / Dalriada Water Project Alpha Ballinrees WTW site. 17 metre JCB brought in for internal installation works.
BTS Train Model Project
CEA were employed to receive, transport and unload three 40ft HC containers form Japan. Each container contained parts of a full scale wooden model of a Bangkok Mass Transit System (BTS) car. The model was to be put on display at the BTS Headquarters in Bangkok.
CEA received the containers at Laem Chabang port and facilitated all the necessary customs paperwork. The containers were loaded on to flatbed trailers and transported to the BTS site in Bangkok.
A 55 t mobile crane, a 3.5 t Forklift, a 5 t Telehandler and Hiab truck also made the journey to Bangkok as these would be used for unloading and unstuffing the containers.
Upon arrival in Bangkok CEA began the unloading and unstuffing procedure. The parts were moved to a purpose built display area for erection.
CEA assisted in the erection of the model alongside a specialised design team from Japan. After the model was complete CEA demobilized all the equipment and returned to Laem Chabang.
Equipment Used
55 t Mobile crane
5 t Telehandler
3.5 t Forklift
Hiab Truck
Isuzu DECA 360 Prime movers
Flatbed trailers