View allAll Photos Tagged Structures

The home I grew up in. A little de-saturated... to reflect how vivid memories can fade. Taken from a low angle in an attempt to recreate the vantage point of a 7 year old girl.

Storm chasing USA 2013 with Silver Lining Tours

Walnut Street Bridge, Chattanooga, Tn

Exposition des "structures sonores" de François et Bernard Baschet, pendant le festival les hivernautes à Quimper (France) en février 2007

 

Exhibition of the sound structures of François and Bernard Baschet, during the festival 'hivernautes' in Quimper (France) in February 2007.

 

urzhiata.emoc.org/structures-sonores-baschet.html

Graphic design in nature

OLYMPUS DIGITAL CAMERA

Get best cash with profit you required when you sell your structured settlement or annuity

Venice Biennale 2010

"Decay of a dome"

Designed by:

Amateur architecture studio

 

More info:

www.world-architects.com/amateur/

  

A new perspective on a favourite subject.

Camera Test: Nikon Z5

FTZ Adapter

Lens Test: Nikkor-S 35mm 1:2.8 non-Ai

 

A little further down the road I came to the railroad crossing at Alpine. This interesting structure appears to be a cistern of sorts. It could have been built by the Chesapeake and Ohio railroad which is the progenitor of the CSXT that currently is the name of the corporation. This location is at a creek where it empties into the James River, and the structure was apparently a water storage facility. More on that in another photo.

 

I didn't bother to change the camera from Bright Sunshine to Shade as I felt there was enough light to overcome the color cast that comes with the shadows. It's close, but nothing to really complain about.

 

No Corrections.

Composition avec Photoshop, Gimp et ACDSee Ultimate

Standards are the platform of all telecommunications networks. They establish guidelines and recommend best practices for every aspect of telecommunications cabling systems from network design and installation to cable performance and verification. You can read more about key cabling infrastructure standards in our new White Paper: www.blackbox.com/resource/genPDF/White-Papers/Structured-...

Pont sur l'Yonne à Cezy (89)

Paint colors, signage and graphics are going being installed inside PS5!

 

---

Located by the main entrance to the Sacramento State campus, Parking Structure V is designed to blend and complement the dense trees of the nearby arboretum. Replacing existing Parking Lot 1, the 1,750 stall, six-level parking structure serves a campus in dire need of parking, and provides a structure exceeding the quality and efficiency of any of the previous parking facilities.

 

The structure’s skin creates a dialog with the surrounding trees. Combined with columnar trees, the facade is dressed with vertical fins painted in tints of green. The thousands of individual square fins are a digital representation of nature, and form patterns like leaves of a tree canopy overhead. Covering the three upper levels of the structure, precast concrete is textured with a pattern that nods to the rough bark of the birch trees in the adjacent arboretum.

 

Serving a sizable percentage of the campus’ parking need, automobile circulation is designed to move traffic into the structure as efficiently as possible with queuing space off-street to handle periods of high volume. Taking advantage of Clark Pacific’s Total Precast architectural concrete system, the design quality and level of material finish is second to none. Because of the increased erection speed possible with the precast solution, the overall project schedule is more aggressive and intended to be completed over a single school semester.

 

The technology, design, innovations, placemaking and conservation programs implemented at Parking Structure V allow it to achieve a Parksmart Gold certification by the Green Parking Council, making it the highest-performing, most-sustainable parking structure on campus.

 

The Visitors Center, to be built after the parking structure is completed, will house UTAPS offices and areas to welcome campus guests and the media.

I took a billion pictures, and none of them are as good as the real thing.

Today something what's simple, but not less amazing. Only the structure of a leave.

Still playing with this new structure

Iv driven past this low small brick building which is behind a wall but iv got no idea what it is anyway its on the A259 Old London Road right by the junction with Robertsons Hill Hastings ...

www.google.co.uk/maps/@50.865448,0.598029,3a,90y,303.62h,...

 

Recently I went out to shoot a photo that represents "inspiration". This photo captures lots of it for me. Texture, pattern, type, urban, color, nature, structure and so on. I pull from all these things for my photography and design work. I am involved in a weekly theme, so more to come.

Olympus XA2 and Eastman 5222

RAF Upper Heyford: A Structure

 

SAC Nuclear trigger store

Commercial Structure Fire

4-22-2015

Wilco, NC 42 West at I-40

Electrical fire in the bathroom

 

Cleveland, Clayton, Garner FD

EMS24, Medic2

Exposition des "structures sonores" de François et Bernard Baschet, pendant le festival 'les hivernautes' à Quimper (France) en février 2007

 

Exhibition of the sound structures of François and Bernard Baschet, during the festival 'hivernautes' in Quimper (France) in February 2007.

 

urzhiata.emoc.org/structures-sonores-baschet.html

Firefighters responded to a working structure fire Thursday, December 8, 2011. Jackson Township members were toned out at 2:52 p.m. for a reported fire on Country Street NW. En route units called in, reporting seeing smoke from Arlington Avenue, and called in a working fire. when units got on scene, they stretched lines up a winding driveway to the structure. Due to tree cover, firefighters were unable to use their Tower Ladder on the house's roof. Close to a mile of supply line was laid out to the trucks near the structure from the closest hydrants, which eventually led to a shutdown of Strausser Street to allow the deployment of the hose to apparatus. Mutual aid was requested from several neighboring departments to help control the blaze. Firefighters eventually got control of the fire by around 7:30 p.m. In total, eight different departments arrived on scene, including Jackson Township, Canal Fulton, Lawrence Township, Green, New Franklin, Plain Township, North Canton, and Massillon.

Commercial Structure Fire

4-22-2015

Wilco, NC 42 West at I-40

Electrical fire in the bathroom

 

Cleveland, Clayton, Garner FD

EMS24, Medic2

1 2 ••• 41 42 44 46 47 ••• 79 80