View allAll Photos Tagged Structure,

FIONA project concept building 10

Twain Harte Ditch Trail

Structures opening The Recorrupt Tour in Grand Rapids, MI

Structure Security conference at the Golden Gate Club in San Francisco on Tuesda & Wednesday September 27-28, 2016

This image captures the idea that structure is needed to build knowledge. That is the way our book teaches argument writing using the H2W method: with specific pieces that go in a specific place so that when it is assembled, it makes a whole piece.

At 1:43AM on March 10, 2025, the Los Angeles City Fire Department responded to a reported structure fire in the 1300 block of S Flower Street in Downtown Los Angeles.

 

Firefighters arrived to find a mixed two and one story commercial building (combined 13,000 sq feet), site of a previous burn, with heavy fire in the one-story portion at the back. Crews initiated an offensive attack on the fire in the one-story section and were able to knock the bulk of the fire down in about 15 minutes. However, the situation escalated as flames rapidly spread into the adjacent one-story commercial building.

 

Approximately 20 minutes into the incident, smoke and fire were visible in separate, one-story commercial building (8,850 sq feet), two doors to the south. The Incident Commander swiftly redirected fire companies and expanded the operation, designating the growing fire as "Branch 1" to ensure effective communication and proper control over the complex scene.

 

While firefighters initially deployed an offensive fire attack, the fire burned through the roof and remaining interior became untenable. Crews transitioned to a defensive operation and deployed master streams via ladder pipes and large diameter hand lines. They fought the heavy fire for over an hour and successfully defended two exposed buildings (auto body shop adjacent and four-story apartment building to the rear) from damage. Occupants of the apartment building were able to safely shelter in place and no evacuation was required.

 

With over 100 firefighters on scene, operating under the leadership of Assistant Chief Douglas Lewis, a knockdown on all three structures was declared at 3:20AM.

 

LAFD Heavy Equipment responded to assist with overhaul, using the Thermite RS3 Robotic Firefighting Vehicle to access the areas deemed dangerous due to structural instability and an excavator move debris.

 

During overhaul operations, one firefighter sustained a minor hand injury. There were no reported injuries to civilians.

 

LAFD Arson and Counter-Terrorism Section (ACTS) responded to the scene and are conducting an ongoing investigation.

 

LAFD Incident 031025-0101

 

Photo Use Permitted via Creative Commons - Credit: LAFD Photo | Cody Weireter

 

Connect with us: LAFD.ORG | News | Facebook | Instagram | Reddit | Twitter: @LAFD @LAFDtalk

Parking Structure 4 at UC Davis Health’s Sacramento campus is a successful example of a human-centered design solution for an urban medical center. Designed for flow and a safe user experience, the entry and exits to the south side of the structure were relocated from the original plan so vehicular traffic is segregated from the pedestrian flow. This offers the user clarity and sets the tone for various wayfinding and lighting strategies. The use of ECO Falcon cameras for available stall detection and LED lighting provide the most technologically advanced systems available for the parking structure.

 

Reinforcing the horizontality of the campus’ aesthetics, integral color and form liners throughout the precast elements provide textures and tones. The structural layout reduces columns and increases opening sizes, focusing daylight into the center of the structure. Level indicators are located clearly on column faces, combined with directional signage.

 

Site design promotes a safe and intuitive user experience. Landscaping softens the impact of the structure on the surrounding residential neighborhood and integrates a nature walk with native species. Shuttle stops, bike shelters and bike share options are available at the main pedestrian exits, giving users safe access to their last mile of transportation. Security is intentional yet not obvious; implementing CPTED best practices.

 

Parking Structure 4 is designed to achieve Parksmart Silver certification.

 

Photo by Kyle Jeffers.

Structured: An exhibit of work by nine artists at Spattered Columns, 491 Broadway (near Broome), 5th Floor, NYC

April 14th through May 13th

www.structuredshow.com

 

William Dutterer

Sara Eichner

Austin Kennedy

Nathan Kensinger

Mike Neff

Heidi Neilson

Lauren Pascarella

Eliza Stamps

Matthew Trygve Tung

 

Curated by Jeff Bergman

 

Installation Photos by Austin Kennedy

A major fire rips through a large occupied 3 story wood frame on Robbins St displacing 11 people

Controlled training burn in Rocklin Ca. An old dance hall that Johnny Cash played at,

 

Rocklin Fire was the lead agency.

 

Several agencies from Placer County attended for training that is so hard to come by now adays.

 

I would list fire agencies that attended but wold leave some out.

Second fire of the day it was spotted by crews responding to another structure fire about a mile away

Icehotel, Jukkasjärvi, Sweden

DOWNTOWN LA - At 6:11AM on January 7, 2025, the Los Angeles City Fire Department responded to a structure fire at 1224 S Hope St. Firefighters arrived to find a vacant two-story commercial building well-involved with fire. Several ladder pipes were utilized in defensive mode, and incident command was able to declare a knockdown of the fire in approximately 1 hour and 20 minutes. Firefighters prevented fire spread beyond the involved structure, and no injuries were reported.

 

© Photo by Gary Apodaca

 

LAFD Incident: 010725-0309

 

Connect with us: LAFD.ORG | News | Facebook | Instagram | Reddit | Twitter: @LAFD @LAFDtalk

A concrete structure near the mineshaft. This structure housed a fan that was used to vent the Franklin mine of dangerous gases. The mine has a tragic past, with both a major fire and a fatal riot.

Metallic structure sitting and I feel in a mars photo release by NASA

Pentax PC35AF-M // Kodak Gold 200

Work by Jason Falls 2021

Pose de structure aluminium pour intégration panneaux photovoltaïques sur bâtiment agricole

Structure by nature and by human.

White Tissue Foil Paper 20-50 gsm/ 60 cm*60 cm

VRS Technologies a leading structured cabling services company in Dubai. We are offering reliable structured cabling solutions and services by industry experts.For more contact us at 971551683152.

www.vrstechdxb.com/structured-cabling-services-and-soluti...

The lifebook4life-team got a guided tour through the Fujitsu factory in Augsburg

Der Erbeskopf ist mit 816m. Die höchste Erhebung in Rheinland-Pfalz. Er ist gleichzeitig höchster Berg im Mittelgebirge Hunsrück und der höchste deutsche linksrheinische Berg.

Snap shot of Blogitive Directory structure on OneBlogTooMany.com

The wooden structure from afar.

1 2 ••• 59 60 62 64 65 ••• 79 80