View allAll Photos Tagged StructuralSteel
Structural steel for the Integrated Sciences Complex arrived on Wednesday, December 21, and the steelworkers have been busy erecting two stories of columns and beams on the north wing. The university community will see the ISC take shape as steel continues to go up and metal decks, concrete slabs and fireproofing are installed through the spring.
Photos by Harry Brett
Stewart and Sons crane lifts the new sugar grader onto the top floor in the Millaquin Sugar Refinery.
Structural steel for the Integrated Sciences Complex arrived on Wednesday, December 21, and the steelworkers have been busy erecting two stories of columns and beams on the north wing. The university community will see the ISC take shape as steel continues to go up and metal decks, concrete slabs and fireproofing are installed through the spring.
Photos by Harry Brett
The Angel of the North is a contemporary sculpture, designed by Antony Gormley, located in Gateshead, Tyne and Wear, England.
Completed in 1998, it is a steel sculpture of an angel, 20 metres (66 ft) tall, with wings measuring 54 metres (177 ft) across. The wings do not stand straight sideways, but are angled 3.5 degrees forward; Gormley did this to create "a sense of embrace". The angel like much of Gormley's other work is based on a cast of his body.
It stands on the hill of Birtley, at Low Eighton in Lamesley, overlooking the A1 and A167 roads into Tyneside, and the East Coast Main Line rail route, south of the site of Team Colliery.
Work began on the project in 1994, and cost £800,000. Most of the project funding was provided by the National Lottery. The Angel was installed on 15 February 1998.
Due to its exposed location, the sculpture was built to withstand winds of over 100 mph (160 km/h). Thus, foundations containing 600 tonnes (590 long tons; 660 short tons) of concrete anchor the sculpture to rock 70 feet (21 m) below. The sculpture was built at Hartlepool Steel Fabrications Ltd using COR-TEN weather-resistant steel. It was made in three parts—with the body weighing 100 tonnes (98 long tons; 110 short tons) and two wings weighing 50 tonnes (49 long tons; 55 short tons) each—then brought to its site by road. The components were transported in convoy—the body on a 48-wheel trailer—from their construction site in Hartlepool, up the A19 road to the installation site 28 miles (45 km) away; the nighttime journey took five hours and attracted large crowds.
The Angel aroused some controversy in British newspapers, at first, including a "Gateshead stop the statue" campaign, while local councillor Martin Callanan was especially strong in his opposition. However, it has since been considered to be a landmark for North East England and has been listed by one organisation as an "Icon of England". It has often been used in film and television to represent Tyneside, as are other local landmarks such as the Tyne Bridge and the Gateshead Millennium Bridge.
The sculpture is also humorously known by some local people as the "Gateshead Flasher", because of its location and appearance
Structural steel for the Integrated Sciences Complex arrived on Wednesday, December 21, and the steelworkers have been busy erecting two stories of columns and beams on the north wing. The university community will see the ISC take shape as steel continues to go up and metal decks, concrete slabs and fireproofing are installed through the spring.
Photos by Harry Brett
Structural steel for the Integrated Sciences Complex arrived on Wednesday, December 21, and the steelworkers have been busy erecting two stories of columns and beams on the north wing. The university community will see the ISC take shape as steel continues to go up and metal decks, concrete slabs and fireproofing are installed through the spring.
Photos by Harry Brett
Structural steel for the Integrated Sciences Complex arrived on Wednesday, December 21, and the steelworkers have been busy erecting two stories of columns and beams on the north wing. The university community will see the ISC take shape as steel continues to go up and metal decks, concrete slabs and fireproofing are installed through the spring.
Photos by Harry Brett
Structural steel for the Integrated Sciences Complex arrived on Wednesday, December 21, and the steelworkers have been busy erecting two stories of columns and beams on the north wing. The university community will see the ISC take shape as steel continues to go up and metal decks, concrete slabs and fireproofing are installed through the spring.
Photos by Harry Brett
The large crane will leave the Integrated Sciences Complex site as ironworkers near the end of installing structural steel. Crews are pouring concrete for the floors in the new building.
Photos by: Harry Brett
Structural steel for the Integrated Sciences Complex arrived on Wednesday, December 21, and the steelworkers have been busy erecting two stories of columns and beams on the north wing. The university community will see the ISC take shape as steel continues to go up and metal decks, concrete slabs and fireproofing are installed through the spring.
Photos by Harry Brett
September 11, 2024 - This evening we attended a Red Heritage Indigenous Cultural Performance at the Red Heritage Indigenous Entertainment Hall at 644 N Navajo Drive in Page, Arizona.
The large crane will leave the Integrated Sciences Complex site as ironworkers near the end of installing structural steel. Crews are pouring concrete for the floors in the new building.
Photos by: Harry Brett
The large crane will leave the Integrated Sciences Complex site as ironworkers near the end of installing structural steel. Crews are pouring concrete for the floors in the new building.
Photos by: Harry Brett
Construction materials on 230th Street between Heath Ave and Kingsbridge Terrace. I believe this was actually not a street but old city steps that are being replaced. Does anyone know the story here? Image Bx 230St 019 shows a wider view.
Structural steel for the Integrated Sciences Complex arrived on Wednesday, December 21, and the steelworkers have been busy erecting two stories of columns and beams on the north wing. The university community will see the ISC take shape as steel continues to go up and metal decks, concrete slabs and fireproofing are installed through the spring.
Photos by Harry Brett
Structural steel for the Integrated Sciences Complex arrived on Wednesday, December 21, and the steelworkers have been busy erecting two stories of columns and beams on the north wing. The university community will see the ISC take shape as steel continues to go up and metal decks, concrete slabs and fireproofing are installed through the spring.
Photos by Harry Brett
The large crane will leave the Integrated Sciences Complex site as ironworkers near the end of installing structural steel. Crews are pouring concrete for the floors in the new building.
Photos by: Harry Brett
The large crane will leave the Integrated Sciences Complex site as ironworkers near the end of installing structural steel. Crews are pouring concrete for the floors in the new building.
Photos by: Harry Brett
Structural steel for the Integrated Sciences Complex arrived on Wednesday, December 21, and the steelworkers have been busy erecting two stories of columns and beams on the north wing. The university community will see the ISC take shape as steel continues to go up and metal decks, concrete slabs and fireproofing are installed through the spring.
Photos by Harry Brett
Structural steel for the Integrated Sciences Complex arrived on Wednesday, December 21, and the steelworkers have been busy erecting two stories of columns and beams on the north wing. The university community will see the ISC take shape as steel continues to go up and metal decks, concrete slabs and fireproofing are installed through the spring.
Photos by Harry Brett
The large crane will leave the Integrated Sciences Complex site as ironworkers near the end of installing structural steel. Crews are pouring concrete for the floors in the new building.
Photos by: Harry Brett
Structural steel for the Integrated Sciences Complex arrived on Wednesday, December 21, and the steelworkers have been busy erecting two stories of columns and beams on the north wing. The university community will see the ISC take shape as steel continues to go up and metal decks, concrete slabs and fireproofing are installed through the spring.
Photos by Harry Brett
Structural steel for the Integrated Sciences Complex arrived on Wednesday, December 21, and the steelworkers have been busy erecting two stories of columns and beams on the north wing. The university community will see the ISC take shape as steel continues to go up and metal decks, concrete slabs and fireproofing are installed through the spring.
Photos by Harry Brett
Structural steel for the Integrated Sciences Complex arrived on Wednesday, December 21, and the steelworkers have been busy erecting two stories of columns and beams on the north wing. The university community will see the ISC take shape as steel continues to go up and metal decks, concrete slabs and fireproofing are installed through the spring.
Photos by Harry Brett
The large crane will leave the Integrated Sciences Complex site as ironworkers near the end of installing structural steel. Crews are pouring concrete for the floors in the new building.
Photos by: Harry Brett
Structural steel for the Integrated Sciences Complex arrived on Wednesday, December 21, and the steelworkers have been busy erecting two stories of columns and beams on the north wing. The university community will see the ISC take shape as steel continues to go up and metal decks, concrete slabs and fireproofing are installed through the spring.
Photos by Harry Brett
Structural steel for the Integrated Sciences Complex arrived on Wednesday, December 21, and the steelworkers have been busy erecting two stories of columns and beams on the north wing. The university community will see the ISC take shape as steel continues to go up and metal decks, concrete slabs and fireproofing are installed through the spring.
Photos by Harry Brett
The large crane will leave the Integrated Sciences Complex site as ironworkers near the end of installing structural steel. Crews are pouring concrete for the floors in the new building.
Photos by: Harry Brett
Structural steel for the Integrated Sciences Complex arrived on Wednesday, December 21, and the steelworkers have been busy erecting two stories of columns and beams on the north wing. The university community will see the ISC take shape as steel continues to go up and metal decks, concrete slabs and fireproofing are installed through the spring.
Photos by Harry Brett