View allAll Photos Tagged Scraper,

2009_07_02_Rotterdam_SAM_NL_0339-2

"Gran parte del marmo estratto viene mantenuto allo stato di blocco non lavorato e inviato direttamente al porto di Marina di Carrara che gestisce tutt'oggi la maggior parte delle spedizioni, soprattutto all'estero. Quasi tutto il resto del marmo estratto viene invece ridotto in lastre di diverso spessore e poi lucidato a fornire materia prima per pannelli, ornamenti, scale, e altri accessori in marmo."

Louisville, Colorado is destroying all their beautiful open space with housing developments. I'm sure they believe they are "progressing." The American system is st up so that cities think they need to grow to bring in more tax revenues but then the growth requires more money and the cycle continues. Such a shame.

Tractor Supply Co. building site in Cottonwood, AZ.

It runs on top of the third rail scraping off the snow and ice that builds up.

E213 --- Hide Scraper --- Wood, Stone, & Rawhide; Inupiaq, Alaska. Donor Unknown.

Poly modeling mesh (Subdivision)

Model wykonany na zlecenie firmy Modii3d - www.modii3d.com

Dubai Skyscrapers, Shaikh Zayed Road looking towards south. The Sheikh Zayed Road is home to most of Dubai's skyscrapers, including the Emirates Towers. The highway also connects other new developments such as the Palm Jumeirah and Dubai Marina. The road has most of the Red Line of Dubai Metro running alongside it. In Dubai itself much of the highway has five lanes in each direction.

The Sydney–Melbourne co-axial cable was a major telecommunications engineering and construction project in south-eastern Australia in the early 1960s, designed to significantly increase telecommunications transmission capacity between Sydney and Melbourne and other centres, along its route including Canberra.

 

The cable's route was approximately 960 kilometres and roughly followed the Hume Highway as it existed at that time. Key points along the route were Sydney–Liverpool–Campbelltown–Bowral–Goulburn–Canberra–Yass–Gundagai–Wagga Wagga–Culcairn–Albury–Wangaratta–Benalla–Euroa–Seymour–Melbourne.

 

It was five years in the making and cost £6.89 million to complete. Its prime purpose was to boost the capacity for telecommunications between the two major cities. The cable was made up of three pairs of tubes, each pair capable of carrying 1,260 simultaneous telephone connections.

That's a big ol' tire but just 4 hold up a machine that's over 102,000 pounds empty.

Scraping at Weeting Steam Show with a Caterpillar 631C scraper.

Bad breath has multiple causes, but few people expect their tongues to be the primary culprit.

 

We are often taught that brushing and flossing your teeth is enough to eliminate the bacteria that causes bad breath, otherwise known as halitosis.

Woods Grading Scrapers are ideal for landscapers, farmers, and municipalities that need to shape and restore driveways, roadways, show arenas, or baseball diamonds to pristine condition.

Heading north towards Port Augusta on HWY1.

Cat 140H2 Grader and Cat 631G Scraper at a highway widening project on Arizona's State Highway 260 between Cottonwood and Camp Verde.

I'll be back when it is totally complete.

The guy couldn't play a note, let alone a song. Have to wonder where he got the instrument.

See the set for more pages.

 

LaPlant Choate earth mover. Any help on model designation would be appreciated.

 

Another great illustration

1 2 ••• 25 26 28 30 31 ••• 79 80