View allAll Photos Tagged Report
AFC Wimbledon 0, Hampton and Richmond Borough 1. Ryman League Premier Division. Kingsmeadow, 7th October 2006.
2012 MED Report - Towards Green Growth in the Mediterranean Countries. Photo: Ibrahim Ajaja / CMI / World Bank
This “software entertainment technology report” gives some details about the founding of Origin Systems and looks at the state of the company in 1991 (when the report was authored). It goes into detail about a number of new and upcoming games at the time – Ultima Underworld, Martian Dreams, Ultima 7, Wing Commander 2, and Strike Commander – and looks at the “electronic games revolution” and the changes in the gaming industry.
Read more: gallery.ultimacodex.com/origin-software-technology-report/
UNICEF, the Ministry of Women and Social Affairs, the Ministry of Innovation and Technology, and the Ethiopian Youth Council launched U-Report, a digital platform designed to empower adolescents and young people in Ethiopia.
Working with young people, the platform aims to shape policies and decisions at all levels. © UNICEF Ethiopia/2024/
Independent road safety report for work contracted by the Ministry of Transportation (MOT) in BC for the area of Emerald to Kewit Depot at river on HWY 99 on February 26, 2009 in Whistler BC Canada. Highway maintenance handled by Maindroads Howe Sound Contracting.
Use a Twoonie to measure the depths when you see one in some photos.
The maintenance is handled from day to day by Mainroads Howe Sound Contracting in conjunction with MOT.
It is the recommendation of the report as follows:
1. Fix Road Drop Offs on road as noted
2. Reduce speed of zone from Function to Bayshores to 60 kms / hr due to excessive speeding and substance abuse.
3. Re-pave the road lines. Missing road lines both white and yellow are extremely dangerous at Nordic entrance. No white line to mark edge of road found at over 50% overall of area.
Please refer to section 8.5.15 Drop Offs of the government document titled MOT Traffic Management Guidelines linked below that applies to construction zones.
www.th.gov.bc.ca/publications/eng_publications/geomet/tra...
8.5.15 Drop-offs - MOT Traffic Management Guidelines
The Proponent shall conduct all operations to minimize any drop-offs (abrupt changes in roadway elevation) left exposed to traffic during non-working hours. Unless otherwise
specified in the Traffic Control Plan, drop-offs left exposed to traffic during non-working hours shall be delineated as follows:
• Drop-offs up to 60 millimetres, unless otherwise specified on the Traffic Control Plan, may remain exposed with appropriate traffic control devices alerting
motorists of the condition. However, no drop-offs shall be allowed between adjacent lanes of traffic.
• Drop-offs more than 60 millimetres that are in the roadway or shoulder shall be delineated with appropriate traffic control devices and further delineated as
indicated in 3(c) below.
• Drop-offs more than 60 millimetres, but not more than 300 millimetres, that are not within the roadway or shoulder shall be delineated with appropriate traffic
control devices and further delineated by having one of the following:
a) A wedge of compacted stable material (25 mm well-graded crushed base course aggregate or better) placed at a slope of 4:1 or flatter.
b) Channelizing devices (Type 1 barricades, plastic safety drums, or other devices one meter or more in height) placed along the traffic side of the dropoff
and a new edge of pavement stripe placed a minimum of two (2) metres from the drop-off. Appropriate traffic control devices shall be placed in
advance of and throughout the drop-off treatment.
c) Temporary concrete barrier or other approved barrier installed on the traffic side of the drop-off with 300 millimetres between the drop-off and the back of
the barrier and a new edge of pavement stripe a minimum of 500 millimetres from the face of the barrier. An approved terminal, flare or impact attenuator
shall be required at the beginning of the section. For night use, the barrier shall have reflective markers and/or warning lights.
This document linked below outlines the BC MOT TAC Rural Undived highway build specifications for a normal non-consruction zone.
www.th.gov.bc.ca/publications/eng_publications/geomet/TAC...
Please refer to reference measurement information linked below.
www.mint.ca/store/mint/learn/circulation-currency-1100028
$2 Dollar CAN Coin 1996 to date
Diameter (mm): 28
Thickness (mm): 1.8
60 mm according to design specification section 8.5.15 of MOT Traffic Management Guidelines dived by a 28 mm coin measurement is 2.14.
In the photos below an overall depth calculation beyond a 2.14 measurement in coins as reference is in default of the MOT Traffic Management Guidelines
minimum build specifications.
Bharat Book Bureau has announced the addition of the "2013 U.S. Music Publishing Industry" report to their offering. U.S. Music Publishing Industry-Capital & Expenses Report, published annually by contains timely and accurage industry statistics, forecasts and demographics. www.bharatbook.com
Recovered files from a Quantel HAL videographics system. Appears to have been used at the BBC News department in the mid 2000s. Includes graphics from Newsround, Sportsround, News 24, Newsnight etc. All images are 720*576 but some are anamorphic widescreen so will appear vertically stretched.
A Stroud woman has been reported missing. Adele Perrett,43, has been reported missing from Stroud but may be in Bath It is believed that Adele left in her silver Mercedes Benz with the registration number X776 FLD and may be driving to or in the area of Bath. Adele was last seen on Gardener’s Rest at 11am yesterday morning, Sunday, June 30. She is described as being 5ft 2 inches tall, has olive skin and dark black hair. Adele ,who …
www.thetrafficseo.com/gloucestershire-news/stroud-woman-r...