View allAll Photos Tagged Report
Camacho's marketing guru's Angel Diaz and Dylan Austin party it up in the Big Apple at the Cigar Report Magazine Launch Party held at the Carnegie Club....
Lab Report created by a researcher at the Lab for Remixed Knowledge.
For more information about the Lab, visit: www.therealadamgood.com/lab/
This is what REPORT CARDS looked like in the school year 1946-1947. My Dad would have been in high school at this time and this would have been after he returned from serving in the army. The inside shows that he was taking a course labelled Rep. but he dropped it even though his grade was 80. What would Rep. have stood for? Another course is labelled MD3, what would that course have been, anyone know? He had better grades in Earth Science than I had in high school!! As we all know, parents or guardians are supposed to sign the back, so I don't know how my Dad got away with signing HIS OWN NAME (and that definitely IS his handwriting).
OBSERVATION REPORT
∞
RINGS
Color ring - B[ZSA.K]
Metallic ring - L925920
EURING code - 05910 - www.cr-birding.org/node/1063
Right leg (tarsus) Blue ring with a white four alpha code
Left leg (tarsus) - Metallic ring
Ringer - Eric Stienen (INBO)
Age at first ring - Pullus - Date - 2016.07.06
Place where ringed - Raversijde (VOC), West-Vlaanderen, Belgium
∞
SPECIES
Type of bird - Larus fuscus
Age & Sexe - immature - Unknown
∞
OBSERVATION
Date of the sighting - 26.09.2017 - Time: Afternoon
my sightings/2017: 6 - total of my sightings: 11
Place - Matosinhos beach, Matosinhos, Portugal
Coordinates: - 41.176885 – 8.693382
∞
LIFE HISTORY
Date - Location - Observer
06/07/2016 Raversijde (VOC), West-Vlaanderen, Belgium - VOC – Oostende
11/08/2016 Raversijde (Strand), West-Vlaanderen, Belgium VOC - Oostend
23.09.2016 Leça beach, Matosinhos, Portugal – José Marques
26.09.2016 Matosinhos beach, Matosinhos, Portugal – José Marques
10.10.2016 Leixões harbour, Matosinhos, Portugal – José Marques
18.10.2016 Matosinhos beach, Matosinhos, Portugal – Armando Mota
03.11.2016 Matosinhos beach, Matosinhos, Portugal – José Marques
06.12.2016 Matosinhos beach, Matosinhos, Portugal – José Marques
17.08.2017 Leixões harbour, Matosinhos, Portugal – José Marques
31.08.2017 Matosinhos beach, Matosinhos, Portugal – José Marques
01.09.2017 Leixões harbour, Matosinhos, Portugal – José Marques
06.09.2017 Matosinhos beach, Matosinhos, Portugal – José Marques
19.09.2017 Leça beach, Matosinhos, Portugal – José Marques
25.09.2017 Leça beach, Matosinhos, Portugal – José Marques
26.09.2017 Matosinhos beach, Matosinhos, Portugal – José Marques
∞
After the working groups met and brainstormed themes, questions and places for an international youth media production project, they came together to report back what they learned. The issues and questions are too many to list, but you can see what this group was discussing. One thing is absolutely certain: the youth who participated in the think tank are very thoughtful and sophisticated thinkers -- it gave us here at Listen Up! a lot to reflect on.
she seemed to be perhaps the only person in the crowd supporting the minutemen, but she wrote deport on the back of a Newsom sign (the minutemen had signs calling him a traiter).
March 27, 2013, Ottawa -The Canadian Journalism Foundation and Carleton University's School of Journalism and Communication presented two back-to-back panels featuring political reporters and politicians on how social media has changed the way they work.
OBSERVATION REPORT
∞
RINGS
Color ring - W[4.Z3]
Metallic ring - E6421
EURING code - 05910 - www.cr-birding.org/node/1178
Right leg (tarsus) - White ring with a black 3 alpha-numeric code
Left leg (tarsus) - Metallic ring
Ringer - Paul Veron
Age at first ring - Pullus - Date - 08.07.2008
Place where ringed - Brecqhou, SARK
∞
SPECIES
Type of bird - Larus fuscus [Lesser Black-backed Gull ]
Age & Sexe - Ad. - Unknown
∞
OBSERVATION
Date of the sighting - 29/09/2015 - my sightings/2015 - 3
Place - Leixões harbour, Matosinhos, Portugal
Coordinates: - 41.182341,-8.6971609
∞
LIFE HISTORY
Date - Location - Observer
08/07/2008 - Brecqhou, SARK – Paul Veron
24/11/2008 - Gafanha da Nazaré, Aveiro, Portugal – Peter Rock
01/09/2009 - Matosinhos, Porto, Portugal - Voesten, Rob & Stef Waasdorp
19/03/2010 - Boca do Río, Porto do Son, A Coruña - Cabeza, Juan
21/09/2010 - Matosinhos, Porto - Pastoriza Barreiro, Alberto
03,04/11/2010 - Matosinhos, Porto - Millais, Malcolm
11/09/2012 - Matosinhos, Porto - Millais, Malcolm
06/11/2012 - Afurada, Porto – Peter Rock
20/12/2012 – Matosinhos, Porto, Portugal – Paulo Dias
27/09/2013 - Douro River Estuary, Porto – Paulo Faria
28/09/2013 – Angeiras, Matosinhos, Porto, Portugal – Inocêncio Oliveira
08/11/2013 - Leixoes Harbour, Matosinhos, Porto - Millais, Malcolm & Veron, Paul K
16/12/2013 – Matosinhos, Porto, Portugal – Inocêncio Oliveira
15/07/2014 - Le Rozel, Manche, France - Brinkhof, Lucien
01/01/2015 - Parque da Cidade, Matosinhos, Porto - Carneiro, Edna & Camilo
08-09-2015 - Matosinhos beach, Matosinhos, Portugal – José Marques
18-09-2015 - Leixoes Harbour, Matosinhos, Portugal – José Marques
29.09.2015 - Leixoes Harbour, Matosinhos, Portugal – José Marques
∞
Second set of periodic reports for the One State One Listen: Digital Audiobooks in Illinois grant on their way to the State Library... early.
Independent road safety report for work contracted by the Ministry of Transportation (MOT) in BC for the area of Creekside
to Nodic on HWY 99 on February 18, 2009 in Whistler BC Canada. Highway improvements handled by Alpine Paving principal
contracted by the Ministry of Transportation of BC. Highway maintenance handled by Maindroads Howe Sound Contracting.
Some photos are of the upgrades and others are of the current road state in general. You can tell which one is which by
the side of the road who is responsible for that specific section. In a photo facing the village, the right hand side of
the road is upgraded by Alpine Paving and both sides are maintainded by Mainroads Howe Sound Contracting.
Use a Twoonie to measure the depths when you see one in some photos.
This section of road is from Creekside to Nordic and has not been worked on yet by Alpine Paving the upgrade contractor.
The maintenance is handled from day to day by Mainroads Howe Sound Contracting in conjunction with MOT.
It is the recommendation of the report as follows:
1. Fix Road Drop Offs along North side of road near Nordic entrance
2. Increase road markings to warn motorists of upcoming end of lane road junction approximately 900 meters after lights at Creekside
3. Re-pave the road lines. Missing road lines both white and yellow are extremely dangerous at Nordic entrance. No white line to mark edge of road found at over 50% of area.
Please refer to section 8.5.15 Drop Offs of the government document titled MOT Traffic Management Guidelines linked below that applies to construction zones.
www.th.gov.bc.ca/publications/eng_publications/geomet/tra...
8.5.15 Drop-offs - MOT Traffic Management Guidelines
The Proponent shall conduct all operations to minimize any drop-offs (abrupt changes in
roadway elevation) left exposed to traffic during non-working hours. Unless otherwise
specified in the Traffic Control Plan, drop-offs left exposed to traffic during non-working
hours shall be delineated as follows:
• Drop-offs up to 60 millimetres, unless otherwise specified on the Traffic Control
Plan, may remain exposed with appropriate traffic control devices alerting
motorists of the condition. However, no drop-offs shall be allowed between
adjacent lanes of traffic.
• Drop-offs more than 60 millimetres that are in the roadway or shoulder shall be
delineated with appropriate traffic control devices and further delineated as
indicated in 3(c) below.
• Drop-offs more than 60 millimetres, but not more than 300 millimetres, that are
not within the roadway or shoulder shall be delineated with appropriate traffic
control devices and further delineated by having one of the following:
a) A wedge of compacted stable material (25 mm well-graded crushed base
course aggregate or better) placed at a slope of 4:1 or flatter.
b) Channelizing devices (Type 1 barricades, plastic safety drums, or other
devices one meter or more in height) placed along the traffic side of the dropoff
and a new edge of pavement stripe placed a minimum of two (2) metres
from the drop-off. Appropriate traffic control devices shall be placed in
advance of and throughout the drop-off treatment.
c) Temporary concrete barrier or other approved barrier installed on the traffic
side of the drop-off with 300 millimetres between the drop-off and the back of
the barrier and a new edge of pavement stripe a minimum of 500 millimetres
from the face of the barrier. An approved terminal, flare or impact attenuator
shall be required at the beginning of the section. For night use, the barrier
shall have reflective markers and/or warning lights.
This document linked below outlines the BC MOT TAC Rural Undived highway build specifications for a normal non-consruction zone.
www.th.gov.bc.ca/publications/eng_publications/geomet/TAC...
Please refer to reference measurement information linked below.
www.mint.ca/store/mint/learn/circulation-currency-1100028
$2 Dollar CAN Coin 1996 to date
Diameter (mm): 28
Thickness (mm): 1.8
60 mm according to design specification section 8.5.15 of MOT Traffic Management Guidelines dived by a 28 mm coin measurement is 2.14.
In the photos below an overall depth calculation beyond a 2.14 measurement in coins as reference is in default of the MOT Traffic Management Guidelines
minimum build specifications.
WXPN's XPoNential Music Festival 2012. Counting Crows, Delta Spirit, Field Report, We are Augustines, Kasey Anderson, Rhett Miller and the Serial Lady Killers, JD Souther, John Wesley Harding's Cabinet of Wonders, Kaki King, Diego Garcia, JD McPherson, Work Drugs, Dana Alexandra. 22 July 2012.