View allAll Photos Tagged Plastering

This picture is part of a large online photo album of renovation pictures of the new home and office of Designia / Verse Inhoud. Designia is Freelance Senior Graphic / Web / Interaction Designer Michiel Nagtegaal. Verse Inhoud is Freelance Communication Consultant Janette van Tol. Our home / office is located in Voorburg, The Netherlands.

This picture is part of a large online photo album of renovation pictures of the new home and office of Designia / Verse Inhoud. Designia is Freelance Senior Graphic / Web / Interaction Designer Michiel Nagtegaal. Verse Inhoud is Freelance Communication Consultant Janette van Tol. Our home / office is located in Voorburg, The Netherlands.

 

This picture is part of a large online photo album of renovation pictures of the new home and office of Designia / Verse Inhoud. Designia is Freelance Senior Graphic / Web / Interaction Designer Michiel Nagtegaal. Verse Inhoud is Freelance Communication Consultant Janette van Tol. Our home / office is located in Voorburg, The Netherlands.

Fontana, CA. These kids are up all over the place.

This picture is part of a large online photo album of renovation pictures of the new home and office of Designia / Verse Inhoud. Designia is Freelance Senior Graphic / Web / Interaction Designer Michiel Nagtegaal. Verse Inhoud is Freelance Communication Consultant Janette van Tol. Our home / office is located in Voorburg, The Netherlands.

 

Euroskills 2012. Day 2 2012-10-04.23 Plastering/Dry Wall Systems

Walls in Lounge and 2 Bedrooms needed making good prior to client decorating. Lounge chimney breast required some TLC too. Finally, new skirting installed once flooring contractor had laid laminate flooring.

jessie could not talk because of the plaster on her face, she tried to write on her leg.

This picture is part of a large online photo album of renovation pictures of the new home and office of Designia / Verse Inhoud. Designia is Freelance Senior Graphic / Web / Interaction Designer Michiel Nagtegaal. Verse Inhoud is Freelance Communication Consultant Janette van Tol. Our home / office is located in Voorburg, The Netherlands.

Euroskills 2012. Day 3 2012-10-05..23 Plastering/Dry Wall Systems.

During the plastering process the surface undergoes many transformations. There are stages where the surface will not look like the final product, DO NOT FRET! Since most finishes have exposed aggregates, the materials are troweled many times to compact the aggregate and tighten the matrix. The extra cement will come to the surface and will be washed away.

 

â—¦You will likely notice the crew moving around your pool quite rapidly once the plaster process has begun and that is because there is only so much time to work the material and make your pool look its best.

 

â—¦For this reason the crew may delay cleaning something up until after the plaster is set.

 

◦Don’t fret, the colored plaster is not like paint and can be cleaned off of most surfaces fairly easily.

 

Euroskills 2012. Day 2 2012-10-04.23 Plastering/Dry Wall Systems

Plastering the icon panels in our studio

This picture is part of a large online photo album of renovation pictures of the new home and office of Designia / Verse Inhoud. Designia is Freelance Senior Graphic / Web / Interaction Designer Michiel Nagtegaal. Verse Inhoud is Freelance Communication Consultant Janette van Tol. Our home / office is located in Voorburg, The Netherlands.

 

Plastering and dry Wall Systems

 

Photo: Isaac Handel

 

Permission for material – photographs and/or film or video – taken in connection with EuroSkills 2016, to be used for marketing or communication purposes by the organisation responsible for EuroSkills 2016, their contracted partners, exhibitors and the organisation responsible for WorldSkills Europe or any of its members.

Images and/or film is to be used free by the press when reporting about EuroSkills 2016, Skill Competitions or vocational education.

 

All competitors and staff have agreed to figure in photos from EuroSkills in ll partner and press media.

The organization can not answer for audience and non-EuroSkills staff.

This picture is part of a large online photo album of renovation pictures of the new home and office of Designia / Verse Inhoud. Designia is Freelance Senior Graphic / Web / Interaction Designer Michiel Nagtegaal. Verse Inhoud is Freelance Communication Consultant Janette van Tol. Our home / office is located in Voorburg, The Netherlands.

 

During the plastering process the surface undergoes many transformations. There are stages where the surface will not look like the final product, DO NOT FRET! Since most finishes have exposed aggregates, the materials are troweled many times to compact the aggregate and tighten the matrix. The extra cement will come to the surface and will be washed away.

 

â—¦You will likely notice the crew moving around your pool quite rapidly once the plaster process has begun and that is because there is only so much time to work the material and make your pool look its best.

 

â—¦For this reason the crew may delay cleaning something up until after the plaster is set.

 

◦Don’t fret, the colored plaster is not like paint and can be cleaned off of most surfaces fairly easily.

 

Internal plastering to new extension.

The smoother the foundation the better to keep termites from adhering their tunnels to the walls.

Snaps from a 6 day workshop on plastering a straw bale house with natural materials. Workshop took place in the Yalakom Valley in Statimc Territory (B.C.) and was taught by the Mud Girls.

Euroskills 2012. Day 2 2012-10-04.23 Plastering/Dry Wall Systems

Danny and Darren call themselves professionals??? Am tripping up on uneven floor. Did not let levelling compound dry. Put tiles on wet floor. Provided them with spacers and still could not get it right. The whole floor is going to have to be taken up and redone again.

Plastering inside the new operating theatre.

Plastering technique used to reface brick fireplace to a more contemporary look.

This picture is part of a large online photo album of renovation pictures of the new home and office of Designia / Verse Inhoud. Designia is Freelance Senior Graphic / Web / Interaction Designer Michiel Nagtegaal. Verse Inhoud is Freelance Communication Consultant Janette van Tol. Our home / office is located in Voorburg, The Netherlands.

Snaps from a 6 day workshop on plastering a straw bale house with natural materials. Workshop took place in the Yalakom Valley in Statimc Territory (B.C.) and was taught by the Mud Girls.

On assignment for Canned Creative, capturing images for a corporate website; It was great to be let loose on a construction site. I could have spent a whole day here capturing images of men at work.

This picture is part of a large online photo album of renovation pictures of the new home and office of Designia / Verse Inhoud. Designia is Freelance Senior Graphic / Web / Interaction Designer Michiel Nagtegaal. Verse Inhoud is Freelance Communication Consultant Janette van Tol. Our home / office is located in Voorburg, The Netherlands.

First time in Monaco mast climber is used for facade work.

The prep for new plaster is now complete, this includes:

 

â—¦Cutting and chipping under tile (if not being replaced)

â—¦Chipping around all fittings, lights, etc

â—¦Removing old fittings and preparing for new (if applicable)

 

Bond coat is applied to the pool to ensure the new material has a good surface to bond to. Plaster has a very smooth surface which doesn’t give the new plaster much to grab on to. The application of an epoxy based bond coat leaves a good rough texture that allows the new plaster to grab onto and form a solid bond preventing future delamination.

 

Design & Build | Gallery construction, House Extension, Design & Build, Plastering Rendering, brick work

Euroskills 2012. Day 3 2012-10-05..23 Plastering/Dry Wall Systems.

Summer (2014) - www.goingslowly.com

---

 

Featured in the following journals:

Finishing the Exterior Brown Coat (August 31st, 2014)

Walls in Lounge and 2 Bedrooms needed making good prior to client decorating. Lounge chimney breast required some TLC too. Finally, new skirting installed once flooring contractor had laid laminate flooring.

Newly plastered bathroom

plastering foam for substrates.

These are medical Head Blocks

cut a part and will soon be

candle holders.

The prep for new plaster is now complete, this includes:

 

â—¦Cutting and chipping under tile (if not being replaced)

â—¦Chipping around all fittings, lights, etc

â—¦Removing old fittings and preparing for new (if applicable)

 

Bond coat is applied to the pool to ensure the new material has a good surface to bond to. Plaster has a very smooth surface which doesn’t give the new plaster much to grab on to. The application of an epoxy based bond coat leaves a good rough texture that allows the new plaster to grab onto and form a solid bond preventing future delamination.

 

Wet Edge Prism Matrix Eclipse installed by Pearl Pool Plastering

  

1 2 ••• 8 9 11 13 14 ••• 79 80