View allAll Photos Tagged NewBuild

The family needed a space to gather and take advantage of the back yard. The new family room was modest in size, in keeping with the house, and was connected to the kitchen and the covered porch with a view to the pool.

BAM/PFA celebrated the mid-point of construction on its new downtown building with a public ceremony and block party on Addison Street on July 17, 2014. Over 500 people attended to show their support by signing one the last steel beams to be put in place. Photo: Peter Cavagnaro

This new building is next door to St Matthews Church and opposite Pounds Park. The building is multi-use with shops at street level. (to open 2024).

Please don't use this image on websites, blogs or other media .com without my explicit permission. All rights reserved.

© rogerperriss@aol.com

BAM/PFA celebrated the mid-point of construction on its new downtown building with a public ceremony and block party on Addison Street on July 17, 2014. Over 500 people attended to show their support by signing one the last steel beams to be put in place. Photo: Peter Cavagnaro

Port Aux Basques New Image 2016

BAM/PFA celebrated the mid-point of construction on its new downtown building with a public ceremony and block party on Addison Street on July 17, 2014. Over 500 people attended to show their support by signing one the last steel beams to be put in place. Photo: Peter Cavagnaro

BAM/PFA celebrated the mid-point of construction on its new downtown building with a public ceremony and block party on Addison Street on July 17, 2014. Over 500 people attended to show their support by signing one the last steel beams to be put in place. Photo: Peter Cavagnaro

The William Beaumont Army Medical Center hosted a ribbon cutting ceremony April 23 to open the new Fort Bliss Blood Donor Center.

 

Read the article: www.militaryblood.dod.mil/viewcontent.aspx?con_id_pk=1887

A set of pictures taken whilst the new swimming baths were being built in Nelson

Interesting time to post up this picture because as I'm putting this one up the bingo place is being pulled down!

Carmet Tug Company's newbuild, Multirole Easyworker 2080 "CT Barnston", does some anchor handling and chain work at Woodside Ferry Terminal as the tide ebbs.

 

Local lads doing amazing work yet again!

 

carmettugs.co.uk/

 

The weather went from raining to cloudy to sunny and back to raining so on and so forth. Typical lol

 

You can see how much the tide drops during the series of photos. In such a short amount of time, the time drops dramatically and at such a speed as it usually does on high springs.

 

Source of info: PDF from their website

 

CT Barnston multirole/multicat workboat

 

IMO: 9967938

 

MMSI: 232043206

 

Call Sign: MLZU5

 

Registered owner: CARMET TUG CO LTD

 

Vessel type: Easyworker 2080

 

Built: Groeneveldt Marine Construction B.V. 2022, Hendrik-Ido-Ambacht, Netherlands

 

Classification: Bureau Veritas, MCA Workboat Code Cat 2/60

 

Length: 20.08 meters

 

Beam: 8.00 meters

 

Draft: 1.60 meters

 

Gross tonnage: 70.60

 

Bollard pull: 15.0 tons

 

Speed: 9.0 knots

 

Main engines: 2 x Volvo Penta D 16 MH IMO 3

 

Total power: 1200 bhp

 

Gearboxes: Twin Disc MGX 516 DC

 

Propellers: 2 x 4 blade fixed pitch in nozzles @ 1350 mm

 

Generator sets: 1 x John Deere 135kVA and 1 x John Deere 65kVA

 

Electrical system: 24v DC and 220/415V connections

 

Fuel: 16,000 litres

 

Water: 7,000 litres

 

Deck crane: Fassi F800 RA (15,770kg @ 4.25m)

 

Deck winch: 18t SWL 8m/min

 

Tugger winch: 5t SWL, 9m/min

 

Deck capacity: 60 tonnes

New Kanab Field Office & Grand Staircase-Escalante National Monument Facility.

BAM/PFA celebrated the mid-point of construction on its new downtown building with a public ceremony and block party on Addison Street on July 17, 2014. Over 500 people attended to show their support by signing one the last steel beams to be put in place. Photo: Peter Cavagnaro

Large crane building the new Peace Palace Library

Ok, maybe not ugly but definitely not fitting in with the pre existing houses in the slightest.

  

Canon EOS 350D

Canon EF 50mm f/1.8 II

Carmet Tug Company's newbuild, Multirole Easyworker 2080 "CT Barnston", does some anchor handling and chain work at Woodside Ferry Terminal as the tide ebbs.

 

Local lads doing amazing work yet again!

 

carmettugs.co.uk/

 

The weather went from raining to cloudy to sunny and back to raining so on and so forth. Typical lol

 

You can see how much the tide drops during the series of photos. In such a short amount of time, the time drops dramatically and at such a speed as it usually does on high springs.

 

Source of info: PDF from their website

 

CT Barnston multirole/multicat workboat

 

IMO: 9967938

 

MMSI: 232043206

 

Call Sign: MLZU5

 

Registered owner: CARMET TUG CO LTD

 

Vessel type: Easyworker 2080

 

Built: Groeneveldt Marine Construction B.V. 2022, Hendrik-Ido-Ambacht, Netherlands

 

Classification: Bureau Veritas, MCA Workboat Code Cat 2/60

 

Length: 20.08 meters

 

Beam: 8.00 meters

 

Draft: 1.60 meters

 

Gross tonnage: 70.60

 

Bollard pull: 15.0 tons

 

Speed: 9.0 knots

 

Main engines: 2 x Volvo Penta D 16 MH IMO 3

 

Total power: 1200 bhp

 

Gearboxes: Twin Disc MGX 516 DC

 

Propellers: 2 x 4 blade fixed pitch in nozzles @ 1350 mm

 

Generator sets: 1 x John Deere 135kVA and 1 x John Deere 65kVA

 

Electrical system: 24v DC and 220/415V connections

 

Fuel: 16,000 litres

 

Water: 7,000 litres

 

Deck crane: Fassi F800 RA (15,770kg @ 4.25m)

 

Deck winch: 18t SWL 8m/min

 

Tugger winch: 5t SWL, 9m/min

 

Deck capacity: 60 tonnes

The Highland Council

Council House Build

Reference: 32354

20 Units social rent

Approved: March 2014

Completed: March 2017

Affordable Housing Supply Programme

Crown Copyright

Port Aux Basques New Image 2016

BAM/PFA celebrated the mid-point of construction on its new downtown building with a public ceremony and block party on Addison Street on July 17, 2014. Over 500 people attended to show their support by signing one the last steel beams to be put in place. Photo: Peter Cavagnaro

Plastics Pellet hopper built by Trinity Industries 1/16 Seen at West Colton 24th Jan 2016

The William Beaumont Army Medical Center hosted a ribbon cutting ceremony April 23 to open the new Fort Bliss Blood Donor Center.

 

Read the article: www.militaryblood.dod.mil/viewcontent.aspx?con_id_pk=1887

Carmet Tug Company's newbuild, Multirole Easyworker 2080 "CT Barnston", does some anchor handling and chain work at Woodside Ferry Terminal as the tide ebbs.

 

Local lads doing amazing work yet again!

 

carmettugs.co.uk/

 

The weather went from raining to cloudy to sunny and back to raining so on and so forth. Typical lol

 

You can see how much the tide drops during the series of photos. In such a short amount of time, the time drops dramatically and at such a speed as it usually does on high springs.

 

Source of info: PDF from their website

 

CT Barnston multirole/multicat workboat

 

IMO: 9967938

 

MMSI: 232043206

 

Call Sign: MLZU5

 

Registered owner: CARMET TUG CO LTD

 

Vessel type: Easyworker 2080

 

Built: Groeneveldt Marine Construction B.V. 2022, Hendrik-Ido-Ambacht, Netherlands

 

Classification: Bureau Veritas, MCA Workboat Code Cat 2/60

 

Length: 20.08 meters

 

Beam: 8.00 meters

 

Draft: 1.60 meters

 

Gross tonnage: 70.60

 

Bollard pull: 15.0 tons

 

Speed: 9.0 knots

 

Main engines: 2 x Volvo Penta D 16 MH IMO 3

 

Total power: 1200 bhp

 

Gearboxes: Twin Disc MGX 516 DC

 

Propellers: 2 x 4 blade fixed pitch in nozzles @ 1350 mm

 

Generator sets: 1 x John Deere 135kVA and 1 x John Deere 65kVA

 

Electrical system: 24v DC and 220/415V connections

 

Fuel: 16,000 litres

 

Water: 7,000 litres

 

Deck crane: Fassi F800 RA (15,770kg @ 4.25m)

 

Deck winch: 18t SWL 8m/min

 

Tugger winch: 5t SWL, 9m/min

 

Deck capacity: 60 tonnes

Passing Seaspan's Tilbury Island Terminal in Delta. Sporting the Flag of the Republic of China, heading upriver past Riverport in Richmond to Fraser Surrey Docks.

Angular construction on side of newbuild inWest Bar Sheffield

Oxford Road, Aylesbury, Bucks.

1 2 ••• 32 33 35 37 38 ••• 79 80