View allAll Photos Tagged Module

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

EUGRAPHO mated to XRMON-DIFF

 

MAXUS 9 Launch Campaign, ESRANGE, Kiruna, Sweden

 

NMK Photography

Facebook, Web

 

Disclaimer: Comments and photos that I post on my Flickr account are my own personally and do not necessarily reflect the official positions, outreach or opinions of my employer (ESA), or its affiliates, or any other organisations depicted here. I provide these images purely with the intention of sharing with interested parties in order to contribute to promotion of ESA activities.

Voskhod 1 descent module, 1964

The three cosmonauts' couches inside Voskhod were only fitted with difficulty, making the crew crane their necks to see the instrument panels. With no space for a means of escape to be fitted, a retrorocket slowed the spacecraft as it returned to Earth, enabling the cosmnauts to remain on board for the entire mission.

[Science Museum]

 

Taken from the Cosmonauts: Birth of the Space Age exhibition at the Science Museum (September 2015 to March 2016).

Looking down the mock-up of the ISS service module used for training

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

A productive evening on Scout Scar. Daughter got the better pictures.

This one is my favourite of the three. Whether it really uses the 3rd I'm not too sure. The base of the tree is at the bottom right intersection and the tree sort of follows the 3rd line. But the horizon isn't on the line. But that really didn't work.

The EM-C rage of infection disease isolation modules are inflatable and rapid deployment. These are compact and lightweight, and can be set up within 10 minutes. The sizes start from 3x3 metre and go all the way up to 10x10 metre.

The two modules can be joined together through a tunnel to form an interlocking patient and medical staff decontamination zones. These have individual doors to prevent contamination and transmission of infection. The entire structure weights just 18 kilograms, and packs down to a compact 45x45x60cm so that it can be stored along with other medical paraphernalia.

 

vimeo.com/398704827

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

Rear view of the APC and Command Control modules, showing access ramps deployed.

This stand held the module when it was out of the orbiter cargo bay and was sent to the Smithsonian along with the module.

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

T-trak module, N scale, with maintenance of way equipment and control tower. Still needs target indicators for switches, a couple of crew figures, one on tower deck, one (a bear) headed for outhouse at back.

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

engine mounts and new arms. the original BMW ones can go in the bin

The interior of a raised module. Every module is 48x48 and raised 2 bricks (or 6 plates). The technic cross inside keeps the baseplate from bending and twisting.

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

Custom JZA80 alarm indicator

Fundacion Proa

La Boca_ B.Aires.

Close-up of a module of cotton.

Johnson Space Center Houston Texas

module Bascetta star

carrés de 5 cm

papier bicolore

Dales Peak's basic module stacking configuration

Headed out to the local school playground for a bit of fun and photos. The light seemed fine, but it was getting to the point where the camera couldn't open the aperture wide enough, even at iso 800. Higher than that and it gets unacceptably noisy.

I was very intigued by these structures but I couldn't puzzle out what they were.

 

Tampere, 2001

Shots from the NMRA National Train Show in Milwaukee. A scene on the Free-Mo Layout.

The Medication Module is a terrific selection of the commonly needed over the counter medications. For travel or backcountry use. Module comes heat sealed in a resealable bag for easy access and storage.

 

Contents:

 

24 Aspirin, 325 mg Tablet

24 Acetaminophen, 325 mg Tablet

24 Ibuprofen, 200 mg Tablet

24 Diphenhydramine, 25 mg Capsule

24 Diamode, 2 mg Tablet

24 Diotame Tablet

24 Alamag Tablet

1 Glutose, 25 mg Tube

3 Cera Lyte 70, 50 g Packet, Lemon

1 Aloe Vera Gel, 0.75 oz.

12 Triple Antibiotic Ointment

12 Hydrocortisone Cream 1%

1 Instructions

 

15 oz.

8" x 10"

Possible submission for Module 6.

Taken in my back garden.

Olympus E620

Zuiko Digital 35mm macro lens

On-camera flash

F9.0 @ 1/180 second exposure

+0.3 EV flash compensation

design build module 06'

Work produced by IDI's Illustration students for their Thinking about Ideas 1A module - The final outcome was to produce a Monogram Workshop Poster.

Module Building

 

Though many varieties of module builders and even combined module builder pickers exist, a typical module builder is a large trailer that is moved by a tractor and remains stationary when used. The wheels are often hydraulically retracted when the module builder is operational. A module builder is about 30 ft. long, 12 ft. high and 10 ft. wide. It works similarly to a garbage truck. When loading the cotton from the cotton picker into the module builder it should be distributed as evenly as possible. After loading the cotton into the module builder, a hydraulic compactor moves up and down along the length of the machine. This process is repeated every time that a cotton picker is unloaded into the module builder until a module is built up and discharged through the tailgate of the machine. The module is stored on the field and the module builder is moved into a new position to build up another module. The weight of one module is about 10 metric tons. (22046.2 lbs.)

   

In 2002 the ASABE (American Society of Agricultural and Biological Engineers) dedicated the cotton module builder as an historic landmark of agricultural engineering, naming it "one of the top three inventions in mechanized cotton production.”

 

2008ko maiatzaren 13an, Spraikada, Euskal Herriko Graffiti Lehiaketaren izen eta irudi berria, aurkeztu zuten Bilboko Kalderapeko gunean Topagunea, Bizkaiko Foru Aldundia, Eusko Jaurlaritza eta Erandioko Udaleko gazte arloetako ordezkariek. Izan ere, Txorierriko udalerri horretan burutuko zen bosgarren edizoaren lehiaketa, uztailaren 19an. Argibide gehiagorako: www.ukberri.net/modules.php?op=modload&name=News&...

ITEM: LED Rear Turn Signal Kit M Ver.2 for 2011-2013 Hyundai 5G Grandeur HG / Azera

MANUFACTURER: IONE (Tuning Factory)

ORIGIN : MADE IN KOREA

CONTENTS: LED Module - 2PCS (RH/LH).

1 2 ••• 31 32 34 36 37 ••• 79 80