View allAll Photos Tagged Module

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

Optimum assortment of equipment for field suturing and debridement. Everything necessary for the suturing process with size and weight kept to a minimum. Needle holder, scissors, and forceps are sterile and ready to use. Module comes heat sealed in a resealable bag for easy access and storage.

 

Licensed professionals have the option of adding Lidocaine 1% Plain Injectible (local anesthetic) to complete the kit. See related product to order Lidocaine.

 

Contents:

 

STERILE INSTRUMENT PACK

1 Webster Needle Holder, 5"

1 Scissors, 5-1/2" Straight, Sharp/Blunt

1 Iris Tissue Forceps, 4-1/4", 1x2 Teeth

 

INSTRUMENTS

1 Nylon Suture w/Cutting Needle, 3-0

1 Nylon Suture w/Cutting Needle, 5-0

1 Scalpel Handle and blade, #11

 

SYRINGES/NEEDLES

2 3 ml Syringe

2 30 ga x 1/2" Needle

2 21 ga x 1-1/2"

1 20 ml Irrigation Syringe w/18 ga Catheter Tip

 

WOUND MANAGEMENT

1 ChlorPrep FREPP Applicator, 1.5 mL

1 1 oz Povidone Iodine, 1%

4 Triple Antibiotic Ointment

2 Sterile Surgeon's Gloves, Size 8

1 Sterile Drape

2 Benzoin Swab

20 Wound Closure Strips, 1/4"x4"

1 Porous Tape, 1"x10yd

2 Non-Adherent Dressing, 3"x4"

1 Primed Compressed Gauze

1 CoFlex AFD, 2"

1 Hazardous Waste Bag

1 Instructions

 

6" x 7.5" x 2.5"

14 oz.

 

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

Presidential Leadership Scholars - Mt. Vernon, VA. Photo by Grant Miller for the Presidential Leadership Scholar Program.

 

www.presidentialleadershipscholars.org/

Development Impact and the PhD scholarship - Road Map training, December 2013

Cumberland Lodge, Windsor

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

Lego modules forming a goblin fortress for the RPG "Äventyr". A Swedish beginners RPG for children of ages 7+. The legomodules were built specifically for the gaming event Nordsken #2 in skellefteå 28-30 september 2012

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

PLS scholars at George Washington's Mount Vernon. Photo by Grant Miller for the Presidential Leadership Scholar Program.

 

www.presidentialleadershipscholars.org/

Development Impact and the PhD Scholarship - Tool Kit training held at Cumberland Lodge, Windsor from 30 July - 1 August 2014

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

Combo module using a visaton speaker and a TDA2030 amplifier IC. This is the 1st one, i will build a 2nd one, both are for my 9U portable system.

Combo module using a visaton speaker and a TDA2030 amplifier IC. This is the 1st one, i will build a 2nd one, both are for my 9U portable system.

Roughed-out "brick sketch" of SHIP module

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

Stackable modules for my Soropolis project.

Door with pink entrance hall - decorated window - pink door - candlelight date - men's club gathering - sand red roof - green house with blue windows - window with shutters - roof with girl in dormer window - guy emptying bucket

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

Technicians at the Airbus facility in Bremen, Germany prepare the European Service Module for shipment to Kennedy Space Center. The service module departed for Germany 5 November 2018 and arrives in the 6 November in USA.

 

For the first time, NASA will use a European-built system as a critical element to power an American spacecraft, extending the international cooperation of the International Space Station into deep space. The European Service Module is a unique collaboration across space agencies and industry including ESA’s prime contractor, Airbus, and 10 European countries. The completion of service module work in Europe and shipment to Kennedy signifies a major milestone toward NASA’s human deep space exploration missions to the Moon and beyond.

  

Credit: NASA–Rad Sinyak

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

A triangular module from which

this... can be made, among many other models of course.

Development Module for PhD Scholars

Road Map workshop at Cumberland Lodge, Windsor

1 2 ••• 18 19 21 23 24 ••• 79 80