View allAll Photos Tagged Load
Local Band Big Loader played in Comans of Tipperary Town on Saturday the 13th. Some shots from the night taken with a low shutter speed ranging from 1" in nightmode to roughly 3" using Bulb in Manual
(first real attempt at HDR)
Check here for more info on the band www.facebook.com/bigloader
EMS and Fire personnel load a patient into a Mercy Flight ship for transport to Erie County Medical Center.
Photograph Name: 1540-000-009_639p_Frederica_fill
Photograph Number: 639p
Description: Loading fill for the Frederica causeway, 1921. The steam shovel is loading a Ford one-ton truck, two shovels of dirt to each truck.
Date: 1921
Collection: RG 1540-000-009
Collection Name: State Highway Department Photograph Collection
Part of the force’s role is to escort abnormal loads across the road and motorway networks.
Earlier this month we assisted with the movement of a bridge section.
GMP officer took over from our Cheshire colleagues and escorted the load to the Yorkshire border.
You should call 101, the national non-emergency number, to report crime and other concerns that do not require an emergency response.
Always call 999 in an emergency, such as when a crime is in progress, violence is being used or threatened or where there is danger to life.
You can also call anonymously with information about crime to Crimestoppers on 0800 555 111. Crimestoppers is an independent charity who will not want your name, just your information. Your call will not be traced or recorded and you do not have to go to court or give a statement.
You can access many of our services online at www.gmp.police.uk
The Kiln Access Ramp gets personnel and equipment in and out of the kiln safely. The kiln is an island without access to it. Each ramp is custom
designed by certified professional engineer, made
of high grade 6061-T6 Aluminum Our ramps are
as strong as steel half the weight of other steel
ramps. With safety as the priority, kiln access should
be engineered to take into account the burn floor
configuration and what custom fit will the plant need
to safely and easily provide access into the kiln.
Saw this one coming as we were driving southbound on old Bruce Hwy. Another load for Hay Point or Dalrymple Bay
*3700 class loco details
Road numbers: 3701–63
Operator: Aurizon
Gauge: 1067 mm (3'6")
Year of entry into service: 2005
Number built: 63
Model: CL640m
Manufacturer: United Group Rail/Siemens
Manufacturing location: Bohle (Townsville) Qld; Broadmeadow, NSW
Engine: 25 kV electric
Traction power: 4000 kW
Wheel arrangement: Bo-Bo-Bo
Weight: 126.0 t
Length: 19.4 m
Sixty-three units were rebuilt from the 3100 and 3200 Classes from 2005 to become the 3700 Class. The rebuild included the removal of one of the cabs. They operate in freight haulage on Queensland’s electrified network, with all members of the class continuing in service.
*Info from www.railtram.com.au/3700-class
From Wikipedia, the free encyclopedia
Goonyella System;
Line length477 km (296 mi)
Track gauge1,067 mm (3 ft 6 in)
Electrification25 kV 50 Hz AC OHLE
Operating speed100 km/h (62 mph)
The Goonyella railway system is located in Central Queensland, Australia. It services the coal mining area of the Bowen Basin, carrying coal to the Hay Point and Dalrymple Bay Coal Terminals 20 km southeast of Mackay, as well as products to other destinations by way of connections to the North Coast Line at Yukan and the Central Line at Burngrove via the Gregory coal mine branch. It is also connected to the coal loading terminal at Abbot Point (20 km northwest of Bowen) by the GAP line. The line opened on 5 November 1971 and runs for 477 kilometres. The Goonyella system is narrow gauge 1,067 mm (3 ft 6 in) and electrified using 25 kV 50 Hz.[3] The line has been duplicated from Hay Point to Wotonga (174 km) and features CTC signalling over the entire system.
Mines
The Goonyella Coal Chain services 25 mines, carrying coal from BHP Mitsubishi Alliance, Anglo Coal, Bravus Mining & Resources, Macarthur Coal, Peabody Energy Australia, Xstrata and ANCI. The system currently operates under a demand-pull model, with rail haulages being designated by the ports, and the shipping system.
The rail line transports coal from the German Creek coal mine, Foxleigh coal mine, Norwich Park coal mine, Lake Vermont Mine, Saraji coal mine, Peak Downs Mine, Millennium Mine, Poitrel Mine, Moorvale Mine, Burton Downs Mine, Carborough Downs Mine, Issac Plains Mine, Moranbah North coal mine, Goonyella Riverside Mine, Hail Creek coal mine, Clermont Mine, Riverside Mine, North Goonyella coal mine, South Walker Creek coal mine, and Blair Athol coal mine.
Not something you see very often but this is the second time in a few weeks I have seen lorries like this!!! Presume they are now coming back :-)
Apologies for the reflection in the photo but this was a very quick shot from my bedroom window.
Also apologies for not commenting much recently, things just a bit exhausting here at the moment.
Just a quick page for me today... my middle boy a few years ago now- I don't have much purple in my life. :-)
LOAD Festival,
Presented by the Daydream Network,
Royal Albert Hall,
15/6/2009
Artists: Ben Slow, Eyesaw, Dan K, Snik, Blam, Grafter, Babel, Finbarr Dac, DBO.
(Long long over due photos from aw nice exhibition!)
Another beautiful day at work.
Sky was blue, clouds are white, and everything strangely peaceful.
Then huge truck came by to the loading bay.
I have always found these huge trucks sexy on the road, maybe it's just because they are so enormous.
Through a nostalgia lens and processor, my workspaces look more dreamy than it is.
A temporary set of stairs with landing was built for guests to access the dock. A private party was held inside and this was the only way to gain access.
The stairs were secured to the dock to keep everything stable and safe.
Call 781-246-0101 or Email Mark for more Info
The Kiln Access Ramp gets personnel and equipment in and out of the kiln safely. The kiln is an island without access to it. Each ramp is custom
designed by certified professional engineer, made
of high grade 6061-T6 Aluminum Our ramps are
as strong as steel half the weight of other steel
ramps. With safety as the priority, kiln access should
be engineered to take into account the burn floor
configuration and what custom fit will the plant need
to safely and easily provide access into the kiln.
Day 28
Inspiration : Where
Journaling reads:
"destination
i might not be where i thought i was going...but i think i'm right where i am supposed to be. 5/13"
Supplies used:
Cardstock: Georgia Pacific [white], Papertrey Ink [aqua mist, true black]
Patterned paper: Jillibean Soup [grey]
Transparency: Hambly
Die cut: Sizzix
Stamps: Heidi Swapp [destination], Papertrey Ink [dots]
Tiny Staples: Tim Holtz
Ink: Versafine [black], Papertrey Ink [aqua mist]
Adhesive: Darice [pop dots], Tombow, Scotch
Pen: Staedtler
Thanks for looking!
LOAD Festival,
Presented by the Daydream Network,
Royal Albert Hall,
15/6/2009
Artists: Ben Slow, Eyesaw, Dan K, Snik, Blam, Grafter, Babel, Finbarr Dac, DBO.
(Long long over due photos from aw nice exhibition!)
2Lt Andrew Starkey, assigned to US Army Europe’s 173rd Airborne Brigade Combat Team, loads his gear before joining his soldiers in a training operation. Starkey is here supporting Dragon 11, a multinational training event between Poland, the U.S., Canada and a few members from UK. Over 100 members of US Army Europe's 173rd Airborne Brigade Combat Team along with more than 20 members of the Royal Canadian Regiment, are here in Mirosławiec Poland, training and developing relationships with the Polish military. These are some of the same soldiers that will deploy with Polish troops to Afghanistan. US Army Europe Public Affairs photo by Richard Bumgardner.