View allAll Photos Tagged Line3
Construcción de la estación "Mercado del Mar", de la línea 3 del tren ligero de Guadalajara, México. 2017.
Hyderabad Metro Rail (HMR) Phase-I under-construction. This stretch is part of Stage-I (Nagole-Mettuguda) of Line 3 (Nagole-Shilparamam)
Raw File: image_17 (Picmarkr).IMAG7348.22062014
Construcción de la estación "Mercado del Mar", de la línea 3 del tren ligero de Guadalajara, México. 2017.
Feb. 2, 2022. Danvers, MA.
Climate activists from 350 Mass and other local climate change groups held a protest at the Danversport Yacht Club where the North Shore Chamber of Commerce was holding its “Business Insight Breakfast: Energy Forum.” The breakfast focused on renewable energy and featured speaker from Enbridge and National Grid. According to protesters both Enbridge and National grid have failed to transition to clean energy and are greenwashing the public by refusing to make hard commitments to immediately transition off fossil fuels. Enbridge and National Grid continue to fund fossil fuel projects. Enbridge built a gas compressor in Weymouth, MA despite local concerns about safety of the surrounding community and constructed Line 3 in Minnesota through untouched wetlands and the treaty territories of Anishinaabe peoples and is currently under investigation for aquifer breaches while National Grid is constructing pipelines and replacing liquified natural gas vaporizers as well as investing billions in gas pipelines.
Construcción de la estación "Mercado del Mar", de la línea 3 del tren ligero de Guadalajara, México. 2017.
Construcción de la estación "Mercado del Mar", de la línea 3 del tren ligero de Guadalajara, México. 2017.
Hyderabad Metro Rail Project Phase-I under construction in Begumpet near Taj Vivanta part of Stage III of Line-3 part of Phase-I (71+ km) of the project.
Raw File: image_15 (Picmarkr).IMAG6722.12042014
Construcción de la estación "Mercado del Mar", de la línea 3 del tren ligero de Guadalajara, México. 2017.
Artists/activists at with local environmental advocacy group 350 Madison urge the shutdown of the Enbridge Line 3 pipeline in front of the Wisconsin State Capitol. Photo credit: Chali Pittman/WORT News.
Hyderabad Metro Rail project under-construction near Genpact Office in Habsiguda. This is part of the Stage-I (Nagole to Mettuguda) of Line-3 (Nagole-Shilparamam) of 71+km Phase-I being built in entirety by the concessionaire L&T Metro Rail (Hyderabad) (www.ltmetro.in/). This stage is entirely on Inner Ring Road (IRR).
Raw File: image_11 (Picmarkr).DSC08682.02052014
Construcción de la estación "Mercado del Mar", de la línea 3 del tren ligero de Guadalajara, México. 2017.
int line1[] = {0,1,1,1,1,1,1,0,0,1,1,1,1,1,0,0,1,1,0,0,1,1,0,0,1,1,0,0,0,1,1,0,0};
int line2[] = {0,1,1,1,1,1,1,0,0,1,1,0,1,1,0,0,1,1,0,0,1,1,0,0,1,1,1,0,0,1,1,0,0};
int line3[] = {0,0,0,1,1,0,0,0,0,1,1,0,1,1,0,0,1,1,0,0,1,1,0,0,1,1,1,0,0,1,1,0,0};
int line4[] = {0,0,0,1,1,0,0,0,0,1,1,0,1,1,0,0,1,1,1,1,1,1,0,0,1,1,0,1,0,1,1,0,0};
int line5[] = {0,0,0,1,1,0,0,0,0,1,1,0,1,1,0,0,1,1,1,1,1,1,0,0,1,1,0,1,0,1,1,0,0};
int line6[] = {0,1,0,1,1,0,0,0,0,1,1,0,1,1,0,0,1,1,0,0,1,1,0,0,1,1,0,0,1,1,1,0,0};
int line7[] = {0,1,1,1,1,0,0,0,0,1,1,0,1,1,0,0,1,1,0,0,1,1,0,0,1,1,0,0,1,1,1,0,0};
int line8[] = {0,0,1,1,0,0,0,0,0,1,1,1,1,1,0,0,1,1,0,0,1,1,0,0,1,1,0,0,0,1,1,0,0};
Nagole Metro Station of Hyderabad Metro Rail (HMR) Phase-I under-construction. The viaduct on the left side of the pic is for the trains to land in the Uppal depot, entrance of which can be seen. The concessionaire for the project is L&T Metro Rail (Hyderabad) Ltd. This stretch is part of Stage-I (Nagole-Mettuguda) part of Line 3 from Nagole to Shilparamam.
Test run on this line started on 07-AUG-2014. Trial runs are expected to launch soon and expected completion of this stage is Mar/Apr 2015 on schedule.
Raw File: image_14 (Picmarkr).IMAG7736.13082014
Nagole Metro Station of Hyderabad Metro Rail (HMR) Phase-I under-construction. The concessionaire for the project is L&T Metro Rail (Hyderabad) Ltd. This stretch is part of Stage-I (Nagole-Mettuguda) part of Line 3 from Nagole to Shilparamam.
Test run on this line started on 07-AUG-2014. Trial runs are expected to launch soon and expected completion of this stage is Mar/Apr 2015 on schedule.
Raw File: image_13 (Picmarkr).IMAG7735.13082014
Hyderabad Metro Rail Project Phase-I under construction at Shyamlal in Begumpet near Taj Vivanta part of Stage III of Line-3 part of Phase-I (71+ km) of the project. This photo is taken from the bus stand on Secunderabad side looking towards Begumpet flyover..
Raw File: image_20 (Picmarkr).IMAG6727.12042014
Divest from Wells Fargo!
November 6, 2017 - San Francisco
Guerrilla street painting outside Wells Fargo World Headquarters in San Francisco. No funding for fossil fuel pipelines and projects! Action organized by Idle No More SF Bay and allies.
No DAPL - KXL - Trans Mountain Pipeline - Line 3.
The image is Thunderbird Woman Rising.
Construcción de la estación "Mercado del Mar", de la línea 3 del tren ligero de Guadalajara, México. 2017.
#DefundLine3 solidarity actions at Chase branches and PNW HQ in Seattle!
Solidarity action link: t.co/EgE7rHBe3Q
📢 Chase is banking Enbridge's #Line3 #TarSands pipeline. 📢
Our friends at 350 Seattle visited Chase on February 18, 2021 visiting Chase to demand they stop banking Enbridge's Line 3 tar sands pipeline.
Construcción de la estación "Mercado del Mar", de la línea 3 del tren ligero de Guadalajara, México. 2017.
Company: Kolumbus
Operator: Norgesbuss
Line: 3 Sundelia
Bus number: 2262
Registration plates: RL 11237
Bus: Mercedes-Benz O530G Citaro C2
Contact me if you want to use the photo
Construcción de la estación "Mercado del Mar", de la línea 3 del tren ligero de Guadalajara, México. 2017.
Company: Kolumbus
Operator: Norgesbuss
Line: 3 Sundelia
Bus number: 2262
Registration plates: RL 11237
Bus: Mercedes-Benz O530G Citaro C2
Contact me if you want to use the photo
Hyderabad Metro Rail project under-construction in Habsiguda. This is part of the Stage-I (Nagole to Mettuguda) of Line-3 (Nagole-Shilparamam) of 71+km Phase-I being built in entirety by the concessionaire L&T Metro Rail (Hyderabad) (www.ltmetro.in/). This stage is entirely on Inner Ring Road (IRR).
Raw File: image_6 (Picmarkr).DSC08677.02052014
Construcción de la estación "Mercado del Mar", de la línea 3 del tren ligero de Guadalajara, México. 2017.
France, Paris, le 30 mars 2008. Metro, ligne 3, la station Villiers est en travaux, des affiches datant des annees 80 apparaissent. 17th arrondissement.
France, Paris, March, 30, 2008. Parisian subway, line 3, Villiers station in works, posters from the 80s appear.
*** Reproduction interdite sans autorisation, tous droits reserves. No reproduction without authorization, all rights reserved,
Construcción de la estación "Mercado del Mar", de la línea 3 del tren ligero de Guadalajara, México. 2017.
The Phase-I of the project Hyderabad Metro Rail under-construction near Mettuguda metro station in Hyderabad. The concessionaire for the project is L&T Metro Rail (Hyderabad) Ltd. This stretch is part of Stage-I (Nagole-Mettuguda) part of Line 3 from Nagole to Shilparamam, Hitech City.
Test run on this line started on 07-AUG-2014. Trial runs are expected to launch soon and expected completion of this stage is Mar/Apr 2015 on schedule.
Raw File: image_2 (Picmarkr).IMAG7962.07092014