View allAll Photos Tagged Hitachi

From a front cover to a brochure on Hitachi Railway Cranes

On a -6 degree morning, my friend Hitachi was uncertain as to what I was going to do... Mostly about the Cold !!

GWR Hitachi Class 800 No.800013 passes Tiverton Loop,with the 12:33 London Paddington to Exeter St Davids service,passing DC Rail Class 60 No.60055 on the rear of the 13:36 Newton Abbot Hackney Yard to Willesden DC Rail working,on the 21st of March 2022.

Al Bauma di Monaco si va anche per vedere macchine che in Italia non si vedranno mai....

Monaco (D) 20-04-2013

 

You go to Bauma also to see the big excavators never seen in Italy...

Bauma 2013

Munich (D) 20-apr-2013

 

I will visit Bauma 2016 from 12 to 14 april...I hope to meet my flickr followers.

Construction du programme Mosaic comprenant 3 bâtiments pour 184 logements.

 

Pays : France 🇫🇷

Région : Grand Est (Lorraine)

Département : Meurthe-et-Moselle (54)

Ville : Nancy (54000)

Quartier : Nancy Est

Adresse : 58, boulevard d'Austrasie

Fonction : Logements

 

Construction : 2018 → 2021

Architecte : Oslo Architectes

Gros œuvre : WIG France

PC n° 54 395 17 R0028 délivré le 08 août 2017

 

Niveaux : R+5

Hauteur : 20.50 m

Surface de plancher : 9 660,90 m²

Superficie du terrain : 6 355 m²

Travaux d'aménagement d'un îlot de fraicheur à la place de la fontaine principale dans le parc de la Pépinière à Nancy.

Ce nouvel aménagement comprend 70 jets et brumisation ainsi que 700 m² d'espaces engazonnés supplémentaires autour de la fontaine.

 

Pays : France 🇫🇷

Région : Grand Est (Lorraine)

Département : Meurthe-et-Moselle (54)

Ville : Nancy (54000)

Quartier : Nancy Centre

Adresse : boulevard du 26ᵉ RI

 

Durée des travaux : décembre 2021 → mai 2022

Montant prévisionnel des travaux : 943 390 € HT

DP 54 395 20 R0949 délivrée le 24/11/2020

Hitachi IEP Class 802 101 in GWR green passes through Taunton in 9 car formation working 5Z22 11:03 Paddington to Exeter St Davids passed at 1426.

Construction du Collège du Plateau de Haye à Nancy. Il va remplacer les collèges Jean-de-la-Fontaine (Laxou) et Claude-le-Lorrain (Nancy). Il accueillera 400 élèves et une cuisine pour 250 demi-pensionnaires.

 

Pays : France 🇫🇷

Région : Grand Est (Lorraine)

Département : Meurthe-et-Moselle (54)

Ville : Nancy (54000)

Quartier : Plateau de Haye

Adresse : avenue du Rhin

Fonction : Éducation

 

Construction : 2025 → 2027

Architecte : Mil Lieux architectes

 

Niveaux : R+2

Hauteur : ≈12,00 m

Surface de plancher : 4 139 m²

Hitachi Motor cars 222M and 80M stored at the West Block of Newport Workshops.

 

These two cars are currently owned by Elecrail, a subdivision of Steamrail Victoria.

 

They are in long term storage until further notice.

 

Newport Workshops, Vic.

8/7/19

GWR Hitachi Class 800 No.800305 heads towards Norton Fitzwarren,with the 13:08 Paignton to London Paddington service,on the 1st of September 2018.

La Hitachi de la serie 1000 al frente de un largo mercancías procedente de Tupiza con destino Machacamarca a su salida con las luces del ocaso de la estación de Uyuni.

 

Debido a la escasa luz existente para realizar una foto convencional me decidí por un panning shot para salvar la situación y el resultado creo que no desmerece.

 

Uyuni, Potosí (Bolivia). Año 2013.

Inside the Hitachi Santa House at The Endless Wonder Christmas Village, Ngee Ann City Civic Plaza, Orchard Road for the Christmas Festival 2017 celebrations.

Hitachi Motor car 222M stored at the West Block of Newport Workshops.

 

This and 80M are currently owned by Elecrail, a subdivision of Steamrail Victoria.

 

They are in long term storage until further notice.

 

Newport Workshops, Vic.

8/7/19

GWR Hitachi Class 802 No.802017 heads towards Charlton Bridge,with the 11:20 Bristol Temple Meads to Wantage Road test working,on the 1st of November 2018.

Leica M Typ240 + Voigtlander Super Wide-Heliar 15mm F4.5

800001 passes widmerpool on a test run on the old dalby test track 19/08/15

Travaux de renouvellement de la conduite et des branchements d'eau potable et création d'une conduite de refoulement rue du Sergent Blandan à Nancy.

 

Pays : France 🇫🇷

Région : Grand Est (Lorraine)

Département : Meurthe-et-Moselle (54)

Ville : Nancy (54000)

Quartier : Nancy Sud

Adresse : rue du Sergent Blandan

 

Durée des travaux : août 2018 → décembre 2018

Chantier de déconstruction de l'immeuble Blanc Sycomore dans le cadre du programme de rénovation urbaine.

 

Pays : France 🇫🇷

Région : Grand Est (Lorraine)

Département : Meurthe-et-Moselle (54)

Ville : Nancy (54000)

Quartier : Nancy Nord

Adresse : place Jules Verne

Fonction : Logements

 

Construction : 1963 → 1965

Architecte : Bernard Zehrfuss

Déconstruction : 2012

Entreprise : Melchiorre Démolition

 

Niveaux : R+17

Hauteur : 49.00 m

Hitachi Class 800 800002 departs from Hereford with the 12:30 (5 late) 5X25 to Worcester Shrub Hill. 800002 is the first IET to visit Hereford; these units will become a regular sight here in less than a year and will remain so for a good number of years,although they probably won't be white.

Arundel, West Sussex

GWR Hitachi Class 800 No.800008 passes Coedkernew,with the 06:48 London Paddington to Swansea service,on the 10th of August 2021.

Hitachi Class 800 800002 waits for departure from Hereford with the 12:14 5X25 to Worcester Shrub Hill.

Seen working in Christchurch

Travaux de terrassement rue Georges de la Tour / boulevard de la Mothe à Nancy.

 

Pays : France 🇫🇷

Région : Grand Est (Lorraine)

Département : Meurthe-et-Moselle (54)

Ville : Nancy (54000)

Quartier : Nancy Est

Adresse : rue Georges de la Tour

Mazzocchi Wrecking

East Hanover, NJ

OLYMPUS DIGITAL CAMERA

Seen just after being offloaded on Worthing Beach in West Sussex

the interior of the no longer in service Hitachi trains

GWR Hitachi Class 800 No.800310 heads towards Powderham,with the 10:33 London Paddington to Paignton service,on the 26th of November 2018.

1 2 3 4 6 ••• 79 80