View allAll Photos Tagged GCS

Photograph from Douglas Aircraft Co. Reverse caption: "Technicians making final adjustments to floor grid platform prior to mating to forward half of Mockup."

Technician installing plenums for the environmental control systems.

Forward half of mockup being leveled prior to load testing of floor platform.

Floor support bean structure being painted.

Technicians installing aluminum liner after adhesive has been applied.

Photograph from Douglas Aircraft Co. Reverse caption: "Prefitting of floor grid sections performed at Douglas Missile & Space Systems Division, Santa Monica, California, prior to delivery to Douglas Space Systems Center."

Forward half of mockup being lowered onto floor grid platform.

Photograph from Douglas Aircraft Co. Reverse caption: "Orbital Workshop floor grid being machined at sub-contractor facility (LePar Engineering Company)."

Photograph from Douglas Aircraft Co. Reverse caption: "Close up view showing floor grid sections following prefitting and assembly."

Seen on the M4 near Reading.

Forward half of mockup being leveled prior to load testing of floor platform.

Glasgow Vintage Vehicle Trust museum Bridgeton

From December's Cars & Coffee at Cafe Bella.

Grant Central Station

1 2 ••• 4 5 7 9 10 ••• 79 80