View allAll Photos Tagged GCS

Some scans of recently discovered old 6 x 4 prints taken by myself back in the 1980s and 1990s. These were taken with my trusted Canon AE1 camera and at the time I didn’t think some of them were good enough to use however, I thought some might find them interesting and that I would now share them.

Douglas engineers conducting All Systems Test on S-IVB 506.

Had to do the tourist shot :)

Boeing 737 SU-GCS de egytair con la librea de star Alliance aterrizando en el aeropuerto de Madrid- Barajas.

Steered through the site in Plymouth by TCS.

Villagers made ‘Sasi adat’ for avocado tree, a local traditional resource management system, encompasses temporal prohibitions on harvesting crops products in Honitetu village, West Seram regency, Maluku province, Indonesia on August 23, 2017.

 

Photo by Ulet Ifansasti/CIFOR

 

cifor.org

 

forestsnews.cifor.org

 

If you use one of our photos, please credit it accordingly and let us know. You can reach us through our Flickr account or at: cifor-mediainfo@cgiar.org and m.edliadi@cgiar.org

Photograph from Douglas Aircraft Co. Reverse caption: "Floor grid ready for delivery."

Photograph from Douglas Aircraft Co. Reverse caption: "A final inspection of a machined panel."

Technician installing plenums for the environmental control systems.

Floor support bean structure being painted.

Technicians installing aluminum liner after adhesive has been applied.

Photograph from Douglas Aircraft Co. Reverse caption: "Upon completion of profiling, machinist removes floor grid for inspection and approval."

Photograph from Douglas Aircraft Co. Reverse caption: "Prefitting of floor grid sections performed at Douglas Missile & Space Systems Division, Santa Monica, California, prior to delivery to Douglas Space Systems Center."

Forward half of mockup being leveled prior to load testing of floor platform.

Seen on the M4 near Reading.

Photograph from Douglas Aircraft Co. Reverse caption: "Orbital Workshop floor grid being machined at sub-contractor facility (LePar Engineering Company)."

Photograph from Douglas Aircraft Co. Reverse caption: "Technicians making final adjustments to floor grid platform prior to mating to forward half of Mockup."

Photos taken during the 2017 GVVT open weekend.

Photograph from Douglas Aircraft Co. Reverse caption: "Close up view showing floor grid sections following prefitting and assembly."

Forward half of mockup being lowered onto floor grid platform.

1 2 3 4 6 ••• 79 80